98T66201↗
Mohave, County of received this grant or assistance award from Environmental Protection Agency: $1.00M obligated so far for congressionally mandated projects. Its latest action was on 2025-11-20.
Key facts · data as of Nov 21, 2026
- Recipient
- Mohave, County of
- Awarding agency
- Environmental Protection Agency
- Obligated to date
- $1.00M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 21, 2026.
Cite this page: SpendQuery, Award 98T66201, data as of Nov 21, 2026, https://spendquery.com/award?id=ASST_NON_98T66201_068
Mohave, County of: all federal awards · Environmental Protection Agency: spending
DESCRIPTION:THE RECIPIENT PLANS TO CONSTRUCT THE BANK STREET DRAINAGE PROJECT IN KINGMAN, ARIZONA WHICH WILL INCLUDE INSTALLATION OF A CATCH BASIN AT THE INTERSECTION OF GORDON AVENUE AND BANK STREET. THE PROJECT WILL CONSTRUCT APPROXIMATELY 5,800 FEET OF STORM DRAIN PIPING (36-INCH) TO CONVEY FLOWS TO AN ABOVEGROUND DITCH TO THE NORTH OF KINGMAN HIGH SCHOOL AND INTO THE MOHAVE WASH CHANNEL. THE CATCH BASIN WILL BE INSTALLED ACROSS GORDON DRIVE AT THE SOUTHERN END OF THE PROJECT AREA AND INLETS WILL BE ADDED ON EITHER SIDE OF BANK STREET UNDER THE EXISTING SIDEWALK. TRENCHING FOR THE CATCH BASIN WILL BE 50 FEET IN LENGTH, 5 FEET WIDE, AND 7-FEET DEEP. THE STORM DRAINPIPE WILL CONNECT THE INLETS TO THE MAIN LINE. TRENCHING FOR THE STORM DRAINPIPE WILL BE APPROXIMATELY 7 FEET WIDE BY 8 FEET DEEP. PROJECT STAGING WILL OCCUR IN THE KINGMAN HIGH SCHOOL PARKING LOT. THE PURPOSE OF THE PROJECT IS TO ALLEVIATE SURFACE WATER AND FLOODING ALONG BANK STREET NORTH OF GORDAN AVENUE, WHICH HAS LONG BEEN RECOGNIZED AS A SAFETY HAZARD. THE PROJECT WILL BE COMPLETED WITHIN AN EXISTING ROADWAY. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $1,000,000.00. PREAWARD COSTS APPROVED BACK TO AUGUST 1, 2023.ACTIVITIES:THE RECIPIENT PLANS TO CONSTRUCT THE BANK STREET DRAINAGE PROJECT IN KINGMAN, ARIZONA WHICH WILL INCLUDE INSTALLATION OF A CATCH BASIN AT THE INTERSECTION OF GORDON AVENUE AND BANK STREET. THE PROJECT WILL CONSTRUCT APPROXIMATELY 5,800 FEET OF STORM DRAIN PIPING (36-INCH) TO CONVEY FLOWS TO AN ABOVEGROUND DITCH TO THE NORTH OF KINGMAN HIGH SCHOOL AND INTO THE MOHAVE WASH CHANNEL. THE CATCH BASIN WILL BE INSTALLED ACROSS GORDON DRIVE AT THE SOUTHERN END OF THE PROJECT AREA AND INLETS WILL BE ADDED ON EITHER SIDE OF BANK STREET UNDER THE EXISTING SIDEWALK. TRENCHING FOR THE CATCH BASIN WILL BE 50 FEET IN LENGTH, 5 FEET WIDE, AND 7-FEET DEEP. THE STORM DRAINPIPE WILL CONNECT THE INLETS TO THE MAIN LINE. TRENCHING FOR THE STORM DRAINPIPE WILL BE APPROXIMATELY 7 FEET WIDE BY 8 FEET DEEP. PROJECT STAGING WILL OCCUR IN THE KINGMAN HIGH SCHOOL PARKING LOT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE DELIVERABLE IS AN IMPROVED STORM DRAINAGE SYSTEM. THE OUTCOME WILL PROVIDE RELIEF FROM FLOODING TO THE COMMUNITY MEMBERS IN KINGMAN, ARIZONA.
What it is
- Program
- Congressionally Mandated Projects (Assistance Listing 66.202)
- Where the work is
- Mohave, AZ · district AZ-09
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
2 actions since 2023-09-13. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-11-20 | 1 | Continuation | $0 | DESCRIPTION:THE RECIPIENT PLANS TO CONSTRUCT THE BANK STREET DRAINAGE PROJECT IN KINGMAN, ARIZONA WHICH WILL INCLUDE INSTALLATION OF A CATCH BASIN AT THE INTERSECTION OF GORDON AVENUE AND BANK STREET. THE PROJECT WILL CONSTRUCT APPROXIMATELY 5,800 FEET OF… |
| 2023-09-13 | 0 | New award | $1.00M | DESCRIPTION:THE RECIPIENT PLANS TO CONSTRUCT THE BANK STREET DRAINAGE PROJECT IN KINGMAN, ARIZONA WHICH WILL INCLUDE INSTALLATION OF A CATCH BASIN AT THE INTERSECTION OF GORDON AVENUE AND BANK STREET. THE PROJECT WILL CONSTRUCT APPROXIMATELY 5,800 FEET OF… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗