CE260020↗
Denver Health and Hospital Authority received this grant or assistance award from Health Resources and Services Administration: $3.00M obligated so far for congressional directives. Its latest action was on 2026-09-09.
Key facts · data as of Nov 13, 2026
- Recipient
- Denver Health and Hospital Authority
- Awarding agency
- Health Resources and Services Administration (Department of Health and Human Services)
- Obligated to date
- $3.00M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 13, 2026.
Cite this page: SpendQuery, Award CE260020, data as of Nov 13, 2026, https://spendquery.com/award?id=ASST_NON_CE260020_075
Denver Health and Hospital Authority: all federal awards · Department of Health and Human Services: spending
DENVER HEALTH PAVILION A AIR HANDLING UNIT REPLACEMENT - LAUNDRY, STERILE PROCESSING, AND RADIOLOGY - THIS PROJECT REPLACES TWO AGING AIR HANDLING UNITS WITH A SINGLE NEW, HIGH-EFFICIENCY AIR HANDLING UNIT OF APPROXIMATELY 30,000 CFM CAPACITY, INSTALLED ON A NEW EXTERIOR PAD. THE NEW UNIT WILL PROVIDE CONDITIONED AIR TO THREE ESSENTIAL HOSPITAL FUNCTIONS: THE STERILE PROCESSING DEPARTMENT, LAUNDRY, AND RADIOLOGY, INCLUDING THE INTERVENTIONAL RADIOLOGY SUITE. THE EXISTING EQUIPMENT HAS REACHED THE END OF ITS RELIABLE SERVICE LIFE AND CAN NO LONGER CONSISTENTLY MAINTAIN THE TEMPERATURE, HUMIDITY, AND AIR-PRESSURE CONDITIONS THESE AREAS REQUIRE FOR SAFE OPERATION. THE IMPROVEMENTS DIRECTLY PROTECT PATIENT SAFETY AND CARE QUALITY. RADIOLOGY AND INTERVENTIONAL RADIOLOGY DEPEND ON STABLE ENVIRONMENTAL CONDITIONS TO SAFEGUARD SENSITIVE IMAGING EQUIPMENT AND MAINTAIN STERILE CONDITIONS DURING PROCEDURES. THE STERILE PROCESSING DEPARTMENT RELIES ON TIGHTLY CONTROLLED TEMPERATURE, HUMIDITY, AND DIRECTIONAL AIRFLOW TO PROPERLY DECONTAMINATE, STERILIZE, AND STORE THE SURGICAL INSTRUMENTS USED THROUGHOUT THE HOSPITAL - A CORE INFECTION-PREVENTION FUNCTION. LAUNDRY OPERATIONS REQUIRE RELIABLE CLIMATE CONTROL TO MANAGE SUBSTANTIAL HEAT AND HUMIDITY LOADS. BY DELIVERING INCREASED HEATING AND COOLING CAPACITY AND FAR TIGHTER HUMIDITY AND PRESSURE CONTROL, THE NEW SYSTEM REDUCES THE RISK OF EQUIPMENT FAILURE AND SERVICE DISRUPTION IN AREAS THAT SUPPORT THOUSANDS OF PROCEDURES EACH YEAR. THE PROJECT CONSISTS OF REMOVING THE EXISTING UNITS, CONSTRUCTING THE NEW EQUIPMENT PAD, INSTALLING THE NEW AIR HANDLING UNIT, AND COMPLETING THE ASSOCIATED DUCTWORK, ELECTRICAL, PLUMBING, AND BUILDING-AUTOMATION CONTROLS WORK NEEDED TO INTEGRATE IT INTO THE FACILITY. NO ADDITIONAL BUILDING SQUARE FOOTAGE IS CREATED; THE WORK MODERNIZES EXISTING INFRASTRUCTURE WITHIN THE EXISTING HOSPITAL. THE NEW UNIT WILL BE SELECTED FOR IMPROVED ENERGY EFFICIENCY RELATIVE TO THE EQUIPMENT IT REPLACES, CONSISTENT WITH APPLICABLE EFFICIENCY STANDARDS, REDUCING ENERGY CONSUMPTION WHILE IMPROVING PERFORMANCE. THIS INVESTMENT STRENGTHENS THE PHYSICAL INFRASTRUCTURE THAT UNDERPINS RELIABLE, HIGH-QUALITY HEALTH CARE FOR A MEDICALLY VULNERABLE URBAN POPULATION, INCLUDING MANY LOW-INCOME AND UNDERSERVED RESIDENTS WHO DEPEND ON THIS FACILITY FOR ESSENTIAL AND EMERGENCY SERVICES. BY RESTORING DEPENDABLE ENVIRONMENTAL CONTROL TO THESE CRITICAL AREAS, THE PROJECT ENSURES THE CONTINUED SAFE DELIVERY OF STERILE PROCESSING, DIAGNOSTIC IMAGING, INTERVENTIONAL PROCEDURES, AND SUPPORTING SERVICES FOR THE COMMUNITY THE HOSPITAL SERVES.
What it is
- Program
- Congressional Directives (Assistance Listing 93.493)
- Where the work is
- CO
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2026-09-09. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-09 | 00 | A1 | $3.00M | DENVER HEALTH PAVILION A AIR HANDLING UNIT REPLACEMENT - LAUNDRY, STERILE PROCESSING, AND RADIOLOGY - THIS PROJECT REPLACES TWO AGING AIR HANDLING UNITS WITH A SINGLE NEW, HIGH-EFFICIENCY AIR HANDLING UNIT OF APPROXIMATELY 30,000 CFM CAPACITY, INSTALLED ON A… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-13). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗