06D03626↗

City of Winston-Salem received this grant or assistance award from Environmental Protection Agency: $2.80M obligated so far for congressionally mandated projects. Its latest action was on 2026-05-28.

Key facts · data as of Nov 14, 2026

Recipient
City of Winston-Salem
Awarding agency
Environmental Protection Agency
Obligated to date
$2.80M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 06D03626, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_06D03626_068

DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING IN THE AMOUNT OF $2,800,000 TO THE CITY OF WINSTON-SALEM, NORTH CAROLINA TO SUPPORT THE IMPLEMENTATION OF ITS RUNNYMEDE WATER INFRASTRUCTURE IMPROVEMENTS PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF THE DRINKING WATER, WASTEWATER, AND STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECTS. WORKPLAN ACTIVITIES CONSIST OF INSTALLING APPROXIMATELY 1,200 LINEAR FEET OF NEW SEWER MAIN ALONG THE SOUTH SIDE OF RUNNYMEDE ROAD. THIS WILL ELIMINATE THE NEED FOR THE NINE (9) EXISTING AERIAL SEWER SERVICE LATERALS, ONE (1) EXISTING AERIAL SEWER MAIN, AND ONE (1) AERIAL WATER MAIN. THE EXISTING AERIAL LINES SPANNING ACROSS RUNNYMEDE BRANCH WILL BE REPLACED WITH UNDERGROUND PIPING OR BE REMOVED COMPLETELY. THE STORMWATER COMPONENT OF THIS PROJECT INCLUDES INFRASTRUCTURE IMPROVEMENTS OF THE PIPE SYSTEM, SPANNING FROM RUNNYMEDE ROAD THROUGH THE OUTFALL LOCATED SOUTH OF NORTHWEST BOULEVARD. THE PIPE SYSTEM IS DETERIORATING AND POSSIBLY OVER CAPACITY, REQUIRING THE SYSTEM TO BE REPLACED. UPON COMPLETION OF THE INFRASTRUCTURE UPGRADE, THE STREAM RESTORATION AND STABILIZATION OF RUNNYMEDE BRANCH WILL COMMENCE. APPROXIMATELY 1,300 LINEAR FEET OF STREAM BANK IS UNSTABLE AND SEVERELY ERODED. STREAM BANK STABILIZATION AND STREAM RESTORATION WORK WILL BE COMPLETED USING NATURAL CHANNEL DESIGN METHODOLOGY.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACING SEVERAL UTILITY AERIAL STREAM CROSSINGS, REPAIRING AND STABILIZING EXISTING STREAMBANKS IN RUNNYMEDE BRANCH, REPLACING AND REHABILITATING STORM DRAINAGE INFRASTRUCTURE WHILE RESTORING THE PARK AND HISTORICAL FEATURES AND CHARACTERISTICS. THE EXPECTED OUTCOMES INCLUDE PROVIDING RESIDENCES WITH RELIABLE ACCESS TO POTABLE WATER AND ALLOWING PROPER DISPOSAL OF WASTEWATER, REDUCING THE CHANCES OF CONTAMINATION OF THE STREAM AND SURROUNDING ENVIRONMENTS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF CITY OF WINSTON-SALEM, NORTH CAROLINA.

Cooperative Agreement (B) · Environmental Protection Agency · to City of Winston-Salem (UEI E8LMSJ41W817) · data as of 2026-11-14

Obligated to date$2.80M1 action
Period2026-05-28 → 2026-05-28first to last action

What it is

Program
Congressionally Mandated Projects (Assistance Listing 66.202)
Where the work is
Forsyth, NC · district NC-10

Obligations by fiscal year

FY2026$2.80M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-05-28. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-05-280New award$2.80MDESCRIPTION:THIS AGREEMENT PROVIDES FUNDING IN THE AMOUNT OF $2,800,000 TO THE CITY OF WINSTON-SALEM, NORTH CAROLINA TO SUPPORT THE IMPLEMENTATION OF ITS RUNNYMEDE WATER INFRASTRUCTURE IMPROVEMENTS PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗