693JF72440057↗

Port Townsend Port of received this grant or assistance award from Maritime Administration: $800.0K obligated so far for port infrastructure development program. Its latest action was on 2026-02-03.

Key facts · data as of Nov 14, 2026

Recipient
Port Townsend Port of
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$800.0K

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72440057, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72440057_069

AWARD PURPOSE THIS PROJECT WILL REPAIR APPROXIMATELY 590 FEET OF THE BOAT HAVEN MAIN BREAKWATER. THE REHABILITATION WILL BE DESIGNED TO TIE INTO THE ADJOINING U.S. ARMY CORPS OF ENGINEERS USACE AUTHORIZED STRUCTURE. ACTIVITIES TO BE PERFORMED THIS PROJECT WILL REHABILITATE APPROXIMATELY 590 FEET OF THE BOAT HAVEN MAIN BREAKWATER. THE PROJECT INCLUDES THE FOLLOWING COMPONENT COMPONENT 1 CONSTRUCTION AND CONSTRUCTION MANAGEMENT. REPAIR APPROXIMATELY 590 FEET OF THE BOAT HAVEN MAIN BREAKWATER. RE GRADE THE SAND CORE AND ADD ADDITIONAL ROCK PROTECTION TO THE DAMAGED AND ERODED AREA TO ACHIEVE THE MINIMUM DESIGN COVERAGE DEPTH. ALL NEW ROCK PLACEMENT AND EXCAVATION WORK IS ANTICIPATED TO OCCUR ABOVE THE 2 MEAN LOWER LOW WATER MLLW TIDE LINE AND WITHIN THE ORIGINAL BREAKWATER FOOTPRINT. SOME REPOSITIONING OF EXISTING RIPRAP MAY OCCUR BELOW THE 2 TIDELINE TO ENSURE A STABLE BASE FOR ADDING THE ADDITIONAL RIPRAP. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 10 OF THE GRANT AGREEMENT MEASURE VESSEL CALLS.CATEGORY AND DESCRIPTION MEASUREMENT TOTAL VESSEL CALLS PER YEAR MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. FREQUENCY QUARTERLY. MEASURE REPORTABLE EVENTS. CATEGORY AND DESCRIPTION TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA TERMINAL, BERTH, ETC THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON. PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000. COLLISIONS INVOLVING VEHICLES OR VESSELS. AN EVACUATION FOR LIFE SAFETY REASONS.MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY PORT OF PORT TOWNSEND. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Port Townsend Port of (UEI DW38JANABVN7) · data as of 2026-11-14

Obligated to date$800.0K1 action
Period2026-02-03 → 2026-02-03first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Jefferson, WA · district WA-06

Obligations by fiscal year

FY2026$800.0K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-02-03. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-02-03New award$800.0KAWARD PURPOSE THIS PROJECT WILL REPAIR APPROXIMATELY 590 FEET OF THE BOAT HAVEN MAIN BREAKWATER. THE REHABILITATION WILL BE DESIGNED TO TIE INTO THE ADJOINING U.S. ARMY CORPS OF ENGINEERS USACE AUTHORIZED STRUCTURE. ACTIVITIES TO BE PERFORMED THIS PROJECT…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗