SC-90-X257↗
Central Midlands Council of Governments received this grant or assistance award from Federal Transit Administration: $0 obligated so far for federal transit formula grants. Its latest action was on 2025-12-18.
Key facts · data as of Nov 20, 2026
- Recipient
- Central Midlands Council of Governments
- Awarding agency
- Federal Transit Administration (Department of Transportation)
- Obligated to date
- $0
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Nov 20, 2026.
Cite this page: SpendQuery, Award SC-90-X257, data as of Nov 20, 2026, https://spendquery.com/award?id=ASST_NON_SC-90-X257_069
Central Midlands Council of Governments: all federal awards · Department of Transportation: spending
FY 2009 SECTION 5307 FUNDS $4019704FUNDS REQUESTED: $1817734**RTA APPLIED FOR BALANCE. SEE ATTACHED LETTER.THIS APPLICATION WILL INCLUDE THE CONSTRUCTION OF SIDEWALKS TO ACCESS TRANSIT STOPS IN DOWNTOWN COLUMBIA. THE THREE CORRIDORS THAT WILL BE IMPACTED BY THIS PROJECT INCLUDE ASSEMBLY STREET GREENE STREET AND BLUFF ROAD. ALL THREE CORRIDORS HAVE MULTIPLE TRANSIT STOPS AND WILL PROVIDE A SAFER AND MORE ACCESSIBLE WAY TO ACCESS THE CMRTA TRANSIT SYSTEM.ASSEMBLY STREET AND GREENE STREET SIDEWALKSTHE PROJECT WILL INCLUDE SIDEWALKS ALONG ASSEMBLY STREET FROM PENDLETON STREET TO BLOSSOM STREET AND ON GREENE STREET FROM MAIN STREET TO ASSEMBLY STREET. THE EXISTING SIDEWALKS ALONG THE PROJECT CORRIDOR OF ASSEMBLY AND GREENE STREETS ARE ESTIMATED TO BE MORE THAN 20 YEARS OLD. THIS PROJECT INCLUDES ALL THE SIDEWALK REPLACEMENTS (REMOVAL OF EXISTING CURB AND SIDEWALK) MINOR ROADWAY PATCHING AT THE NEW CURB AND IMPROVED ADA ACCESSIBILITY AND MOBILITY ALONG THE PROJECT CORRIDOR. THIS PROJECT ALSO INCLUDES REPLACEMENT OF EXISTING STAIRS ADJACENT TO THE CHURCH WITH RAILING AND THE CONSTRUCTION OF THE REFUGE AREAS IN THE MEDIAN. SO THAT THE SIDEWALK CAN BE REPLACED DRAINAGE ITEMS ASSOCIATED WITH THE SIDEWALK REPLACEMENT AND THE UTILITY COST OF RESETTING EXISTING POLES ARE ALSO INCLUDED IN THIS PROJECT.BLUFF ROAD SIDEWALKSTHIS PROJECT WILL ALSO INCLUDE A SIDEWALK ALONG BLUFF ROAD STARTING ALONG ROSEWOOD DRIVE AND CONTINUING TO GEORGE ROGER BLVD. CURRENTLY BUS STOP 644 OF LOCATED IN A DITCH AND THERE IS NO EXISTING SIDEWALK TO ACCESS IT. BUS RIDERS HAVE TO WALK ALONG A BUSY ROADWAY TO GAIN ACCESS TO THIS STOP. THIS PROJECT WILL INCLUDED THE INSTALLATION OF A 10 FOOT WIDE SIDEWALK THAT IS APPROXIMATELY 2500 FEET IN LENGTH. THIS PROJECT WILL ALSO INCLUDE CURB AND GUTTER DRAINAGE CONCRETE SIDEWALK CROSSWALKS AND PEDESTRIAN BUTTONS. THIS PROJECT IS LOCATED NEAR A LOW TO MODERATE INCOME AREA WHERE MORE THAN 24% OF THE FAMILIES ARE BELOW THE POVERTY LINE. CENSUS DATA ALSO SHOWS THAT APPROXIMATELY 12% OF THE HOUSEHOLDS IN THIS AREA DO NOT OWN A VEHICLE. THE PURPOSE OF THIS PROJECT IS TO ENHANCE SAFETY AND SECURITY IN ACCESSING THE BUS STOPS ALONG THIS CORRIDOR.
What it is
- Program
- Federal Transit Formula Grants (Assistance Listing 20.507)
- Where the work is
- SC
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subrecipients: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
1 action since 2025-12-18. Each is a modification or amendment with the money it added or took back.
| Date | Amendment | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-12-18 | 1 | Continuation | $0 | FY 2009 SECTION 5307 FUNDS $4019704FUNDS REQUESTED: $1817734**RTA APPLIED FOR BALANCE. SEE ATTACHED LETTER.THIS APPLICATION WILL INCLUDE THE CONSTRUCTION OF SIDEWALKS TO ACCESS TRANSIT STOPS IN DOWNTOWN COLUMBIA. THE THREE CORRIDORS THAT WILL BE IMPACTED BY… |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-11-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗