2537645↗

Volta Energy Inc received this grant or assistance award from National Science Foundation: $312.5K obligated so far for technology, innovation, and partnerships. Its latest action was on 2026-08-24.

Key facts · data as of Nov 14, 2026

Recipient
Volta Energy Inc
Awarding agency
National Science Foundation
Obligated to date
$312.5K

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 2537645, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_2537645_049

SBIR PHASE II: A NOVEL HIGH VOLTAGE ALL-IRON FLOW BATTERY FOR LONG-DURATION ENERGY STORAGE -THE BROADER/COMMERCIAL IMPACT OF THIS SBIR PHASE II PROJECT IS THE PROTOTYPE DEVELOPMENT OF A COST-EFFECTIVE, DURABLE, AND EFFICIENT ALL-IRON FLOW BATTERY SUITABLE FOR LONG-DURATION ENERGY STORAGE. COST-EFFECTIVE STORAGE IS A KEY ENABLER FOR POWER GENERATION FROM INTERMITTENT AND WEATHER-DEPENDENT SOURCES. FOR SHORT-DURATION ENERGY STORAGE, THE RAPIDLY IMPROVING LITHIUM-ION BATTERIES ARE ALREADY PRACTICAL, BUT FLOW BATTERIES ARE NEEDED FOR LONG-DURATION ENERGY STORAGE. THE STATE-OF-THE-ART FLOW BATTERY TECHNOLOGY IS THE VANADIUM REDOX-FLOW BATTERY, BUT THE HIGH COSTS AND LIMITED SUPPLY OF VANADIUM RESTRICT ITS APPLICATION ALSO TO SHORT-DURATION ENERGY STORAGE, WHERE LITHIUM-ION BATTERIES ARE DOMINANT. THE ALL-IRON FLOW BATTERY IS BASED INSTEAD ON IRON AS THE ACTIVE MATERIAL, OFFERING A POTENTIAL PATHWAY MEETING THE COST TARGETS FOR GRID ENERGY TRANSITION. THIS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE II PROJECT AIMS TO SCALE UP THE ALL-IRON FLOW BATTERY FROM THE LABORATORY-SCALE SINGLE CELL UNIT TO A MODULAR PROTOTYPE WITH A MULTI-CELL STACK THE SIZE OF A SMALL RESIDENTIAL ENERGY STORAGE UNIT. UNLIKE OTHER ALL-IRON BATTERIES THAT INVOLVE SOLID METAL AT THE NEGATIVE ELECTRODE AND ARE HYBRID BATTERIES, THIS TECHNOLOGY USES ALL-SOLUTION IRON COMPLEXES FOR BOTH THE POSOLYTE AND THE NEGOLYTE, OFFERING A TRUE FLOW BATTERY TECHNOLOGY BASED ON IRON. THE PHASE II PROJECT TARGETS A CELL VOLTAGE EXCEEDING 1.5 V, OVERCOMING THE LOWER VOLTAGES TYPICAL OF TRADITIONAL IRON-BASED SYSTEMS, BOOSTING CAPACITY AND ROUND-TRIP EFFICIENCY. BY UTILIZING SPECIALIZED LIGANDS AND TAILORING ELECTROLYTE PH AND COMPOSITION, THE DESIGN REDUCES GAS EVOLUTION AND CROSS-CONTAMINATION, ESSENTIAL FOR STABLE LONG-TERM CYCLING. THE PLANNED WORK INCLUDES OPTIMIZATION OF ELECTROLYTE COMPOSITION, CELL ARCHITECTURE, AND OPERATING CONDITIONS IN A SMALLER STACK TO VALIDATE PERFORMANCE DEMONSTRATING A LOW AREA-SPECIFIC RESISTANCE AND DURABILITY, BEFORE BUILDING A LARGER MULTI-CELL STACK AND BALANCE-OF-PLANT FOR A COMPLETE BIDIRECTIONAL GRID-CONNECTED PROTOTYPE TO ESTABLISH THE EFFICACY OF THE TECHNOLOGY IN OFFERING A LOWER COST ALTERNATIVE WITH SECURE SUPPLY-CHAIN, ENHANCED EFFICIENCY AND MODULAR SCALABILITY. THIS AWARD REFLECTS NSF'S STATUTORY MISSION AND HAS BEEN DEEMED WORTHY OF SUPPORT THROUGH EVALUATION USING THE FOUNDATION'S INTELLECTUAL MERIT AND BROADER IMPACTS REVIEW CRITERIA.- SUBAWARDS ARE NOT PLANNED FOR THIS AWARD.

Cooperative Agreement (B) · National Science Foundation · to Volta Energy Inc (UEI EEUMAESHYBD5) · data as of 2026-11-14

Obligated to date$312.5K1 action
Period2026-08-24 → 2026-08-24first to last action

What it is

Program
Technology, Innovation, and Partnerships (Assistance Listing 47.084)
Where the work is
Worcester, MA · district MA-02

The research project

SBIR Phase II: A Novel High Voltage All-Iron Flow Battery for Long-Duration Energy Storage · led by Ravindra Datta, VOLTA ENERGY INC

“The broader/commercial impact of this SBIR Phase II project is the prototype development of a cost-effective, durable, and efficient all-iron flow battery suitable for long-duration energy storage. Cost-effective storage is a key enabler for power generation from intermittent and weather-dependent sources.” Full award on nsf.gov ↗

Technology, Innovation and Partnerships · Sbir Phase Ii · 2026-09-01 to 2028-08-31 · $1.25M expected in all

Source: NSF Award Search, award 2537645.

Obligations by fiscal year

FY2026$312.5K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-08-24. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-08-24000New award$312.5KSBIR PHASE II: A NOVEL HIGH VOLTAGE ALL-IRON FLOW BATTERY FOR LONG-DURATION ENERGY STORAGE -THE BROADER/COMMERCIAL IMPACT OF THIS SBIR PHASE II PROJECT IS THE PROTOTYPE DEVELOPMENT OF A COST-EFFECTIVE, DURABLE, AND EFFICIENT ALL-IRON FLOW BATTERY SUITABLE…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗