693JF72540030↗

North Carolina State Port Authority received this grant or assistance award from Maritime Administration: $14.92M obligated so far for port infrastructure development program. Its latest action was on 2026-08-04.

Key facts · data as of Nov 14, 2026

Recipient
North Carolina State Port Authority
Awarding agency
Maritime Administration (Department of Transportation)
Obligated to date
$14.92M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award 693JF72540030, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_693JF72540030_069

AWARD PURPOSE THE PROJECT WILL CONSTRUCT NEW SHEET PILE BULKHEADS IN FRONT OF THE EXISTING BULKHEADS AT THE NORTH EAST AND SOUTH BARGE BERTHS IN THE PORT OF MOREHEAD CITY. WORK INCLUDES THE INSTALLATION OF A REDESIGNED CONCRETE CAP HIGH PERFORMANCE FENDERS AND UPGRADED MOORING HARDWARE. IT ALSO WILL REFURBISH EXISTING SUPPORT STRUCTURES SUCH AS TRESTLES FIXED CRANES AND HOISTS. ACTIVITIES TO BE PERFORMED THE PROJECT WILL BE COMPLETED IN ONE COMPONENT WITH THE FOLLOWING ELEMENTS BULKHEAD CONSTRUCTION ELEMENT 1 BULKHEAD AND STRUCTURAL WALL SHEET PILING: FURNISH AND INSTALL APPROXIMATELY 1350 LINEAR FEET LF OF STEEL SHEET PILE BULKHEADS OVER EXISTING ONES. KING PILES AND PANELS FURNISH AND INSTALL AN ADDITIONAL 150 LF OF 12 FOOT WIDE HP18 KING PILE BEAMS AND 120 PRE CAST CONCRETE PANELS FOR A COMBINED TOTAL OF APPROXIMATELY 1500 LF OF NEW BULKHEAD SHEET PILE AND KING PILE SYSTEMS. ANCHORAGE INSTALL A MODERN ANCHORAGE SYSTEM INCLUDING APPROXIMATELY 120 SOIL ANCHORS A CONCRETE DEADMAN TUNNEL CLOSURE AND APPROXIMATELY SIX TIE RODS AT THE SOUTHEAST CORNER. ELEMENT 2 CAPS RAILS AND EROSION CONTROL CONCRETE CAP INSTALL A REDESIGNED CONCRETE CAP APPROXIMATELY 1500 LF. BULL RAILS REMOVE AND REINSTALL APPROXIMATELY 1150 LF OF EXISTING BULL RAIL FURNISH AND INSTALL APPROXIMATELY 200 LF OF NEW BULL RAIL. RIPRAP REMOVE REINSTALL APPROXIMATELY 30 CUBIC YARDS CY AT THE NORTHEAST CORNER FURNISH AND INSTALL APPROXIMATELY 150 CY AT THE SOUTHEAST CORNER. ELEMENT 3 FENDERS AND MOORING HARDWARE FENDERS REMOVE APPROXIMATELY 1300 LF OF EXISTING UHMW PE FENDERS REPLACE THE NORTHEAST CORNER WHEEL FENDER ASSEMBLY, AND REINSTALL THE FENDERS UPON COMPLETION. BOLLARDS AND HARDWARE UPGRADE MOORING HARDWARE FOR BARGE STABILITY REFURBISH 22 EXISTING BOLLARDS REMOVE RUST SCALE AND OLD COATINGS. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 11 SCHEDULE G OF THE GRANT AGREEMENT INTENDED BENEFICIARY NORTH CAROLINA STATE PORT AUTHORITY. SUBRECIPIENT ACTIVITIES NONE. MEASURE CARGO VOLUME. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL TONS OF CARGO MOVED PER YEAR TEUS OR SHORT TONS. CARGO VOLUME MEASURES THE MOVEMENT OF FREIGHT THROUGH THE PROJECT STUDY AREA. WHEN APPLICABLE REPORT THE TOTAL CARGO VOLUME AND THE VOLUME DISAGGREGATED BY TYPE OF FREIGHT IE CONTAINERS IN TEU AND BULK IN TONS OR TYPE OF INTERMODAL TRANSPORT TRUCK OR RAIL. MEASUREMENT FREQUENCY QUARTERLY. MEASURE VESSEL CALLS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS AND OPPORTUNITY TOTAL VESSEL CALLS PER YEAR. MEASURES THE NUMBER OF VESSELS CALLING TO THE PROJECT STUDY AREA. MUST BE REPORTED IN TOTAL AND DISAGGREGATED BY ANY OF THE FOLLOWING WHERE APPLICABLE: VESSEL TYPE EG CONTAINER BULK RO RO LNG FREIGHT CAPACITY VESSEL LENGTH OR OTHER. MEASUREMENT FREQUENCY QUARTERLY.

Project Grant (B) · Maritime Administration · to North Carolina State Port Authority (UEI CWRFQH1KJCA9) · data as of 2026-11-14

Obligated to date$14.92M1 action
Period2026-08-04 → 2026-08-04first to last action

What it is

Program
Port Infrastructure Development Program (Assistance Listing 20.823)
Where the work is
New Hanover, NC · district NC-07

Obligations by fiscal year

FY2026$14.92M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-08-04. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-08-04New award$14.92MAWARD PURPOSE THE PROJECT WILL CONSTRUCT NEW SHEET PILE BULKHEADS IN FRONT OF THE EXISTING BULKHEADS AT THE NORTH EAST AND SOUTH BARGE BERTHS IN THE PORT OF MOREHEAD CITY. WORK INCLUDES THE INSTALLATION OF A REDESIGNED CONCRETE CAP HIGH PERFORMANCE FENDERS…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗