CA-2026-073↗
San Diego Association of Governments received this grant or assistance award from Federal Transit Administration: $3.50M obligated so far for federal transit formula grants. Its latest action was on 2026-06-29.
Key facts · data as of Nov 14, 2026
- Recipient
- San Diego Association of Governments
- Awarding agency
- Federal Transit Administration (Department of Transportation)
- Obligated to date
- $3.50M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.
Cite this page: SpendQuery, Award CA-2026-073, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_CA-2026-073_069
San Diego Association of Governments: all federal awards · Department of Transportation: spending
APPLICATION PURPOSE: THE PRIMARY PURPOSE OF THE PROJECT IS TO ELIMINATE THE EXISTING 1.6 MILE LONG SINGLE TRACK BOTTLENECK BETWEEN CP DON (MP 216.5) AND CP PULGAS (MP 218.1). CURRENTLY THIS SEGMENT OF SINGLE TRACK REQUIRES TRAINS TO LAYOVER DURING CERTAIN TIMES OF THE DAY TO ALLOW FOR OTHER TRAINS TO PASS. THIS REDUCES THE OVERALL CAPACITY OF THE SYSTEM RESULTING IN INCREASED TRAVEL TIME DELAYS TO OTHER TRAINS AND LIMITS THE NUMBER OF DAYTIME FREIGHT TRAINS THAT CAN BE MOVED THROUGH THE CORRIDOR.; ACTIVITIES PERFORMED: CONSTRUCT A NEW BRIDGE OVER LAS PULGAS ROAD ADD 1.3 MILES OF RAISED TRACK BED EMBANKMENT BURY OVERHEAD ELECTRIC LINES UNDER THE RAILROAD RIGHT-OF-WAY AND BUILD NEW DRAINAGE STRUCTURES.; EXPECTED OUTCOMES: ADDING A SECOND TRACK FROM CP DON SOUTH TO CP PULGAS WILL ALLOW FOR FREIGHT AND PASSENGER TRAINS TO MAKE PASSES WITHOUT STOPPING IN THE CURRENT SINGLE-TRACK BOTTLENECK.; INTENDED BENEFICIARIES: TRANSIT RIDERS ON METROLINK AND AMTRAK.METROLINKTHE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA) OPERATES METROLINK COMMUTER SERVICES BETWEEN OCEANSIDE AND LOS ANGELES AND BETWEEN OCEANSIDE AND RIVERSIDE PROVIDING 16 TRAINS PER DAY MONDAY THROUGH FRIDAY 10 TRAINS PER DAY ON SATURDAY AND 8 TRAINS PER DAY ON SUNDAY.AMTRAKAMTRAK OPERATES 26 PACIFIC SURFLINER TRAINS PER DAY.; SUBRECIPIENT ACTIVITIES: SANDAG DOES NOT INTEND TO ALLOCATE FUNDING TO SUBRECIPIENTS.
What it is
- Program
- Federal Transit Formula Grants (Assistance Listing 20.507)
- Where the work is
- CA
- Funding law
- Infrastructure law (IIJA)
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2026-06-29. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-29 | 0 | New award | $3.50M | APPLICATION PURPOSE: THE PRIMARY PURPOSE OF THE PROJECT IS TO ELIMINATE THE EXISTING 1.6 MILE LONG SINGLE TRACK BOTTLENECK BETWEEN CP DON (MP 216.5) AND CP PULGAS (MP 218.1). CURRENTLY THIS SEGMENT OF SINGLE TRACK REQUIRES TRAINS TO LAYOVER DURING CERTAIN… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗