Plug Power Inc. received this grant or assistance award from Department of Energy: $28.20M obligated so far for renewable energy research and development. Its latest action was on 2025-10-08.

Key facts · data as of Nov 18, 2026

Recipient
Plug Power Inc.
Awarding agency
Department of Energy
Obligated to date
$28.20M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 18, 2026.

Cite this page: SpendQuery, Award DEEE0011343, data as of Nov 18, 2026, https://spendquery.com/award?id=ASST_NON_DEEE0011343_089

THE PROJECT WILL DEMONSTRATE A PRODUCTION PATHWAY TO MEET THE PROJECTED STACK COST OF $40/KW FOR 100,000 HEAVY DUTY STACKS PER YEAR. TO MEET THESE OBJECTIVES, THE TEAM WILL MANUFACTURE A HIGH-PERFORMANCE MEMBRANE ELECTRODE ASSEMBLY THAT MEETS THE PROGRAM GOALS OF 2.5 KW/GPGM POWER AT 1.07 A CM-2 AND 0.7 V AFTER 25,000 HOURS OF OPERATION. THE STACKS WILL BE MANUFACTURED ON AN INTEGRATED SINGLE LINE TO MEET THE SPEED OF 20,000 STACKS PER YEAR AT THE TARGET RATES SHOWN IN TABLE 1. THE PRESENT GIGAFACTORY IS CAPABLE OF OPERATING 24/7 WITH THREE 8-HOUR SHIFTS. TO MEET THE FINAL PROGRAM GOALS, 6 STACKS PER HOUR MAY BE CARRIED OUT IN 6 PARALLEL PIECES OF TEST EQUIPMENT. PLUG PRESENTLY OWNS 3 TEST STATIONS THAT CAN BE USED FOR BREAK IN, AND THE RESULTS WILL BE EXTRAPOLATED TO ASSUME THE PURCHASE OF 3 MORE STATIONS AFTER COMPLETION OF THE PROGRAM. A KEY METRIC FOR THE PROGRAM TASK IS OVERALL EQUIPMENT EFFECTIVENESS (OEE)

Cooperative Agreement (B) · Department of Energy · to Plug Power Inc. (UEI M8FCXLYU9Q69) · data as of 2026-11-18

Obligated to date$28.20M2 actions
Period2024-09-25 → 2025-10-08first to last action

What it is

Program
Renewable Energy Research and Development (Assistance Listing 81.087)
Where the work is
Monroe, NY · district NY-25
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2024$28.20M
FY2026$0

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

2 actions since 2024-09-25. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2025-10-080001Revision$0THE PROJECT WILL DEMONSTRATE A PRODUCTION PATHWAY TO MEET THE PROJECTED STACK COST OF $40/KW FOR 100,000 HEAVY DUTY STACKS PER YEAR. TO MEET THESE OBJECTIVES, THE TEAM WILL MANUFACTURE A HIGH-PERFORMANCE MEMBRANE ELECTRODE ASSEMBLY THAT MEETS THE PROGRAM…
2024-09-25New award$28.20MTHE PROJECT WILL DEMONSTRATE A PRODUCTION PATHWAY TO MEET THE PROJECTED STACK COST OF $40/KW FOR 100,000 HEAVY DUTY STACKS PER YEAR. TO MEET THESE OBJECTIVES, THE TEAM WILL MANUFACTURE A HIGH-PERFORMANCE MEMBRANE ELECTRODE ASSEMBLY THAT MEETS THE PROGRAM…