Putting the award page together from the records…
Putting the award page together from the records…
Whatcom County received this grant or assistance award from Maritime Administration: $25.00M obligated so far for national infrastructure investments. Its latest action was on 2026-09-15.
Key facts · data as of Oct 23, 2026
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.
Cite this page: SpendQuery, Award 693JF72340024, data as of Oct 23, 2026, https://spendquery.com/award?id=ASST_NON_693JF72340024_069
Whatcom County: all federal awards · Department of Transportation: spending
AWARD PURPOSE THIS PROJECT WILL REPLACE THE 60 YEAR OLD FERRY WITH A DIESEL ELECTRIC BATTERY HYBRID FERRY THAT PROVIDES SERVICE TO AND FROM THE RURAL COMMUNITY OF LUMMI ISLAND. THE PROJECT ALSO INCLUDES ADJUSTING THE TERMINAL STRUCTURES TO ACCOMMODATE THE NEW FERRY AND MAKING OPERATIONAL AND UPLAND MODIFICATIONS TO PRESERVE AND ENHANCE THE FUNCTIONALITY OF THE FERRY SYSTEM. ACTIVITIES TO BE PERFORMED THIS PROJECT WILL REPLACE THE 60 YEAR OLD FERRY WITH CAPACITY FOR 16 VEHICLES AND 100 PASSENGERS WITH A DIESEL ELECTRIC BATTERY HYBRID FERRY WHICH WILL HAVE CAPACITY FOR 20 VEHICLES AND 150 PASSENGERS. THE PROJECT ALSO INCLUDES STRUCTURAL IMPROVEMENTS AND MINOR UPGRADES TO UPLANDS AT LUMMI ISLAND TERMINAL AND GOOSEBERRY POINT TERMINAL. THE PROJECT INCLUDES THE FOLLOWING THREE COMPONENTS COMPONENT 1 DESIGN TECHNICAL AND MANAGEMENT SUPPORT THE ACTIVITIES FOR COMPONENT 1 ARE ASSOCIATED WITH ALL CONSTRUCTION ELEMENTS OF THE PROJECT FERRY REPLACEMENT TERMINAL MODIFICATION AND RESTORATION PASSENGER ONLY FERRY FLOAT PROCUREMENT LUMMI ISLAND TERMINAL UPLANDS IMPROVEMENTS AND MITIGATION GOOSEBERRY POINT TERMINAL BRACING FOR WINGWALLS. DESIGN ENVIRONMENTAL AND PERMITTING ACTIVITIES. BID AND PROCUREMENT ACTIVITIES. CONSTRUCTION MANAGEMENT ACTIVITIES. WHATCOM COUNTY PUBLIC WORKS MANAGEMENT SUPPORT. COMPONENT 2 FERRY REPLACEMENT CONSTRUCTION OF A NEW 20 CAR VESSEL CAPABLE OF OPERATING WITHIN THE EXISTING MAINLAND TERMINAL AT GOOSEBERRY POINT. THIS NEW VESSEL ENHANCES THE CAPACITY OF THE EXISTING FERRY BY 25 PERCENT FROM 16 CARS TO 20 CARS AND WILL UTILIZE TIER 3 DIESEL ELECTRIC GENERATORS AND MARINE BATTERIES. COMPONENT 3 TERMINAL MODIFICATION AND RESTORATION AT LUMMI ISLAND AND GOOSEBERRY POINT TERMINALS THE FOLLOWING WORK INVOLVES STRUCTURAL REPLACEMENTS AND REPAIRS AT THE LUMMI ISLAND TERMINAL. DEMOLISH AND REPLACE THE EXISTING WINGWALLS THAT ARE AT THE END OF THEIR DESIGN LIFE. REPLACE THREE EXISTING TIMBER DOLPHINS THAT HAVE DETERIORATED AND ARE FAILING. DEMOLISH THE TWO EXISTING TIMBER BREAKWATERS ON THE WEST SIDE OF THE TERMINAL. DEMOLISH AND REPLACE THE TIMBER BREAKWATER ON THE EAST SIDE OF THE TERMINAL. INSTALL A PASSENGER ONLY FLOAT ALONGSIDE THE EXISTING FERRY SLIP. UPLANDS IMPROVEMENTS INCLUDING EMERGENCY GENERATOR REPLACEMENT INSTALLATION OF LIGHTING ELECTRICAL CONDUIT WORK TO SUPPORT FUTURE SECURITY CAMERA INSTALLATION STORMWATER IMPROVEMENTS AND PAVEMENT RESTRIPING AND MITIGATION WORK INCLUDING REMOVAL OF APPROXIMATELY 167 CREOSOTE TREATED TIMBER PILES IN LUMMI BAY. AT THE GOOSEBERRY POINT TERMINAL BRACING WILL BE ADDED TO THE EXISTING WINGWALL STRUCTURES. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 14 OF THE GRANT AGREEMENT MEASURE VESSEL TURN TIME. CATEGORY AND DESCRIPTION AVERAGE VESSEL TURN TIME HOURS. THE TIME BETWEEN A VESSEL FIRST REPORTING AT THE PORT TO THE TIME IT DEPARTS INCLUDING BERTH WAITING TIME AND SERVICING TIME. MEASUREMENT FREQUENCY QUARTERLY. MEASURE REPORTABLE EVENTS. CATEGORY AND DESCRIPTION TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA TERMINAL BERTH ETC THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000 COLLISIONS INVOLVING VEHICLES OR VESSELS AN EVACUATION FOR LIFE SAFETY REASONS. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY WHATCOM COUNTY. SUBRECIPIENT ACTIVITIES NONE
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
1 action since 2026-09-15. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-15 | New award | $25.00M | AWARD PURPOSE THIS PROJECT WILL REPLACE THE 60 YEAR OLD FERRY WITH A DIESEL ELECTRIC BATTERY HYBRID FERRY THAT PROVIDES SERVICE TO AND FROM THE RURAL COMMUNITY OF LUMMI ISLAND. THE PROJECT ALSO INCLUDES ADJUSTING THE TERMINAL STRUCTURES TO ACCOMMODATE THE… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗