DEGD0000038↗
Oregon Department of Energy received this grant or assistance award from Department of Energy: $30.90M obligated so far for grid infrastructure deployment and resilience. Its latest action was on 2026-02-11.
Key facts · data as of Nov 21, 2026
- Recipient
- Oregon Department of Energy
- Awarding agency
- Department of Energy
- Obligated to date
- $30.90M
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 21, 2026.
Cite this page: SpendQuery, Award DEGD0000038, data as of Nov 21, 2026, https://spendquery.com/award?id=ASST_NON_DEGD0000038_089
Oregon Department of Energy: all federal awards · Department of Energy: spending
BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS.
What it is
- Program
- Grid Infrastructure Deployment and Resilience (Assistance Listing 81.254)
- Where the work is
- Marion, OR · district OR-06
- Funding law
- Infrastructure law (IIJA)
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
9 subawards totaling $10.79M (34.9% of what was obligated), as Oregon Department of Energy reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subrecipient | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Pacificorp | $4.10M | 1 | OR | 2025-12-15 | 2025-12-15 |
| Umatilla Electric Cooperative | $1.48M | 1 | OR | 2025-11-07 | 2025-11-07 |
| Columbia Power Cooperative Association | $1.33M | 1 | OR | 2025-01-15 | 2025-01-15 |
| Coos-Curry Electric Cooperative, Inc. | $1.13M | 1 | OR | 2025-02-01 | 2025-02-01 |
| Midstate Electric Cooperative, Inc. | $836.4K | 1 | OR | 2026-04-08 | 2026-04-08 |
| Columbia Basin Electric Cooperative, Inc. | $700.1K | 1 | OR | 2025-02-12 | 2025-02-12 |
| Forest Grove, City of | $438.2K | 1 | OR | 2025-04-11 | 2025-04-11 |
| Oregon Trail Electric Consumers Cooperative Inc | $392.4K | 1 | OR | 2025-05-08 | 2025-05-08 |
| Columbia River Peoples Utility District | $377.4K | 1 | OR | 2025-04-23 | 2025-04-23 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2025-12-15 | Pacificorp | $4.10M | THIS PROJECT WILL ENHANCE WILDFIRE RESILIENCE IN JOSEPHINE COUNTY, OREGON, BY RECONDUCTORING 12.54 MILES OF DISTRIBUTION LINES WITH COVERED CONDUCTOR AND REPLACING 311 EXISTING WOOD POLES WITH FIRE-RESISTANT COMPOSITE… |
| 2025-11-07 | Umatilla Electric Cooperative | $1.48M | UNDERGROUND 4.55 MILES OF DISTRIBUTION LINE IN THREE RURAL AREAS. |
| 2025-01-15 | Columbia Power Cooperative Association | $1.33M | THE PROJECT INCLUDES THE FOLLOWING ACTIVITIES TO REDUCE THE LIKELIHOOD AND CONSEQUENCES OF DISRUPTIVE EVENTS: A. PURCHASE EQUIPMENT AND CONVERT AN EXISTING SERVICE TRUCK TO A FLATBED TRUCK WITH FIREFIGHTING CAPABILITY,… |
| 2025-02-01 | Coos-Curry Electric Cooperative, Inc. | $1.13M | CONVERSION TO UNDERGROUND OF APPROXIMATELY 2.16 MILES OF OVERHEAD DISTRIBUTION LINE IN COOS COUNTY ALONG HIGHWAY 42 IN EXISTING RIGHTS-OF-WAY. |
| 2026-04-08 | Midstate Electric Cooperative, Inc. | $836.4K | THE PROJECT INVOLVES THE REMOVAL OF 72 POLES AND APPROXIMATELY 3.95 MILES OF OVERHEAD ELECTRICAL CONDUCTOR. TRENCHING WILL TAKE PLACE ALONG THE SAME 3.95 MILES OF RIGHT-OF-WAY TO INSTALL IN-CONDUIT UNDERGROUND CABLE… |
| 2025-02-12 | Columbia Basin Electric Cooperative, Inc. | $700.1K | CONVERSION TO UNDERGROUND OF APPROXIMATELY 10 MILES OF RURAL OVERHEAD ELECTRICAL DISTRIBUTION LINES IN THREE SEPARATE SECTIONS NEAR THE CITY OF CONDON. |
| 2025-04-11 | Forest Grove, City of | $438.2K | RELOCATION OF EXISTING OVERHEAD PRIMARY VOLTAGE DISTRIBUTION LINES TO UNDERGROUND ALONG DAVID HILL ROAD IN FOREST GROVE, OR 97116, TOTALING APPROXIMATELY 3500 FT OF PRIMARY DISTRIBUTION LINE IN PVC CONDUIT. |
| 2025-05-08 | Oregon Trail Electric Consumers Cooperative Inc | $392.4K | INSTALLATION OF SCADA ENABLED, UPGRADED FIELD RECLOSERS, FUSE BANKS AND RELATED EQUIPMENT THAT OPERATE AS THE CONTROLLING DEVICES ON 23 POLE LOCATIONS IN RECIPIENT'S SERVICE AREA FOR AREAS SUBJECT TO PUBLIC SAFETY… |
| 2025-04-23 | Columbia River Peoples Utility District | $377.4K | CONVERSION TO UNDERGROUND OF APPROXIMATELY 1,508 FEET OF OVERHEAD POWER LINES BETWEEN THE CITIES OF ST. HELENS AND COLUMBIA CITY, THE MAIN FEEDER SERVING THE CITY OF ST. HELENS' WATER FILTRATION FACILITY. |
Every action
5 actions since 2023-06-30. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-11 | 0004 | Revision | $0 | INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST… |
| 2025-06-10 | 0003 | Revision | $0 | BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS. |
| 2025-01-07 | 0002 | Revision | $0 | BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS. |
| 2024-07-22 | 0001 | Revision | $10.99M | BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS. |
| 2023-06-30 | New award | $19.91M | BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗