Port of Grays Harbor received this grant or assistance award from Maritime Administration: $16.00M obligated so far for national infrastructure investments. Its latest action was on 2026-02-20.

Key facts · data as of Nov 14, 2026

Recipient
Port of Grays Harbor
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$16.00M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72340017, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72340017_069

AWARD PURPOSE THE PROJECT CONSISTS OF TWO ELEMENTS 1 EXPANDED INTERMODAL RAIL CAPACITY AND 2 CARGO GATE OPTIMIZATION. THE RAIL CAPACITY COMPONENT WILL CONSTRUCT TWO NEW RAIL TRACKS APPROXIMATELY 3200 FEET LONG WITH ACCESS RAIL ACQUIRE THREE NEW ELECTRIC RUBBER TIRED GANTRY CRANES RECONSTRUCTS APRON AREAS ON ALL SIDES OF THE TRACK INSTALLS LED LIGHTS AND RECONSTRUCTS THE STORMWATER DRAINAGE SYSTEM TO ADDRESS SEA LEVEL RISE. THE CARGO GATE OPTIMIZATION PROJECT WILL INCLUDE ROADWAY REALIGNMENTS TO AND FROM CARGO GATES REHABILITATION OF THE STORMWATER MANAGEMENT SYSTEM TO ADDRESS SEA LEVEL RISE CARGO GATE CANOPIES STAGING AREAS FOR TRUCKS DIRECT ACCESS TO RAIL YARD GATES RELOCATION OF CARGO GATE SUPPORT AND TERMINAL OFFICES AND TECHNOLOGY INCLUDING RFID READERS OCR OPTICAL CHARACTER RECOGNITION WIM SCALES REMOTE INSPECTION EQUIPMENT GATE MANAGEMENT SYSTEM. ACTIVITIES TO BE PERFORMED THIS PROJECT WILL FUND THREE COMPONENTS AT PORTMIAMI DESIGN CRITERIA PACKAGE EXPANDED INTERMODAL RAIL CAPACITY AND CARGO GATE OPTIMIZATION. COMPONENT 1 INITIAL DESIGN CRITERIA PACKAGE THE DESIGN CRITERIA DOCUMENTS FOR THE EXPANDED INTERMODAL RAIL CAPACITY PROJECT CONSISTS OF THE FOLLOWING SUBMITTALS PRELIMINARY PROGRAM AND REFINED CONCEPTUAL DESIGN AND ROUGH ORDER OF MAGNITUDE CONSTRUCTION COST ESTIMATES. DESIGN CRITERIA PACKAGE WITH DETAILED PARAMETERS AND NARRATIVES INCLUDING TRACK CONCEPTUAL LAYOUT AND FOOTPRINT SUSTAINABLE DESIGN REQUIREMENTS UTILITIES GANTRY CRANE HURRICANE TIE DOWNS TRUCK TURNING ANALYSIS ETC FOR A DESIGN BUILD CONTRACTOR TO SUCCESSFULLY BUILD THE PROJECT. TECHNICAL SPECIFICATIONS FOR THE ELECTRIC RAIL GANTRY CRANES TO ALIGN WITH THE EXPANDED INTERMODAL RAIL DESIGN. COMPONENT 2 DESIGN BUILD EXPANDED INTERMODAL RAIL CAPACITY. CONSTRUCTION OF THE ACCESS RAIL TRACK TWO NEW TRACKS APPROXIMATELY 3200 FEET LONG EACH AND INSTALLATION OF A RAILROAD SWITCH TO THE TRACKS WITHIN THE INTERMODAL RAIL YARD. REMOVAL AND REPLACEMENT OF EXISTING PAVEMENT. RECONSTRUCTION OF APRON AREA INCLUDING FILLING AND GRADING TO CREATE A STABLE BASE FOR THE TRAIN TRACKS AND APRON. RECONSTRUCTION OF STORMWATER DRAINAGE STRUCTURES AND PLACEMENT OF ASPHALT PAVING IN THE APRON AREA. INSTALLATION OF ADDITIONAL LED LIGHTS AS REQUIRED FOR SECURITY PURPOSES. ADDITIONAL CARGO HANDLING EQUIPMENT INCLUDING THREE 3 BUY AMERICA COMPLIANT NEW ELECTRIC RUBBER TIRED GANTRY CRANES E RTG TO BE ACQUIRED BY PORTMIAMI TO LOAD AND UNLOAD THE CONTAINERS FROM THE TRAINS. COMPONENT 3 DESIGN BUILD CARGO GATE OPTIMIZATION THE OPTIMIZATION OF THE CARGO GATES WILL RELOCATE AND MODERNIZE THE CARGO GATE SYSTEM FOR ONE OF PORTMIAMIS PRIMARY CONTAINER TERMINALS AND INCLUDES THE FOLLOWING ELEMENTS ROADWAY REALIGNMENTS TO AND FROM CARGO GATES. THIS INCLUDES THE IMPROVEMENTS SUCH AS PAVING FENCING AND STRIPING ON THE ROAD LEADING TO AND FROM THE RELOCATED GATES. REHABILITATION OF THE STORMWATER MANAGEMENT SYSTEM TO ADDRESS SEA LEVEL RISE HIGH TIDES STORM EVENTS AND TO MINIMIZE FLOODING. NEW CARGO GATE CANOPIES AS REQUIRED ALONG BOTH THE INBOUND AND OUTBOUND SECURITY GATES. NEW STAGING AREAS FOR TRUCKS IN THE PROBLEM RESOLUTION AREA. DIRECT ACCESS TO INTERMODAL RAIL YARD SECURITY GATES. RELOCATION OF CARGO GATE SUPPORT AND TERMINAL OFFICES TO ACCOMMODATE THE NEW CARGO GATE SYSTEM. GATE MODERNIZATION TO INCLUDE RFID READERS OCR WIM SCALES REMOTE INSPECTION EQUIPMENT AND INNOVATIVE TECHNOLOGY FOR THE GATE MANAGEMENT SYSTEM. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 10 OF THE GRANT AGREEMENT GROSS TONS OR TEUS ECONOMIC COMPETITIVENESS THE MOVEMENT OF GROSS TONNAGE OR TWENTY FOOT EQUIVALENT UNIT TEU OF FREIGHT IN THE AREA DEFINED BY THE PROJECT STUDY AREA SECONDARY VARIABLE TYPE OF INTERMODAL TRANSPORT RAIL OR TRUCK QUARTERLY. AVERAGE DAILY TRUCK TRAFFIC ADTT ECONOMIC COMPETITIVENESSADTT MEASURES THE TOTAL VOLUME OF CARGO AT THE PORT FOR THE INTERMODAL RAIL YARD AND THE CARGO YARD AND DIVIDES BY THE NUMBER OF DAYS PER QUARTER. QUARTERLY. INTENDED BENEFICIARY MIAMI DADE COUNTY. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Port of Grays Harbor (UEI KC4CLTVG4HR8) · data as of 2026-11-14

Obligated to date$16.00M2 actions
Period2025-01-06 → 2026-02-20first to last action

What it is

Program
National Infrastructure Investments (Assistance Listing 20.933)
Where the work is
Miami-Dade, FL · district FL-27
Funding law
Infrastructure law (IIJA)
Topics
hurricane

Obligations by fiscal year

FY2025$16.00M
FY2026$0

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

2 actions since 2025-01-06. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-02-201Continuation$0AWARD PURPOSE THE PROJECT CONSISTS OF TWO ELEMENTS 1 EXPANDED INTERMODAL RAIL CAPACITY AND 2 CARGO GATE OPTIMIZATION. THE RAIL CAPACITY COMPONENT WILL CONSTRUCT TWO NEW RAIL TRACKS APPROXIMATELY 3200 FEET LONG WITH ACCESS RAIL ACQUIRE THREE NEW ELECTRIC…
2025-01-06New award$16.00MAWARD PURPOSE THE PROJECT CONSISTS OF TWO ELEMENTS 1 EXPANDED INTERMODAL RAIL CAPACITY AND 2 CARGO GATE OPTIMIZATION. THE RAIL CAPACITY COMPONENT WILL CONSTRUCT TWO NEW RAIL TRACKS APPROXIMATELY 3200 FEET LONG WITH ACCESS RAIL ACQUIRE THREE NEW ELECTRIC…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗