693JF72540023↗

City & Borough of Juneau received this grant or assistance award from Maritime Administration: $11.15M obligated so far for port infrastructure development program. Its latest action was on 2026-09-10.

Key facts · data as of Nov 5, 2026

Recipient
City & Borough of Juneau
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$11.15M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 5, 2026.

Cite this page: SpendQuery, Award 693JF72540023, data as of Nov 5, 2026, https://spendquery.com/award?id=ASST_NON_693JF72540023_069

AWARD PURPOSE THE PROJECT WILL BUILD A DRIVE DOWN FLOAT AND VEHICLE BRIDGE AS WELL AS PROCURE TWO NEW FLOAT MOUNTED ELECTRIC CRANES WITH MAXIMUM LIFT CAPACITY OF 3 TONS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL EXPAND AN EXISTING TIMBER DOCK BY ADDING A 60 BY 70 FOOT WIDENED SECTION ATTACHED TO THE PILE SUPPORTED APPROACH DOCK. THIS WIDENED SECTION WILL SERVE AS THE CONNECTION POINT FOR A NEW APPROXIMATELY 17 FOOT WIDE BY 140 FOOT LONG STEEL VEHICULAR TRANSFER BRIDGE LEADING FROM THE SHORE. AT THE TERMINATING END OF THE TRANSFER BRIDGE AN APPROXIMATELY 48 FOOT WIDE BY 120 FOOT LONG VEHICLE ACCESSIBLE DRIVE DOWN FLOAT WILL BE INSTALLED AND EQUIPPED WITH TWO FLOAT MOUNTED ELECTRIC CRANES WITH MAXIMUM LIFT CAPACITY OF 3 TONS. THE FLOAT WILL FEATURE A TIMBER DECK SUPPORTED BY STEEL FLOTATION PONTOONS ENABLING DIRECT FREIGHT TRANSFER BETWEEN MOORED VESSELS AND TRANSPORT VEHICLES. ADDITIONALLY ESSENTIAL UTILITIES INCLUDING POTABLE WATER FIRE SUPPRESSION POWER AND LIGHTING WILL BE EXTENDED DOWN THE BRIDGE TO SERVICE THE NEW FLOAT INFRASTRUCTURE. THE PROJECT WILL BE CARRIED OUT IN TWO SEPARATE COMPONENTS COMPONENT 1 PROJECT MANAGEMENT TO INCLUDE PROJECT PLANNING PROJECT PERMITTING INCLUDING COSTS TO COMPLETE NEPA ENGINEERING AND DESIGN CONSTRUCTION ADMINISTRATION AND INSPECTION COMPONENT 2 CONSTRUCTION TO INCLUDE MOBILIZATION AND DEMOBILIZATION DEMOLITION AND DISPOSAL CONSTRUCTION SURVEY DOMESTIC WATER SYSTEM FIRE SUPPRESSION SYSTEM WIDENED DOCK APPROXIMATELY 60 BY 70 TRANSFER BRIDGE APPROXIMATELY 17 BY 140 BRIDGE SUPPORT FLOAT BRIDGE ABUTMENT ASSEMBLY DRIVE DOWN FLOAT APPROXIMATELY 48 BY 120 FLOAT ANCHOR PILE, APPROXIMATELY 24 FLOAT MOORING PILE FRAMES DOCK SUPPORT VERTICAL PILES APPROXIMATELY 16 DOCK SUPPORT BATTER PILES APPROXIMATELY 16 BRIDGE ABUTMENT VERTICAL PILES APPROXIMATELY 16 BRIDGE ABUTMENT BATTER PILES APPROXIMATELY 16 FLOAT TRANSITION APRON PILE ANODES TWO ELECTRIC CRANES WITH MAXIMUM LIFT CAPACITY OF 3 TONS ELECTRICAL SYSTEM POWER AND LIGHTING DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 14 OF THE GRANT AGREEMENT MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION MEASUREMENT VESSEL TYPE AND OR FREIGHT CAPACITY OF THE VESSELS CALLING TO THE AREA DEFINED IN THE PROJECT STUDY AREA. FREQUENCY QUARTERLY. MEASURE TRAVEL TIME SAVINGS. CATEGORY AND DESCRIPTION TRAVEL TIME SAVINGS FOR TRAFFIC MEASURED OVER SPECIFIED DISTANCE AS DEFINED BY THE PROJECT STUDY AREA. VARIABLES INCLUDE QUEUING TIME OR CROSS MODAL TRANSPORT TIMES. MEASUREMENT FREQUENCY QUARTERLY. INTENDED BENEFICIARY JUNEAU CITY AND BOROUGH OF. SUBRECIPIENT ACTIVITIES NONE.

Project Grant (B) · Maritime Administration · to City & Borough of Juneau (UEI WEDBSKEPJJW5) · data as of 2026-11-05

Obligated to date$11.15M1 action
Period2026-09-10 → 2026-09-10first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
Juneau, AK · district AK-00

Obligations by fiscal year

FY2026$11.15M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-09-10. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-09-10New award$11.15MAWARD PURPOSE THE PROJECT WILL BUILD A DRIVE DOWN FLOAT AND VEHICLE BRIDGE AS WELL AS PROCURE TWO NEW FLOAT MOUNTED ELECTRIC CRANES WITH MAXIMUM LIFT CAPACITY OF 3 TONS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL EXPAND AN EXISTING TIMBER DOCK BY ADDING A…