693JF72344001↗

Department of Port Administration received this grant or assistance award from Maritime Administration: $2.12M obligated so far for port infrastructure development program. Its latest action was on 2026-04-28.

Key facts · data as of Nov 14, 2026

Recipient
Department of Port Administration
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$2.12M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72344001, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72344001_069

AWARD PURPOSE THE PROJECT FUNDS RECONSTRUCTION OF THE AUNUU WHARF WHICH IS THE ONLY ACCESS POINT IN AND OUT OF AUNUU ISLAND IN AMERICAN SAMOA. THE PROJECT WILL RECONSTRUCT THE EXISTING WHARF PERFORM STRUCTURAL REPAIRS TO THE EXISTING PILINGS CONSTRUCT A NEW APPROXIMATELY 80 FOOT LONG EXTENSION TO THE WHARF REPAIR AND UPGRADE THE EXISTING RAMP STRUCTURE DREDGE ANY EXCESS MATERIAL SURROUNDING THE WHARF AND INSTALL A NEW FENDERING SYSTEM BOLLARDS AND CLEATS. ACTIVITIES TO BE PERFORMED PHASE I ACTIVITIES WILL OCCUR USING THE FIRST PHASE OF OBLIGATED FUNDS 557000. THESE ACTIVITIES WILL NOT INVOLVE ANY GROUND DISTURBANCE AND DESIGN LEVEL ACTIVITIES FOR THE RESPECTIVE PHASE I COMPONENTS WILL NOT EXCEED 90 PERCENT DESIGN COMPLETION. PHASE I INCLUDES THE FOLLOWING COMPONENTS COMPONENT 1 PHASE I NEPA PERMITTING ENGINEERING AND DESIGN ACTIVITIES THE RECIPIENT WILL CONTRACT WITH US ARMY CORPS OF ENGINEERS USACE UNDER AN EXISTING AGREEMENT FOR NEPA SERVICES TO COMPLETE THE NEPA REVIEW FOR THE PHASE II GRANT FUNDED ACTIVITIES. AS PER AN EXISTING AGREEMENT USACE WILL REQUIRE ADVANCE PAYMENT FOR THIS WORK. USACE WILL COMPLETE INTERMEDIATE ENGINEERING AND DESIGN ACTIVITIES FOR THE PROJECT PRELIMINARY DESIGN AND ENGINEERING CONDUCTED BY USACE IS NOT PART OF THE SCOPE OF THIS GRANT. THE FOLLOWING SCOPE OF WORK IS ANTICIPATED TO BE INCLUDED FOR INTERMEDIATE DESIGN AND ENGINEERING SERVICES DESIGN ENGINEERING COORDINATION WITH RECIPIENT PROJECT DELIVERY TEAM PDT MEETING 65 PERCENT PLANS AND SPECS DEVELOPMENT AND REVIEW. 90 PERCENT PLANS AND SPECS DEVELOPMENT AND REVIEW. COST ESTIMATING 65 PERCENT 90 PERCENT 100 PERCENT. GEOTECHNICAL ENGINEERING ARCHITECTURAL ENGINEERING A E SERVICES CONTRACTING TO EXECUTE GEOTECH TASK ORDER. OVERSEE A E TASK ORDER FOR TWO GEOTECH BORINGS AND GEOPHYSICAL DATA GEOTECH BORINGS AND GEOPHYSICAL DATA COLLECTED BY A E REVIEW INTERPRET GEOTECH BORINGS/GEOPHYSICAL DATA. ENVIRONMENTAL ASSISTANCE WITH REMAINING ENVIRONMENTAL COMPLIANCE AND PERMITTING. PROJECT MANAGEMENT. PROJECT MANAGEMENT FINANCE SUPPORT CONTINGENCY. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 14 SCHEDULE G OF THE GRANT AGREEMENT MEASURE TOTAL VESSEL CALLS PER YEAR. CATEGORY AND DESCRIPTION MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE VESSEL TYPE EG CONTAINER BULK RO RO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASUREMENT FREQUENCY QUARTERLY. MEASURE TOTAL TONS OF CARGO MOVED PER YEAR TEUS. CATEGORY AND DESCRIPTION CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL. MEASUREMENT FREQUENCY QUARTERLY. MEASURE CLOSURE FROM NATURAL HAZARDS TOTAL HOURS OF FACILITY CLOSURE PER YEAR. CATEGORY AND DESCRIPTION A CLOSURE IS DEFINED AS WHEN A NATURAL HAZARD PREVENTS A FACILITY FROM CONTINUING DAILY OPERATIONS OR SERVICE. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY AMERICAN SAMOA GOVERNMENT DEPARTMENT OF PORT ADMINISTRATION. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Department of Port Administration (UEI QB5NBMAHTKT7) · data as of 2026-11-14

Obligated to date$2.12M1 action
Period2026-04-28 → 2026-04-28first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Western, AS · district AS-98
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2026$2.12M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-04-28. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-04-28New award$2.12MAWARD PURPOSE THE PROJECT FUNDS RECONSTRUCTION OF THE AUNUU WHARF WHICH IS THE ONLY ACCESS POINT IN AND OUT OF AUNUU ISLAND IN AMERICAN SAMOA. THE PROJECT WILL RECONSTRUCT THE EXISTING WHARF PERFORM STRUCTURAL REPAIRS TO THE EXISTING PILINGS CONSTRUCT A NEW…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗