DEEE0009954↗

Oscilla Power Inc received this grant or assistance award from Department of Energy: $0 obligated so far for renewable energy research and development. Its latest action was on 2026-03-12.

Key facts · data as of Nov 24, 2026

Recipient
Oscilla Power Inc
Awarding agency
Department of Energy
Obligated to date
$0

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 24, 2026.

Cite this page: SpendQuery, Award DEEE0009954, data as of Nov 24, 2026, https://spendquery.com/award?id=ASST_NON_DEEE0009954_089

OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A DETAILED ENGINEERING DESIGN FOR ITS UTILITY-SCALE TRITON™ WAVE ENERGY CONVERTER (WEC). OPI’S TRITON™ WEC IS A TWO-BODY POINT ABSORBER THAT CONSISTS OF A SURFACE FLOAT AND VERTICALLY ASYMMETRIC REACTION STRUCTURE CONNECTED BY THREE FLEXIBLE TENDONS. THE DEVICE OPERATES IN MULTIPLE MODES (HEAVE, PITCH/ROLL, SURGE), ALLOWING IT TO CAPTURE ENERGY FROM WAVES EFFICIENTLY ACROSS A WIDE RANGE OF OCEAN CONDITIONS. THREE DRIVETRAINS IN THE SURFACE FLOAT ARE CONNECTED INDEPENDENTLY TO THE TENDONS AND DESIGNED TO CONVERT CAPTURED MECHANICAL ENERGY RELIABLY AND EFFICIENTLY INTO GRID FRIENDLY ELECTRICAL POWER. BASED ON EXTENSIVE NUMERICAL MODELING VALIDATED BY EXTENSIVE (AND INDEPENDENT) TANK TESTING AT MULTIPLE SCALES, THE TRITON IS PROJECTED TO DELIVER SIGNIFICANTLY HIGHER ANNUAL ENERGY PRODUCTION (AEP) THAN CONVENTIONAL WECS OF THE SAME SCALE. THE PROJECT WILL DEVELOP A DETAILED DESIGN FOR A SYSTEM THAT IS PRE-PERMITTED AT PACWAVE TESTING FACILITY AND GENERATE CONSTRUCTION READY DESIGN DRAWINGS.

Cooperative Agreement (B) · Department of Energy · to Oscilla Power Inc (UEI Z4XQDMAYKNJ3) · data as of 2026-11-24

Obligated to date$05 actions
Period2022-12-01 → 2026-03-12first to last action

What it is

Program
Renewable Energy Research and Development (Assistance Listing 81.087)
Where the work is
King, WA · district WA-07

Obligations by fiscal year

FY2023$0
FY2024$0
FY2026$0

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

5 actions since 2022-12-01. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-03-120005Revision$0OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A…
2026-02-130004Revision$0OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A…
2024-06-120003Revision$0OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A…
2024-03-060002Revision$0OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A…
2022-12-010001Revision$0OSCILLA POWER, INC. (OPI) WILL INTEGRATE SPECIFIC INNOVATIONS IDENTIFIED FOR PERFORMANCE IMPROVEMENT THAT HAVE BEEN PROVEN AND VALIDATED THROUGH PRIOR DOE WATER POWER TECHNOLOGIES OFFICE (WPTO) GRANTS, DE-EE0007346, DE-EE0008387 AND DE-EE0008625, INTO A…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-24). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗