693JF72344007↗

The Aleut Corporation received this grant or assistance award from Maritime Administration: $10.16M obligated so far for port infrastructure development program. Its latest action was on 2026-05-19.

Key facts · data as of Nov 13, 2026

Recipient
The Aleut Corporation
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$10.16M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 13, 2026.

Cite this page: SpendQuery, Award 693JF72344007, data as of Nov 13, 2026, https://spendquery.com/award?id=ASST_NON_693JF72344007_069

AWARD PURPOSE THE PROJECT AT THE PORT OF ADAK IN THE ALEUTIAN ISLANDS OF ALASKA ENTAILS REPAIRS AND UPDATES TO PIER FIVE THE PRIMARY SUPPLY PIER FOR THIS REMOTE ALASKAN VILLAGE. THE GRANT WILL FUND PLANNING AND PERMITTING WORK REMOVAL OF THE DETERIORATED TIMBER PILE FENDER SYSTEM INSTALLATION OF A HIGH ENERGY ABSORBING FENDER SYSTEM AND INSTALLATION OF FIREFIGHTING WATER AND A GENERAL WATER SERVICE LINE. ACTIVITIES TO BE PERFORMED THE PROJECT INCLUDES THE FOLLOWING COMPONENTS COMPONENT 1 FINAL DESIGN AND ENGINEERING PLANNING FINAL DESIGN ENVIRONMENTAL REVIEW INSPECTION PERMITTING AND PROJECT BIDDING AND AWARD. DIVE INSPECTION OF PILING. COMPONENT 2 PIER FIVE IMPROVEMENTS REMOVAL OF THE EXISTING TIMBER PILE FENDER SYSTEM TIMBER WALE TOP RAIL STEEL EGRESS LADDERS AND UNDER DECK CATWALK SYSTEM. REPAIR REPLACEMENT OF DAMAGED PRESTRESSED CONCRETE PILES ON THE SOUTHWEST END OF PIER FIVE AND CONCRETE PILE CAPS. INSTALLATION OF A MODERN HIGH ENERGY ABSORBING FENDER SYSTEM WITH RUBBER CYLINDRICAL FENDERS DESIGNED AROUND THE MOORING REQUIREMENTS OF THE 58 FOOT COMMERCIAL FISHING VESSEL FLEET. INSET EGRESS LADDERS WILL BE INCORPORATED INTO THE FACE OF THE FENDER ASSEMBLIES. INSTALLATION OF ANODES ON SUPPORT PILES BELOW WATER. INSTALLATION OF UTILITIES FOR FIREWATER AND A GENERAL WATER SERVICE LINE ON PIER FIVE.DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 12 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME. CATEGORY AND DESCRIPTION CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL. MEASUREMENT FREQUENCY QUARTERLY. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION VESSEL CALLS. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY THE ALEUT CORPORATION. SUBRECIPIENT ACTIVITIES NONE

Project Grant (B) · Maritime Administration · to The Aleut Corporation (UEI M5H7HESFYJL5) · data as of 2026-11-13

Obligated to date$10.16M1 action
Period2026-05-19 → 2026-05-19first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Anchorage, AK · district AK-00
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2026$10.16M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-05-19. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-05-19New award$10.16MAWARD PURPOSE THE PROJECT AT THE PORT OF ADAK IN THE ALEUTIAN ISLANDS OF ALASKA ENTAILS REPAIRS AND UPDATES TO PIER FIVE THE PRIMARY SUPPLY PIER FOR THIS REMOTE ALASKAN VILLAGE. THE GRANT WILL FUND PLANNING AND PERMITTING WORK REMOVAL OF THE DETERIORATED…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-13). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗