Matagorda County Navigation District No. 1 received this grant or assistance award from Maritime Administration: $9.60M obligated so far for port infrastructure development program. Its latest action was on 2026-09-18.

Key facts · data as of Nov 14, 2026

Recipient
Matagorda County Navigation District No. 1
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$9.60M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72344016, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72344016_069

AWARD PURPOSE THE PROJECT CONSISTS OF THE REHABILITATION OF THE BULKHEAD AND VESSEL BERTHING AREAS IN TURNING BASINS 1 AND 2 INCLUDING THE REPAIR OR REPLACEMENT OF APPROXIMATELY 5600 FEET OF BULKHEAD AND INSTALLATION OF APPROXIMATELY 24 VESSEL TO SHORE POWER STATIONS WITH MULTIPLE OUTLETS TO SERVE SEVERAL VESSELS AT ONCE. THE REHABILITATION WILL MAKE THE FACILITIES MORE RESILIENT TO THE EFFECTS OF NATURAL DISASTERS AND SEA LEVEL RISE. ACTIVITIES TO BE PERFORMED THE PROJECT CONSISTS OF TWO COMPONENTS WITH THE FOLLOWING ELEMENTS COMPONENT 1 ENGINEERING AND DESIGN AND CONSTRUCTION ADMINISTRATION PRE CONSTRUCTION ENGINEERING AND DESIGN PRE CONSTRUCTION ENVIRONMENTAL REVIEWS AND DOCUMENTATION TO INCLUDE VARIOUS FIELD STUDIES AND SURVEYS SUCH AS GEOTECHNICAL INVESTIGATIONS AND INSPECTION. BID PACKAGE DEVELOPMENT FOR CONSTRUCTION CONTRACT PROCUREMENT BID ADVERTISING EVALUATIONS AND AWARD. CONSTRUCTION ADMINISTRATION PHASE SERVICES TO INCLUDE CONSTRUCTION PHASE ENGINEERING AND OVERSIGHT PUNCH LIST ITEM RESOLUTION AND PROJECT CLOSE OUT ACTIVITIES. COMPONENT 2 SHORE POWER CONSTRUCTION AND REHABILITATION OF TURNING BASINS 1 AND 2 INSTALLATION OF APPROXIMATELY 24 VESSEL TO SHORE VTS POWER STATIONS WITH MULTIPLE OUTLETS ON THE DOCKS INCLUDING TRENCHING LANDSIDE OF THE BULKHEADS FOR INSTALLATION OF ELECTRICAL LINES REHABILITATION OF TURNINGS BASIN 1 AND 2 TOTALING APPROXIMATELY 5600 FEET OF BULKHEAD APPROXIMATELY 4064 LINEAR FEET OF BULKHEAD WALL TO BE INSTALLED TO 6 FEET NORTH AMERICAN VERTICAL DATUM NAVD 88 APPROXIMATELY 939 LINEAR FEET OF BULKHEAD WALL TO BE INSTALLED TO 5 FEET NAVD 88 REMOVAL OF APPROXIMATELY 492 SQUARE FEET OF FINGER PIERS REMOVAL OF APPROXIMATELY 1595 SQUARE FEET OF TIMBER PIERS REMOVAL OF APPROXIMATELY 76 BOLLARDS REMOVAL OF APPROXIMATELY 481 SQUARE FEET OF AWNING REMOVAL OF APPROXIMATELY 65 LINEAR FEET OF CONCRETE BULKHEAD AT TURNING BASIN NO 1 REMOVAL OF APPROXIMATELY 512 LINEAR FEET OF TIMBER BULKHEAD REMOVAL AND REINSTALLATION OF UTILITIES UNDERGROUND INSTALLATION OF APPROXIMATELY 155 BOLLARDS INSTALLATION OF AN APPROXIMATELY 367 SQUARE FOOT CONCRETE SLAB IN TURNING BASIN 1 DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME TONS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY THE MOVEMENT OF GROSS TONNAGE OF CARGO MOVED BY VESSEL MOVED PER YEAR IN THE AREA DEFINED BY THE PROJECT STUDY AREA. MEASUREMENT FREQUENCY QUARTERLY. MEASURE COLD IRONING TIME. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TIME VESSELS ARE CONNECTED TO SHORE POWER HOURS INSTEAD OF IDLING. MEASUREMENT FREQUENCY QUARTERLY. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL VESSEL CALLS PER YEAR CALLING TO THE AREA DEFINED IN THE PROJECT STUDY AREA. REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE VESSEL TYPE EG CONTAINER BULK RO RO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY MATAGORDA COUNTY NAVIGATION DISTRICT NO 1 SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Matagorda County Navigation District No. 1 (UEI UAR9AUY8K5X1) · data as of 2026-11-14

Obligated to date$9.60M2 actions
Period2026-08-20 → 2026-09-18first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Matagorda, TX · district TX-22

Obligations by fiscal year

FY2026$9.60M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

2 actions since 2026-08-20. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-09-181Continuation$0AWARD PURPOSE THE PROJECT CONSIST OF THE REHABILITATION OF THE BULKHEAD AND VESSEL BERTHING AREAS IN TURNING BASINS 1 AND 2 INCLUDING THE REPAIR OR REPLACEMENT OF APPROXIMATELY 5600 FEET OF BULKHEAD AND INSTALLATION OF APPROXIMATELY 24 VESSEL TO SHORE POWER…
2026-08-20New award$9.60MAWARD PURPOSE THE PROJECT CONSISTS OF THE REHABILITATION OF THE BULKHEAD AND VESSEL BERTHING AREAS IN TURNING BASINS 1 AND 2 INCLUDING THE REPAIR OR REPLACEMENT OF APPROXIMATELY 5600 FEET OF BULKHEAD AND INSTALLATION OF APPROXIMATELY 24 VESSEL TO SHORE POWER…