DEEE0011721↗
Abb Inc. received this grant or assistance award from Department of Energy: $1.26M obligated so far for conservation research and development. Its latest action was on 2026-08-06.
Key facts · data as of Nov 19, 2026
- Recipient
- Abb Inc.
- Awarding agency
- Department of Energy
- Obligated to date
- $1.26M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 19, 2026.
Cite this page: SpendQuery, Award DEEE0011721, data as of Nov 19, 2026, https://spendquery.com/award?id=ASST_NON_DEEE0011721_089
Abb Inc.: all federal awards · Department of Energy: spending
THIS PROJECT WILL DEMONSTRATE BREAKTHROUGH CONSTRUCTION AND PERFORMANCE OF HIGH-EFFICIENCY VARIABLE-SPEED MACHINES BASED ON PERMANENT MAGNET ASSISTED SYNCHRONOUS RELUCTANCE MOTORS USING MANGANESE-BISMUTH (MN-BI) POLYMER BONDED MAGNETS. THE COMBINATION OF NEW ROTOR DESIGN AND MANUFACTURING PROCESSES WITH THE NEW MAGNET MATERIAL WILL ENABLE EFFICIENCY AS HIGH AS RARE-EARTH-MAGNET-BASED MOTORS AT COSTS COMPARATIVE TO INDUCTION OR FERRITE-BASED MOTORS. THE PROPOSED SOLUTION COMPRISES: 1. 22.4KW, 4-POLE, INDUSTRIAL GENERAL PURPOSE, PMASR (PERMANENT MAGNET ASSISTED SYNCHRONOUS MOTOR) MOTOR TO OPERATE AT 1800 RPM WITH A MINIMUM EFFICIENCY OF 95.5% USING MN-BI POLYMER BONDED PM. 2. 100KW PEAK POWER, 18000 RPM PMASR TRACTION MACHINE USING MN-BI POLYMER BONDED PM. 3. DEVELOPMENT OF A MECHANICALLY STABLE MN-BI POLYMER BONDED PM WITH BR = 0.30 T AT ROOM TEMPERATURE AND HCJ = 1600 KA/M AT 125OC. 4. MANUFACTURING STRATEGY FOR INDUSTRIAL PM PRODUCTION USING COMPRESSION MOLDING. 5. MARKET TRANSFORMATION PLAN INCLUDING COST TARGETS AND LIFE CYCLE ASSESSMENT TARGETED BENEFITS OF THIS PROJECT ARE 1. UTILIZE (US-NORTH AMERICAN) MINERAL SUPPLY-CHAIN AND ASSESS RESOURCES AVAILABILITY (MAINLY BI, WITH CURRENTLY NO MAJOR USE IN THE MOTOR INDUSTRY), PROVIDING HIGH-AGGREGATED VALUE SUPPLY CHAIN DIVERSIFICATION; 2. DEMONSTRATE FIRST NON-RE MAGNET BRIDGING PERFORMANCE-COST GAP BETWEEN HARD FERRITES AND RE PM IN INDUSTRIAL GENERAL PURPOSE AND TRACTION MOTORS.; 3. DETERMINE CAPITAL AND OPERATING EXPENSES DATA FOR MANUFACTURING OF MN-BI POLYMER BONDED PM TECHNOLOGY.; AND 4. ENABLE FUTURE REDUCTIONS IN CO2 EMISSION OF PMASR MOTOR CONSTRUCTION (COMPARED TO THOSE USING RE-BASED PM) AND OPERATION FOR INDUSTRIAL APPLICATIONS, RESPONSIBLE FOR OVER 40% OF THE WORLD ELECTRICITY CONSUMPTION, AND FROM THE HIGHEST POLLUTING TRANSPORTATION SECTOR WITH 1,852 MMT OF CO2 IN THE US IN 2022. DEVELOPMENT WILL INCLUDE 2-4 ROTORS TARGETING INDUSTRIAL GENERAL PURPOSE INDUSTRIAL APPLICATIONS AND ONE TRACTION MOTOR USING PM COMPRESSION MOLDING. TASK DETAILS FOLLOW. YEAR 1 (BP-1): WILL FOCUS ON PARALLEL ACTIVITIES RELATED TO ROTOR DESIGN, ROTOR MANUFACTURING, MATERIALS AND TECHNICAL-ECONOMIC ANALYSIS. DELIVERABLES FROM THE FIRST BUDGET PERIOD INCLUDE: (A) MN-BI POWDER WITH PHYSICAL FEATURES FOR PM PRODUCTION VIA COMPRESSION MOLDING; (B) COMPRESSION MOLDED MN-BI BONDED PM AT LEAST “GOOD” AS PER ACCEPTANCE CLASSIFICATION TABLE BELOW (FROM TECHNICAL VOLUME, TABLE 3); (C) ELECTROMAGNETIC AND MECHANICAL LAMINATION DESIGN FOR AN INDUSTRIAL, GENERAL PURPOSE ROTOR; (D) INDUSTRIAL ROTOR CONSTRUCTION AND TEST UTILIZING COMPRESSION MOLDED MN-BI POLYMER BONDED PM; (E) ELECTROMAGNETIC AND MECHANICAL LAMINATION DESIGN FOR TRACTION ROTOR PROTOTYPE. (F) TEST DATA ON MN-BI POLYMER BONDED PM PHYSICAL AND CHEMICAL STABILITY; (G) TEST DATA COLLECTED FROM MN-BI ROTORS; (H) SUPPLY CHAIN CONSIDERATIONS FOR INDUSTRIALIZATION OF MN-BI POLYMER BONDED PM; (I) TECHNO-ECONOMIC ANALYSIS FOR INDUSTRIAL, GENERAL PURPOSE MOTOR; AND (J) LIFE CYCLE ASSESSMENT OF MN-BI POLYMER BONDED PM..
What it is
- Program
- Conservation Research and Development (Assistance Listing 81.086)
- Where the work is
- Wake, NC · district NC-02
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2026-08-06. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-08-06 | New award | $1.26M | THIS PROJECT WILL DEMONSTRATE BREAKTHROUGH CONSTRUCTION AND PERFORMANCE OF HIGH-EFFICIENCY VARIABLE-SPEED MACHINES BASED ON PERMANENT MAGNET ASSISTED SYNCHRONOUS RELUCTANCE MOTORS USING MANGANESE-BISMUTH (MN-BI) POLYMER BONDED MAGNETS. THE COMBINATION OF NEW… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-19). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗