DECD0000066↗
United Power, Inc. received this grant or assistance award from Department of Energy: $0 obligated so far for clean energy demonstrations. Its latest action was on 2026-02-11.
Key facts · data as of Nov 5, 2026
- Recipient
- United Power, Inc.
- Awarding agency
- Department of Energy
- Obligated to date
- $0
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 5, 2026.
Cite this page: SpendQuery, Award DECD0000066, data as of Nov 5, 2026, https://spendquery.com/award?id=ASST_NON_DECD0000066_089
United Power, Inc.: all federal awards · Department of Energy: spending
THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT RESERVOIR, HELPING TO INCREASE THE RELIABILITY OF CLEAN DRINKING WATER. THE COMMUNITY’S MUNICIPAL WATER TREATMENT PLANT RELIES ON A BACKUP DIESEL GENERATOR DURING PERIODS OF HIGH DEMAND AND POWER OUTAGES. THE AGING GENERATOR HAS BECOME UNRELIABLE WHICH HALTS OPERATIONS AT THE WATER TREATMENT PLANT AND NEGATIVELY IMPACTS COMMUNITIES IN THIS REGION OF COLORADO. HOUSEHOLDS IN RURAL COLORADO HAVE FACED HISTORIC CHALLENGES SECURING A RELIABLE CLEAN WATER SUPPLY, PARTICULARLY IN AREAS WHERE GROUNDWATER IS CONTAMINATED. AS PART OF ITS COMMUNITY BENEFITS PLAN, THE MICROGRID AIMS TO REDUCE THE CARBON FOOTPRINT OF THE PROJECT PERFORMER, UNITED POWER, AND THE CITY OF FORT LUPTON. IT IS ANTICIPATED THAT PROJECT CONSTRUCTION COULD CREATE SIX FULL-TIME EQUIVALENT JOBS, AND UNITED POWER WILL PARTNER WITH LOCAL AIMS COMMUNITY COLLEGE AND THE BUENO CENTER FOR MULTICULTURAL EDUCATION TO PROVIDE CONTRACTING OUTREACH IN THIS COMMUNITY. UNITED POWER WILL WORK WITH SCHNEIDER ELECTRIC TO DESIGN, BUILD AND OPERATE THE FULLY INTEGRATED MICROGRID, WHICH WILL IMPROVE POWER RESILIENCY AT THE WATER TREATMENT PLANT, REDUCE WATER EVAPORATION, AND HELP THE CITY DELIVER RELIABLE WATER SERVICES. TO MAKE THIS UNIQUE PROJECT ECONOMICALLY VIABLE, UNITED POWER AND THE CITY OF FORT LUPTON PLAN TO ENTER AN INNOVATIVE, 20-YEAR AGREEMENT ALLOWING UNITED POWER TO OWN THE MICROGRID WHILE THE CITY OF FORT LUPTON PAYS FOR MICROGRID UPGRADES. THE PROJECT’S POTENTIAL BENEFITS INCLUDE IMPROVED ENERGY RESILIENCY, A 9% DECREASE IN THE CITY’S MONTHLY POWER BILL, AND REDUCED EVAPORATION FROM THE WATER TREATMENT PLANT RESERVOIR. THIS MODEL COULD SERVE AS AN EXAMPLE FOR OTHER MICROGRID PARTNERSHIPS BETWEEN SMALL, RURAL UTILITIES AND LOCAL PUBLIC WORKS DEPARTMENTS, WHICH CAN EXPAND ACCESS TO CLEAN AND RESILIENT ENERGY IN RURAL COMMUNITIES NATIONWIDE.
What it is
- Program
- Clean Energy Demonstrations (Assistance Listing 81.255)
- Where the work is
- Weld, CO · district CO-08
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
5 actions since 2024-09-24. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-11 | 0004 | Adjustment to a completed project | -$6.12M | THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT… |
| 2025-07-22 | 0003 | Revision | $0 | THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT… |
| 2025-06-05 | 0002 | Revision | $0 | THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT… |
| 2024-12-13 | 0001 | Revision | $5.85M | THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT… |
| 2024-09-24 | New award | $279.5K | THIS PROJECT SEEKS TO REPLACE AN AGING DIESEL GENERATOR WITH A MICROGRID CONSISTING OF AN 850-KILOWATT FLOATING SOLAR PV ARRAY AND A 500 KILOWATT (KW) / 1,147 KILOWATT-HOUR (KWH) BATTERY STORAGE SYSTEM SITED ON THE COMMUNITY’S WATER TREATMENT PLANT… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-05). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗