69A36526421050RCEIL↗

Northeast Illinois Railroad Co received this grant or assistance award from Federal Railroad Administration: $22.00M obligated so far for railroad crossing elimination. Its latest action was on 2026-04-01.

Key facts · data as of Nov 10, 2026

Recipient
Northeast Illinois Railroad Co
Awarding agency
Federal Railroad Administration (Department of Transportation)
Obligated to date
$22.00M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 10, 2026.

Cite this page: SpendQuery, Award 69A36526421050RCEIL, data as of Nov 10, 2026, https://spendquery.com/award?id=ASST_NON_69A36526421050RCEIL_069

THE PURPOSE OF THIS AWARD IS TO PROVIDE METRA FUNDS FOR CONSTRUCTION TO COMPLETE HIGHWAY-RAIL GRADE CROSSING IMPROVEMENTS AND SIGNAL SYSTEM MODERNIZATION AT 36 HIGHWAY-RAIL GRADE CROSSINGS AND ONE PEDESTRIAN-RAIL GRADE CROSSING ALONG THE METRA ELECTRIC DISTRICTS SOUTH CHICAGO BRANCH IN CHICAGO, ILLINOIS. THE PROJECT WILL UPGRADE THE ELECTRICAL CIRCUITRY CONNECTED TO THE SIGNAL SYSTEM, CONSTRUCT AND INSTALL NEW HOUSING TO STORE ELECTRICAL COMPONENTS, INSTALL SMART GATES TECHNOLOGY WITH REMOTE MONITORING CAPABILITIES, AND INTEGRATE WITH BACK-END SOFTWARE. ACTIVITIES TO BE PERFORMED: REPLACEMENT AND RENEWAL OF ALL SIGNAL SYSTEM ASSETS, CONTROL EQUIPMENT, AND 87 WARNING DEVICES (INCLUDING CANTILEVERS, GATE ASSEMBLIES, AND FLASHERS) AT 36 HIGHWAY-RAIL GRADE CROSSINGS AND ONE PEDESTRIAN-RAIL GRADE CROSSING BETWEEN 70TH STREET (MILEPOST (MP) 8.78 AT 41.767823, -87.592302) AND 92ND STREET (MP 13.08 AT 41.728282, -87.547837). REPLACEMENT OF CROSSING CIRCUITRY FROM MP 8.78 TO MP 13.08 ON THE ME LINE. REPLACEMENT OF RELAY UNITS AND ADDING A CROSSING RECORDER EQUIPPED WITH REMOTE MONITORING CAPABILITIES. INSTALLATION OF 22 NEW SIGNAL RELAY CASES AND 13 SIGNAL RELAY HOUSES AT 35 LOCATIONS TO HOUSE CROSSING CONTROL EQUIPMENT AND WARNING DEVICE CIRCUITRY. SOME REMOTE MONITORING UPGRADES WILL BE WIRED IN EXISTING HOUSING. DELIVERABLES EXPECTED OUTCOMES:TASK 1: PROJECT MANAGEMENT PLAN AND FINAL PERFORMANCE REPORT.TASK 2 CONSTRUCTION: REVISED USDOT CROSSING INVENTORY FORM AND FRA FINAL CROSSING INSPECTIONS. (SYSTEM TESTING OF ALL CROSSING SIGNALING EQUIPMENT WILL TAKE PLACE IN ACCORDANCE WITH 49 CFR PART 234. THE RECIPIENT WILL COORDINATE WITH FRAS OFFICE OF RAILROAD SAFETY HEADQUARTERS (RRS HQ) OFFICE TO SCHEDULE SUCH CUT-IN TESTS AND FINAL SIGNALING INSPECTIONS, ONCE CONSTRUCTION IS COMPLETED)INTENDED BENEFICIARY: AS THE SOLE OWNER AND RAIL OPERATOR OF THE SOUTH CHICAGO BRANCH, METRA AND ITS RIDERS ARE THE PRIMARY DIRECT USERS AND BENEFICIARIES.

Grant · Federal Railroad Administration · to Northeast Illinois Railroad Co (UEI QNMFBR7SVDB1) · data as of 2026-11-10

Obligated to date$22.00M1 action
Period2026-04-01 → 2026-04-01first to last action

What it is

Program
Railroad Crossing Elimination (Assistance Listing 20.327)
Where the work is
Cook, IL
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2026$22.00M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-04-01. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-04-0100New award$22.00MTHE PURPOSE OF THIS AWARD IS TO PROVIDE METRA FUNDS FOR CONSTRUCTION TO COMPLETE HIGHWAY-RAIL GRADE CROSSING IMPROVEMENTS AND SIGNAL SYSTEM MODERNIZATION AT 36 HIGHWAY-RAIL GRADE CROSSINGS AND ONE PEDESTRIAN-RAIL GRADE CROSSING ALONG THE METRA ELECTRIC…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-10). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗