R26AP00089↗

Tumalo Irrigation District received this grant or assistance award from Bureau of Reclamation: $8.40M obligated so far for fish and wildlife coordination act. Its latest action was on 2026-07-29.

Key facts · data as of Nov 14, 2026

Recipient
Tumalo Irrigation District
Awarding agency
Bureau of Reclamation (Department of the Interior)
Obligated to date
$8.40M

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 14, 2026.

Cite this page: SpendQuery, Award R26AP00089, data as of Nov 14, 2026, https://spendquery.com/award?id=ASST_NON_R26AP00089_014

AWARD PURPOSE: THIS PROJECT WILL CONVERT APPROXIMATELY 54,351 LINEAR FEET OF OPEN EARTHEN IRRIGATION CANAL TO A BURIED PRESSURIZED PIPELINE SYSTEM. THE EXISTING CANAL EXPERIENCES SIGNIFICANT SEEPAGE LOSS, OPERATIONAL INEFFICIENCIES, AND ONGOING MAINTENANCE DEMANDS THAT REDUCE OVERALL DELIVERY EFFICIENCY. REPLACING THE CANAL WITH A CLOSED PIPELINE WILL CONSERVE WATER BY REDUCING CONVEYANCE LOSSES WHILE IMPROVING OPERATIONAL CONTROL AND DELIVERY RELIABILITY FOR IRRIGATORS SERVED BY THE SYSTEM. THE PROJECT ALSO INCLUDES INSTALLATION OF TURNOUT STRUCTURES AND SYSTEM CONTROL FEATURES NECESSARY TO MAINTAIN SERVICE TO IRRIGATORS ALONG THE PIPELINE ALIGNMENT. BY REDUCING SEEPAGE AND OPERATIONAL LOSS, THE PROJECT WILL HELP RETAIN MORE WATER WITHIN THE BASIN DURING PERIODS OF LIMITED SUPPLY. THE TOTAL ESTIMATED PROJECT COST IS $8,442,148, INCLUDING CONSTRUCTION, ENGINEERING, CONSTRUCTION MANAGEMENT, AND CONTINGENCY.ACTIVITIES TO BE PERFORMED: CONVERT APPROXIMATELY 54,351 LINEAR FEET OF OPEN EARTHEN IRRIGATION CANAL TO BURIED PRESSURIZED PIPELINEINSTALL MAINLINE PIPELINE, FITTINGS, AND ASSOCIATED CONVEYANCE INFRASTRUCTUREINSTALL TURNOUT STRUCTURES TO CONTINUE DELIVERY SERVICE TO IRRIGATORS ALONG THE PIPELINE ALIGNMENTINSTALL CONTROL VALVES AND REGULATION STRUCTURES TO IMPROVE OPERATIONAL MANAGEMENT OF THE SYSTEMDECOMMISSION OR REMOVE PORTIONS OF THE EXISTING CANAL WHERE APPROPRIATERESTORE DISTURBED AREAS ALONG THE PIPELINE CORRIDOR FOLLOWING CONSTRUCTIONPROVIDE ENGINEERING, SURVEYING, DESIGN, CONSTRUCTION MANAGEMENT, AND INSPECTION SERVICESEXPECTED DELIVERABLES OR OUTCOMES: THE EXISTING OPEN CANAL SYSTEM IS SUBJECT TO SEEPAGE LOSS, VEGETATION GROWTH, AND OPERATIONAL SPILL THAT REDUCE OVERALL DELIVERY EFFICIENCY. CONVERTING THE CANAL TO A PRESSURIZED PIPELINE WILL SIGNIFICANTLY REDUCE CONVEYANCE LOSSES AND IMPROVE WATER MANAGEMENT WITHIN THE SYSTEM. WATER CONSERVED THROUGH REDUCED SEEPAGE AND OPERATIONAL LOSS CAN REMAIN IN THE BASIN, SUPPORTING AGRICULTURAL RELIABILITY AND BROADER BASIN WATER MANAGEMENT OBJECTIVES. PIPELINE INFRASTRUCTURE ALSO IMPROVES OPERATIONAL CONTROL, REDUCES LONG-TERM MAINTENANCE DEMANDS, AND INCREASES SYSTEM RESILIENCY DURING DROUGHT CONDITIONS. MODERNIZATION OF AGING IRRIGATION INFRASTRUCTURE IS A PRACTICAL AND PROVEN APPROACH TO IMPROVING WATER CONSERVATION AND SUSTAINING RELIABLE AGRICULTURAL PRODUCTION IN THE BASIN.INTENDED BENEFICIARIES: RESIDENTS OF THE TUMALO IRRIGATION DISTRICTSUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD):

Grant · Bureau of Reclamation · to Tumalo Irrigation District (UEI UCNEKQCURVW7) · data as of 2026-11-14

Obligated to date$8.40M1 action
Period2026-07-29 → 2026-07-29first to last action

What it is

Program
Fish and Wildlife Coordination Act (Assistance Listing 15.517)
Where the work is
Deschutes, OR

Obligations by fiscal year

FY2026$8.40M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subrecipients: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

1 action since 2026-07-29. Each is a modification or amendment with the money it added or took back.

DateAmendmentKindAmountWhat the agency wrote
2026-07-29ORIGNew award$8.40MAWARD PURPOSE: THIS PROJECT WILL CONVERT APPROXIMATELY 54,351 LINEAR FEET OF OPEN EARTHEN IRRIGATION CANAL TO A BURIED PRESSURIZED PIPELINE SYSTEM. THE EXISTING CANAL EXPERIENCES SIGNIFICANT SEEPAGE LOSS, OPERATIONAL INEFFICIENCIES, AND ONGOING MAINTENANCE…

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-14). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗