R26AP00021↗

Trout Unlimited, Inc. received this grant or assistance award from Bureau of Reclamation: $733.6K obligated so far for watersmart (sustain and manage america’s resources for tomorrow). Its latest action was on 2026-01-21.

Key facts · data as of Nov 5, 2026

Recipient
Trout Unlimited, Inc.
Awarding agency
Bureau of Reclamation (Department of the Interior)
Obligated to date
$733.6K

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 5, 2026.

Cite this page: SpendQuery, Award R26AP00021, data as of Nov 5, 2026, https://spendquery.com/award?id=ASST_NON_R26AP00021_014

THE PURPOSE OF THE PROJECT THE ALTA HARRIS CREEK BOISE RIVER SIDE CHANNEL PROJECT (PROJECT) WILL IMPROVE AQUATIC HABITAT IN THE BOISE RIVER BY RESTORING SPAWNING AND REARING HABITAT FOR SALMONID FISHES AND PROVIDE FISH PASSAGE CONNECTING THE LOWER BOISE RIVER TO BARBER POOL. THE PROJECT ENTAILS THE CONSTRUCTION OF 1,600 FEET (ABOUT 487.68 M) OF SIDE CHANNEL AND A FISH PASSAGE FACILITY SOURCING WATER FROM BARBER POOL. THE ACTIVITIES TO BE PERFORMED APPROXIMATELY 450 FEET OF THE CHANNEL WOULD BE A CLEAN OUT OF AN EXISTING BACK CHANNEL AN ADDITIONAL REMAINING 450 FEET WOULD BE EXCAVATED ON LAND A PORTION OF THE EMBANKMENT WILL BE EXCAVATED AND A FISHWAY WITH A WATER CONTROL HEAD GATE AND A TRASH RACK WILL BE CONSTRUCTED ON THE UPSTREAM SIDE DOWNSTREAM OF BARBER POOL A BOX CULVERT WILL BE INSTALLED, SUFFICIENT TO HANDLE VEHICLES ON LYSTED ROAD, AN UNPAVED DRIVEWAY TO THE BARBER DAM POWERHOUSE APPROXIMATELY 700 FEET OF THE CHANNEL WILL BE NATURE-LIKE AND CONNECT TO THE EXISTING ALTA HARRIS CREEK SIDE CHANNEL. IN THIS SECTION WE WILL INCLUDE A SERIES OF POOLS AND STEPS FEATURING LARGER ROCKS, WOOD AND BOULDERS AND THESE HABITAT FEATURES WILL ALLOW FOR RESTING AREAS FOR FISH THAT MAY BE MIGRATING UPSTREAM IN THIS SECTION BECAUSE IT WILL BE HIGHER GRADIENT THAN ANY OTHER PORTION OF THE SIDE CHANNEL MONITOR THE PROJECT DURING AND AFTER CONSTRUCTION IS COMPLETE AND WATER IS FLOWING IN THE CHANNEL. THE EXPECTED DELIVERABLES OR OUTCOMES THE EXPECTED DELIVERABLES FROM THE PROJECT INCLUDE THE FOLLOWING BENEFITS TO THE BOISE RIVER CORRIDOR: RECONNECT 2.5 MILES (ABOUT 4 KM) OF MAIN BOISE RIVER HABITAT FOR AQUATIC SPECIES AND MORE THAN ONE MILE (ABOUT 1.6 KM) OF SIDE CHANNEL HABITAT FOR SPAWNING AND REARING OF YOUNG OF YEAR FISH, AND AN ASSOCIATED RIPARIAN AREA ON APPROXIMATELY FIVE ACRES PROVIDE AN EXTRA OUTLET FROM BARBER DAM THAT WILL PROVIDE ASSURANCE OF FLOWS TO THE LOWER BOISE RIVER WHEN HYDROPOWER OPERATIONS ARE INTERRUPTED AND IN TURN DISRUPT RIVER FLOWS THAT BENEFITS IRRIGATORS AND WATER USERS RIPARIAN COVER OF THE SIDE CHANNEL WILL HELP MODERATE HIGHER TEMPERATURES THAT OCCUR FROM SOLAR EXPOSURE DURING SUMMER MONTHS A HALF MILE (ABOUT 0.8 KM) OF BOISE RIVER WHERE RISK OF FISH ENTRAINMENT INTO AN IRRIGATION CANAL WILL BE BYPASSED BY THE SIDE CHANNEL RUSSIAN OLIVE TREES (INVASIVE) WILL BE REMOVED AND REPLACED WITH WILLOW AND COTTONWOOD PLANTINGS (NATIVE) CONSTRUCT A VIEWING AREA OF THE SIDE CHANNEL STREAM WITH INTERPRETIVE SIGNS. THE INTENDED BENEFICIARIES WHILE SOME BENEFICIARIES MAY BE OBVIOUS, LIKE AQUATIC SPECIES AND WILDLIFE IN OUR RIVER RESTORATION AND FISH PASSAGE PROJECT, OTHER BENEFICIARIES INCLUDE RECREATIONALISTS, WATER USERS AND IRRIGATORS FROM THE AGRICULTURAL SECTOR, AND OTHER STAKEHOLDERS INVESTED IN THE BOISE RIVER THROUGHOUT A MULTITUDE OF DISCIPLINES, OUTLINED IN MULTIPLE PLANNING DOCUMENTS FOUND THROUGHOUT OUR APPLICATION. ANY SUBRECIPIENT ACTIVITIES, IF KNOWN. THIS PROJECT WILL BE AWARDED TO AND MANAGED BY TROUT UNLIMITED THERE WILL NOT BE ANY SUBRECIPIENT ACTIVITIES.

Project Grant (B) · Bureau of Reclamation · to Trout Unlimited, Inc. (UEI U1KEGKVBBE68) · data as of 2026-11-05

Obligated to date$733.6K1 action
Period2026-01-21 → 2026-01-21first to last action

What it is

Program
Watersmart (Sustain and Manage America’s Resources for Tomorrow) (Assistance Listing 15.507)
Where the work is
Ada, ID
Funding law
Infrastructure law (IIJA)

Obligations by fiscal year

FY2026$733.6K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-01-21. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-01-21ORIGNew award$733.6KTHE PURPOSE OF THE PROJECT THE ALTA HARRIS CREEK BOISE RIVER SIDE CHANNEL PROJECT (PROJECT) WILL IMPROVE AQUATIC HABITAT IN THE BOISE RIVER BY RESTORING SPAWNING AND REARING HABITAT FOR SALMONID FISHES AND PROVIDE FISH PASSAGE CONNECTING THE LOWER BOISE…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-05). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗