APPLICATION PURPOSE: THE PURPOSE OF THIS APPLICATION IS TO REQUEST $661263.00 [$132253.00 IN TDCS] FROM FY 2026 SECTION 5307 FUNDS ALLOCATED IN THE STIP 2023-2026 AMENDMENT 5 TO COMPLETE THE REHABILITATION COST OF THE PUBLIC VEHICLES TERMINAL. THE GRANT WILL BE ALLOCATED TO TWO PROJECTS: PROJECT 1. REHABILITATION OF THE JOSE (PEPE) MORALES PUBLIC VEHICLES TERMINAL: STRUCTURES FOR $447371.00 - SECTION 5307 FY 2021 FUNDS; PROJECT 2. REHABILITATION OF THE JOSE (PEPE) MORALES PUBLIC VEHICLES TERMINAL FINISHES AND OTHERS FOR $213892.00- SECTION 5307 FY 2022 FUNDS. THE MUNICIPALITY WILL CONDUCT THE REHABILITATION IN TWO STAGES. THE TOTAL COST OF STAGES 1 AND 2 IS $2705905.00 INCLUDING $577286 IN DESIGN AND $1533503.00 IN REHABILITATION; STAGES 1 AND 2 COST $595116.00. * FIRST STAGE: COVERS THE FIRST FLOOR AND THE REQUIRED STRUCTURAL REINFORCEMENT AT A COST OF $1533503.00 FOR REHABILITATION. * SECOND STAGE: COVERS THE SECOND LEVEL AT A COST OF $595116.00.THE FUNDS FOR THE FIRST STAGE ARE FROM THE AWARD PR-90-X347 FOR $872240.00 AND $661263.00 FROM THIS APPLICATION. THE SECOND-STAGE FUNDS OF $595116.00 WILL BE SUBMITTED FOR INCLUSION IN THE STIP 2026-2027.; ACTIVITIES PERFORMED: THE APPLICATION SCOPE OF WORK INCLUDES:1. BUS STATIONS STOPS TERMINALS REHAB / RENOVATION BUS STATIONS - $422920 [$845841 TDCS]. 2. CONTRACT INSURANCE - $158860 [$31 772 TDCS]3. INSPECTION SERVICES - $42915 [$8583 TDCS]4. CONTINGENCIES/PROGRAM RESERVE - 11.73.00 - $26732 [$5346 DCS]5. BUS SURVEILL/SECURITY SYSTEM SECURITY REQUIREMENT AT 1.0% CALCULATED OVER $654650 $6546 [$1309.00 TDCS]6. BUS: SUPPORT EQUIP AND FACILITIES - SAFETY REQUIREMENT AT 0.75% CALCULATED OVER $657956 WHICH IS THE TOTAL GRANT AMOUNT BEFORE THE SECURITY REQUIREMENT - $3290.00 [$658.00 TDCS].THE ACTIVITIES ARE GROUPED PER PROJECT AS FOLLOWS:PROJECT 1. REHABILITATION OF THE JOSE (PEPE) MORALES PUBLIC VEHICLES TERMINAL: STRUCTURES FOR $447371 SECTION 5307 FY 2021 FUNDS INCLUDES THE FOLLOWING ACTIVITIES: 1. SCOPE 113 11.34. 01 - BUS STATIONS STOPS TERMINALS REHAB / RENOVATION BUS STATIONS - $267915 [$53583 TDCS] 2. CONTRACT INSURANCE - 3RD PARTY 11.71.05 - $158070 [$31 614 TDCS] 3. CONTINGENCIES/PROGRAM RESERVE 11.73.00 - $21386 [$4277 TDCS]FOR A TOTAL OF $447371 [$89474 TDCS].PROJECT 2. REHABILITATION OF THE JOSE (PEPE) MORALES PUBLIC VEHICLES TERMINAL FINISHES AND OTHERS FOR $213892.00- SECTION 5307 FY 2022 FUNDS INCLUDES THE FOLLOWING ACTIVITIES: 1. SCOPE 113 11.34. 01 - BUS STATIONS STOPS TERMINALS REHAB / RENOVATION BUS STATIONS $155005 [$31001 TDCS] INCLUDES: SITEWORK FINISHES WITH DOORS WINDOWS FLOORS PAINTING BENCHES AND TRASH RECEPTACLES. 2. A PORTION OF CONTRACT INSURANCE - 3RD PARTY 11.71.01 - $790.00 [$158.00 TDCS]; 3. A PORTION OF CONTINGENCIES/PROGRAM RESERVE 11.73.00 - $5346 [$1069 TDCS] 4. 11.71.11 INSPECTION SERVICES (FA) - 3RD PARTY $42915.00 [$8583 TDCS] 5. 11.34.07REHAB/RENOVATE - BUS SURVEILL/SECURITY SYSTEM$6546.00 [$1309.00 TDCS] 6. 11.42.20ACQUIRE - MISC SUPPORT EQUIPMENT$3290.00 [$658.00]FOR A TOTAL OF $213892.00 [42778.00 TDCS].; EXPECTED OUTCOMES: THE EXPECTED OUTCOMES OF THIS GRANT ARE:A) CREATE THE REQUIRED INFRASTRUCTURE TO PROVIDE AN ADA-ACCESSIBLE PUBLIC TRANSPORTATION MAIN FACILITY.B) SUPPORT AND ENHANCE THE PUBLIC TRANSPORTATION SERVICE AND THE ANASCO URBAN CENTER WITH AN ACCESSIBLE AND RENOVATED FEDERALLY FUNDED TRANSIT FACILITY.; INTENDED BENEFICIARIES: THE USERS OF THE ANASCO PUBLIC TRANSPORTATION SYSTEM ARE THE ENTIRE POPULATION OF 25094 (AMERICAN COMMUNITY SURVEY 2024: ACS 5-YEAR ESTIMATES SUBJECT TABLES). THIS POPULATION SHOWS THE FOLLOWING CHARACTERISTICS: PERSONS WITH ANY TYPE OF DISABILITY IN ANASCO COMPRISE 24.8% OF THE TOTAL CIVILIAN NONINSTITUTIONALIZED POPULATION OF 24978. A TOTAL OF 4075 OR 16.8% OF THE POPULATION HAS AMBULATORY DIFFICULTY (U.S. CENSUS BUREAU). DISABILITY CHARACTERISTICS AMERICAN COMMUNITY SURVEY ACS 5-YEAR ESTIMATES SUBJECT TABLES TABLE S1810 2024 HTTPS://DATA.CENSUS.GOV/TABLE/ACSST5Y2024.S1810?Q=S1810: ACCESSED ON JUNE 16 2026). THE MEDIAN HOUSEHOLD INCOME IN ANASCO WAS $24436 FOR THE ESTIMATE OF 2024. (ACSST5Y2024). FORTY PERCENT OF FAMILIES WERE UNDER THE POVERTY LEVEL IN ANASCO IN 2024 (ACSST5Y2024). THE GINI INDEX OF INCOME INEQUALITY FOR ANASCO WAS 47.79% (ACSDT5Y2024).; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENT ACTIVITIES IN THIS GRANT.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
1 action since 2026-09-18. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-18 | 0 | New award | $661.3K | APPLICATION PURPOSE: THE PURPOSE OF THIS APPLICATION IS TO REQUEST $661263.00 [$132253.00 IN TDCS] FROM FY 2026 SECTION 5307 FUNDS ALLOCATED IN THE STIP 2023-2026 AMENDMENT 5 TO COMPLETE THE REHABILITATION COST OF THE PUBLIC VEHICLES TERMINAL. THE GRANT WILL… |