693JF72540004↗

Miami-Dade County received this grant or assistance award from Maritime Administration: $25.66M obligated so far for nationally significant freight and highway projects. Its latest action was on 2026-03-12.

Key facts · data as of Nov 20, 2026

Recipient
Miami-Dade County
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$25.66M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 20, 2026.

Cite this page: SpendQuery, Award 693JF72540004, data as of Nov 20, 2026, https://spendquery.com/award?id=ASST_NON_693JF72540004_069

AWARD PURPOSE THE PROJECT WILL ACQUIRE ELECTRIC AND HYBRID CARGO HANDLING EQUIPMENT AT PORTMIAMI, INCLUDING A TOTAL OF APPROXIMATELY 47 TERMINAL TRACTORS THREE HYBRID RUBBER TIRED GANTRY CRANES RTGS 76 HYBRID TRUCKS 42 DUAL CHARGING STATIONS AND THE INFRASTRUCTURE TO CONNECT AND CHARGE THE EQUIPMENT FOR 2 CARGO TERMINALS. THE PROJECT WILL ALSO REPLACE APPROXIMATELY 432 EXISTING DIESEL-POWERED REEFER GENERATORS CREATING A NEW TOTAL OF APPROXIMATELY 820 ALL ELECTRIC REEFER OUTLETS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL BE COMPLETED IN THREE COMPONENTS WITH THE FOLLOWING ELEMENTS COMPONENT 1 ENGINEERING AND DESIGN PRELIMINARY THROUGH FINAL DESIGN FOR THE REEFER GENERATORS. COMPONENT 2 EQUIPMENT PURCHASE GROUP 1 SEABOARD. EQUIPMENT PURCHASE APPROXIMATELY 9 UTILITY TRACTOR RIGS UTRS. APPROXIMATELY THREE HYBRID RTGS APPROXIMATELY 2 DUAL CHARGING STATIONS. COMPONENT 3 EQUIPMENT PURCHASE GROUP 2 SOUTH FLORIDA CONTAINER TERMINAL SFCT. EQUIPMENT PURCHASE APPROXIMATELY 40 DUAL CHARGING STATIONS APPROXIMATELY 38 UTRS APPROXIMATELY 70 HYBRID PICKUP TRUCKS AND 6 HYBRID SPORT UTILITY VEHICLES SUVS. COMPONENT 4 SUPPORTING INFRASTRUCTURE DEMOLITION NEW ELEVATED CONCRETE PADS INSTALLATION OF INFRASTRUCTURE TO CONNECT AND CHARGE THE EQUIPMENT INCLUDING FEEDERS REPLACEMENT OF APPROXIMATELY 432 EXISTING DIESEL POWERED REEFER GENERATORS AND GEN SETS WITH ELECTRIC REEFER PLUGS AND EXPANSION OF THE NUMBER OF PLUGS BY APPROXIMATELY 388 CREATING A NEW TOTAL OF APPROXIMATELY 820 ALL ELECTRIC REEFER OUTLETS EXPANSION AND IMPROVEMENTS TO THE ELECTRICAL SYSTEM DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 10 OF THE GRANT AGREEMENT MEASURE CARGO VOLUME TEUS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR TEUS. THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU . MEASUREMENT FREQUENCY QUARTERLY. MEASURE OPERATING AND MAINTENANCE COSTS. CATEGORY AND DESCRIPTION STATE OF GOOD REPAIR TOTAL COSTS BY CATEGORY PER YEAR. REPORT OPERATING AND OR MAINTENANCE COSTS FOR ONLY THE PROJECT STUDY AREA. COSTS MUST BE DISAGGREGATED BY ANY OF THE FOLLOWING COSTS OF OPERATING SUCH AS FUEL AND OIL MAINTENANCE COSTS FOR SERVICES PARTS OR SUPPLIES. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY MIAMI DADE COUNTY. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to Miami-Dade County (UEI G4FMKKEM5CH5) · data as of 2026-11-20

Obligated to date$25.66M1 action
Period2026-03-12 → 2026-03-12first to last action

What it is

Program
Nationally Significant Freight and Highway Projects (Assistance Listing 20.934)
Where the work is
Miami-Dade, FL · district FL-27
Funding law
Infrastructure law (IIJA)
Topics
electric_vehicles

Obligations by fiscal year

FY2026$25.66M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-03-12. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-03-12New award$25.66MAWARD PURPOSE THE PROJECT WILL ACQUIRE ELECTRIC AND HYBRID CARGO HANDLING EQUIPMENT AT PORTMIAMI, INCLUDING A TOTAL OF APPROXIMATELY 47 TERMINAL TRACTORS THREE HYBRID RUBBER TIRED GANTRY CRANES RTGS 76 HYBRID TRUCKS 42 DUAL CHARGING STATIONS AND THE…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗