693JF72444083↗
North Carolina State Port Authority received this grant or assistance award from Maritime Administration: $10.95M obligated so far for port infrastructure development program. Its latest action was on 2025-12-18.
Key facts · data as of Nov 14, 2026
- Recipient
- North Carolina State Port Authority
- Awarding agency
- Maritime Administration (Department of Transportation)
- Obligated to date
- $10.95M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.
Cite this page: SpendQuery, Award 693JF72444083, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72444083_069
North Carolina State Port Authority: all federal awards · Department of Transportation: spending
AWARD PURPOSE THE PROJECT WILL CONSTRUCT TWO GRAIN STORAGE SILOS MAKE ELECTRICAL SERVICE UPGRADES AND FUND PURCHASE OF ADDITIONAL GRAIN AND CARGO HANDLING EQUIPMENT TO EXPAND THE CAPACITY OF THE PORT TO HANDLE THE MOVEMENT OF GRAIN AND FEED COMMODITIES. ACTIVITIES TO BE PERFORMED THE RECIPIENT IN COORDINATION WITH ITS SUBRECIPIENT WILL CARRY OUT THE FOLLOWING ACTIVITIES ON THIS PROJECT COMPONENT 1 STORAGE SILOS. EXCAVATION OF FOUNDATIONS OF STORAGE SILOS. PILINGS AND SUBSURFACE FOUNDATION SUPPORTS. CONSTRUCTION OF TWO CONCRETE SILOS EACH WILL BE 70 FT IN DIAMETER AND 125 135 FT TALL HAVING A CAPACITY OF APPROXIMATELY 9000 METRIC TONS MT. PURCHASE AND INSTALLATION OF A BIN UNLOADING SYSTEM. PURCHASE AND INSTALLATION OF A BIN AERATION. ENGINEERING AND CONSTRUCTION MANAGEMENT. COMPONENT 2 GRAIN AND FEED HANDLING EQUIPMENT. PURCHASE AND INSTALLATION OF A BUCKET ELEVATOR AND CONVEYOR TO ADD SECOND RECEIVING LINE IN RECEIVING BUILDING AT AN ADDITIONAL 20000 BUSHELS PER HOUR CAPACITY. PURCHASE AND INSTALLATION OF A SECOND CONVEYOR ACROSS CARFERRY DRIVE AT 20000 BUSHELS PER HOUR. PURCHASE AND INSTALLATION OF TWO FILL CONVEYORS AND NEEDED SUPPORT STRUCTURES TO FILL NEW CONCRETE STORAGE STRUCTURES COMING FROM ORIGINAL ELEVATOR AT 30000 BUSHELS PER HOUR. PURCHASE AND INSTALLATION OF TWO UNLOAD CONVEYORS OF NEW STORAGE STRUCTURES THAT COME BACK TO ORIGINAL SHIP LOADING SYSTEM AT 40000 BUSHELS PER HOUR. PURCHASE AND INSTALLATION OF SPOUTING AND ACCESSORIES TO MATCH CORRECT CAPACITY. ENGINEERING AND CONSTRUCTION MANAGEMENT. COMPONENT 3 ELECTRICAL. TIE INTO EXISTING ELECTRICAL SERVICE. ADD NEW MOTOR CONTROL CENTER ROOM. WIRE ALL NEW MOTORS AT 480V 3 PHASE. WIRE IN ALL HAZARD MONITORING EQUIPMENT FOR NEW CONVEYANCE. TIE INTO EXISTING PROGRAMMABLE LOGIC CONTROLLER. CONSTRUCTION MANAGEMENT. COMPONENT 4 ROLLING EQUIPMENT. PURCHASE RAILCAR MOVER. PURCHASE WHEEL LOADER W BUCKET AND FORKS. PURCHASE EXCAVATOR WITH CORN BUCKET. DELIVERABLES EXPECTED OUTCOMES PERFORMANCE MEASURE TABLE FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT MEASURE CATEGORY AND DESCRIPTION MEASUREMENT FREQUENCY VESSEL CALLS. ECONOMIC COMPETITIVENESS AND OPPORTUNITY MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE VESSELS TYPE EG CONTAINER BULK RO RO LNG FRIEIGHT CAPACITY VESSEL LENGTH OR OTHER. QUARTERLY. CARGO VOLUME. COMPETITIVENESS AND OPPORTUNITY MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL. QUARTERLY. INTENDED BENEFICIARY CITY OF MILWAUKEE. SUBRECIPIENT ACTIVITIES NONE.
What it is
- Program
- Port Infrastructure Development Program (Assistance Listing 20.823)
- Where the work is
- New Hanover, NC · district NC-07
- Funding law
- Infrastructure law (IIJA)
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2025-12-18. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-12-18 | New award | $10.95M | AWARD PURPOSE THE PROJECT WILL CONSTRUCT TWO GRAIN STORAGE SILOS MAKE ELECTRICAL SERVICE UPGRADES AND FUND PURCHASE OF ADDITIONAL GRAIN AND CARGO HANDLING EQUIPMENT TO EXPAND THE CAPACITY OF THE PORT TO HANDLE THE MOVEMENT OF GRAIN AND FEED COMMODITIES.… |