ID-2026-010↗

Valley Regional Transit received this grant or assistance award from Federal Transit Administration: $2.50M obligated so far for federal transit formula grants. Its latest action was on 2026-03-04.

Key facts · data as of Nov 21, 2026

Recipient
Valley Regional Transit
Awarding agency
Federal Transit Administration (Department of Transportation)
Obligated to date
$2.50M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 21, 2026.

Cite this page: SpendQuery, Award ID-2026-010, data as of Nov 21, 2026, https://spendquery.com/award?id=ASST_NON_ID-2026-010_069

APPLICATION PURPOSE: THE PURPOSE OF THIS GRANT IS TO FUND THE ARCHITECTURAL DESIGN CONSTRUCTION AND NECESSARY INFRASTRUCTURE UPGRADES FOR A NEW ADMINISTRATIVE AND MAINTENANCE FACILITY AT THE VALLEY REGIONAL TRANSIT ORCHARD FACILITY. THIS INCLUDES BUILDING A 4700-SQUARE-FOOT STRUCTURE WITH OFFICES AND A GARAGE UPGRADING UTILITIES AND CONSTRUCTING A PAVED YARD WITH FENCING AND SECURITY FEATURES.; ACTIVITIES PERFORMED: THE ACTIVITIES TO BE PERFORMED UNDER THIS GRANT INCLUDE SEVERAL KEY COMPONENTS:ARCHITECTURAL DESIGN: DEVELOP THE DESIGN FOR A NEW 4700-SQUARE-FOOT ADMINISTRATIVE AND GARAGE/STORAGE BUILDING FEATURING OFFICES A CONFERENCE ROOM RESTROOMS AND A GARAGE BAY WITH STORAGE AND SHOP AREAS. THE DESIGN WILL UTILIZE A PRE-ENGINEERED METAL BUILDING CONSTRUCTION TYPE.SITE PREPARATION AND UTILITY UPGRADES: UPGRADE UTILITIES FOR SEWER WATER AND POWER ACROSS APPROXIMATELY 2.24 ACRES SURROUNDING THE NEW BUILDING. THIS INCLUDES GRADING AND COMPACTION FOR THE SUB-BASE AND ASPHALT BASE CREATING A GRAVEL LAYDOWN LOT AND IMPLEMENTING DRAINAGE AND STORMWATER CONVEYANCE SYSTEMS COMPLIANT WITH IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC).CONSTRUCTION ENGINEERING AND INSPECTION SERVICES: PROVIDE BIDDING SUPPORT COST ESTIMATES AND PROCUREMENT STANDARDS. ENSURE COMPLIANCE WITH FEDERAL CONSTRUCTION SPECIFICATIONS INCLUDING BEST VALUE AND PREVAILING WAGES DURING CONSTRUCTION.YARD CONSTRUCTION: CONSTRUCT APPROXIMATELY 1 ACRE OF PAVEMENT INSTALL 880 LINEAR FEET OF FENCING PER HOMELAND SECURITY AND BOISE AIRPORT STANDARDS AND SET UP TWO NEW CARD READER ACCESSIBLE VEHICLE GATES AND YARD LIGHTING. ESTABLISH A 1-ACRE GRAVEL LAYDOWN YARD FOR BULK STORAGE AND AS AN OVERFLOW AREA.VERTICAL CONSTRUCTION: BUILD THE NEW ADMINISTRATIVE AND MAINTENANCE FACILITY AT AN ESTIMATED COST OF $325 PER SQUARE FOOT TOTALING $1527500 FOR THE 4700-SQUARE-FOOT STRUCTURE.LANDSCAPING: LANDSCAPE THE PERIMETER OF THE SITE AND THE AREAS SURROUNDING THE BUILDING TO ENHANCE THE AESTHETIC APPEAL AND FUNCTIONALITY OF THE FACILITY.; EXPECTED OUTCOMES: THE EXPECTED OUTCOMES OF THIS PROJECT INCLUDE THE SUCCESSFUL CONSTRUCTION OF A MODERN EFFICIENT 4700-SQUARE-FOOT ADMINISTRATIVE AND MAINTENANCE FACILITY AT THE VALLEY REGIONAL TRANSIT ORCHARD FACILITY. THIS WILL ENHANCE THE OPERATIONAL EFFICIENCY OF THE TRANSIT SYSTEM PROVIDING A CENTRALIZED LOCATION FOR ADMINISTRATIVE FUNCTIONS AND VEHICLE MAINTENANCE. THE UPGRADED UTILITIES AND IMPROVED INFRASTRUCTURE WILL ENSURE RELIABLE AND SUSTAINABLE SERVICE WHILE THE NEW YARD AND STORAGE AREAS WILL FACILITATE BETTER RESOURCE MANAGEMENT AND FUTURE EXPANSION. OVERALL THE PROJECT WILL SUPPORT THE GROWTH AND EFFECTIVENESS OF VALLEY REGIONAL TRANSIT CONTRIBUTING TO IMPROVED PUBLIC TRANSPORTATION SERVICES AND REDUCED CARBON EMISSIONS IN THE REGION.; INTENDED BENEFICIARIES: EMPLOYEES AND CUSTOMERS OF VALLEY REGIONAL TRANSIT; SUBRECIPIENT ACTIVITIES: NONE

Formula Grant (A) · Federal Transit Administration · to Valley Regional Transit (UEI JZAGN29CGAT6) · data as of 2026-11-21

Obligated to date$2.50M1 action
Period2026-03-04 → 2026-03-04first to last action

What it is

Program
Federal Transit Formula Grants (Assistance Listing 20.507)
Where the work is
ID
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2026$2.50M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-03-04. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-03-040New award$2.50MAPPLICATION PURPOSE: THE PURPOSE OF THIS GRANT IS TO FUND THE ARCHITECTURAL DESIGN CONSTRUCTION AND NECESSARY INFRASTRUCTURE UPGRADES FOR A NEW ADMINISTRATIVE AND MAINTENANCE FACILITY AT THE VALLEY REGIONAL TRANSIT ORCHARD FACILITY. THIS INCLUDES BUILDING A…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗