DEVELOPMENTAL TEST AIRCRAFT VIABILITY
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
209 subawards totaling $92.52M (126.4% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Moog Inc | $14.62M | 12 | CA, NY | 2023-06-01 | 2024-12-01 |
| Rockwell Collins Australia Pty Limited | $13.03M | 19 | CA, CT, IA, IL, TX | 2024-04-01 | 2024-12-01 |
| Northrop Grumman Corporation | $12.16M | 39 | CA, IL, MD | 2022-12-01 | 2025-02-01 |
| L3Harris Technologies, Inc | $7.88M | 16 | FL, GA, NY | 2023-07-01 | 2024-12-01 |
| Northrop Grumman Systems Corporation | $6.98M | 8 | CA | 2024-02-01 | 2024-10-01 |
| Compagnie De Developpement De L'Eau S.A. | $5.89M | 12 | NH | 2024-05-01 | 2024-11-01 |
| General Electric Company | $5.71M | 6 | 2024-01-01 | 2024-09-01 | |
| Purolator Facet, Inc. | $5.61M | 10 | CA, NY | 2024-02-01 | 2024-12-01 |
| Resideo Technologies, Inc. | $3.32M | 5 | IN | 2024-09-01 | 2024-09-01 |
| Marvin Engineering Co, Inc | $2.98M | 2 | CA | 2024-09-01 |
25 actions since 2022-11-01. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-01 | 46 | Administrative change | -$0 | ADMINISTRATIVE UPDATES |
| 2026-05-22 | 45 | Administrative change | $2.32M | THE PURPOSE OF THIS MODIFICATION IS TO AWARD PIF FOR DTV. |
| 2026-05-07 | 44 | Funding only | $5.56M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS AND AWARD PIF ON CLIN 1000. |
| 2026-02-10 | 43 | Administrative change | $4.61M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS. |
| 2026-01-14 | 42 | Administrative change | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP FOR CLINS 0002, 0006, 0103, AND 9999. |
| 2025-12-31 | 41 | Funding only | $4.65M | ADDITIONAL INCREMENTAL FUNDING |
| 2025-10-15 | 40 | Funding only | $3.81M | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN 0005 AND 0009 |
| 2025-08-19 | 39 | Funding only | $562.5K | INCREMENTAL FUNDING |
| 2025-08-18 | 38 | Funding only | $1.52M | PIF FUNDING AND INCREMENTAL FUNDING. |
| 2025-07-29 | 37 | Funding only | -$38.2K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE CLIN 0001 CANCELING FUNDS. |
| 2025-06-13 | 36 | Administrative change | $0 | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING, AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |
| 2025-06-09 | 35 | Administrative change | $0 |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| 2024-09-01 |
| RTX Corp | $2.76M | 8 | IL, TX | 2023-02-01 | 2023-11-01 |
| Goodrich Corporation | $2.23M | 2 | TX | 2024-01-01 | 2024-04-01 |
| Pip Manufacturing, Inc. | $1.58M | 4 | AZ, FL | 2024-05-01 | 2024-09-01 |
| Ball Corp | $1.56M | 7 | CO | 2023-06-01 | 2025-02-01 |
| Hamilton Sundstrand Corporation | $1.56M | 6 | IL | 2023-02-01 | 2024-09-01 |
| Collins Custom Manufacturing LLC | $1.11M | 1 | TX | 2023-01-01 | 2023-01-01 |
| GE Aviation Systems LLC | $909.0K | 3 | MI | 2024-09-01 | 2024-09-01 |
| Curtiss-Wright Corporation | $832.9K | 2 | PA | 2022-11-01 | 2023-02-01 |
| Honeywell International Inc. | $785.2K | 7 | AZ, CA, IN | 2022-11-01 | 2023-07-01 |
| RBC Bearings Incorporated | $338.8K | 3 | AZ | 2023-01-01 | 2024-09-01 |
| Astronics Corporation | $307.3K | 6 | NY | 2023-06-01 | 2024-09-01 |
| Carich Enterprises, Inc. | $236.7K | 1 | CA | 2024-09-01 | 2024-09-01 |
| Bae Systems PLC | $226.9K | 4 | 2023-02-01 | 2023-11-01 |
| General Dynamics Corp | $225.2K | 1 | VA | 2024-09-01 | 2024-09-01 |
| Forrest Machining LLC | $107.2K | 1 | CA | 2024-09-01 | 2024-09-01 |
The 25 largest of 41; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2024-09-01 | Moog Inc | $7.29M | ACTUATOR ELECT ELECTRONIC UNIT LEADING EU FLAPERON/HT C50 EU-LEADING EDGE FLAP A/B EU RUD C500 CV FLAPERON ACTUATOR EHA LH ACTUATOR RUDDER RH ACTUATOR RUDDER EHA |
| 2024-09-01 | Goodrich Corporation | $6.31M | ASSY CTOL MLG - LHS ASSY CTOL MLG - RHS ASSY STOVL MLG - LHS MLG ASSY - LH CV MLG ASSY - RH CV |
| 2024-09-01 | Northrop Grumman Systems Corporation | $4.48M | AASU-AFT APERTURE SWITCH ACE - AUDIO CONTROL ELEC CAIC - AVIONICS INTERFAC FASU - FORWARD APERTURE SWITCH UNIT INPA - INTERROGATOR POWE LBPA - L-BAND POWER AMPLIFIER RALT - RADAR ALTIMETER UVPA - UHF/VHF POWER AMP |
| 2024-09-01 | Moog Inc | $3.79M | ACTUATOR ELECT ELECTRONIC UNIT LEADING EU RUD C500 CV FLAPERON ACTUATOR EHA RH ACTUATOR RUDDER EHA |
| 2024-09-01 | Northrop Grumman Systems Corporation | $3.71M | AN/AAQ-37 EO DAS SENSOR |
| 2024-09-01 | GE Aviation Systems Limited | $3.62M | EDU NO. 2 LOT 13 EDU NO. 2 LOT 14 ICD EDU NO.1 LOT 13 ICD EDU NO.1 LOT 14 |
| 2024-09-01 | Hamilton Sundstrand Corporation | $2.96M | SYNCH ICC |
| 2024-09-01 | Marvin Engineering Co, Inc | $2.91M | 1OOSE PARTS KIT CTOL/ST LAU-151/A - RAIL LAUNCHE LAU-151/A RAIL LAUNCHER LOOSE AME HARDWARE KIT LOOSE HARDWARE ADAPTER SUU-96/A PYLON |
| 2024-09-01 | Parker-Hannifin Corporation | $2.87M | ACTUATOR RUDDER CTOL/ST EHA HORIZONTAL TAIL |
| 2023-12-01 | Moog Inc | $2.51M | ACTUATOR EHA FLAPERON EU-LEADING EDGE FLAP A/B |
| 2024-09-01 | L3Harris Technologies, Inc. | $2.33M | PCD-DIPLAY UNIT FLYABLE |
| 2024-04-01 | Goodrich Corporation | $2.27M | NOSE LANDING GEAR ASSY |
| 2024-09-01 | Bae Systems Information and Electronic Systems Integration Inc. | $2.24M | APERTURE BAND 2 FWD APERTURE BAND 3/4 APERTURE ELECTRONICS DISPENSER IRCM (CI-8) MODULE DCR/TG |
| 2023-10-01 | Northrop Grumman Systems Corporation | $2.07M | DCTR - FWT PLANT INPS - FWT PLANT LBPS - L11 PLANT MCR - FWT PLANT TFR - FWT PLANT |
| 2024-09-01 | Bae Systems Information and Electronic Systems Integration Inc. | $1.83M | ADC CLOCK MODULE APERTURE BAND 3/4 APERTURE ELECTRONICS DISPENSER IRCM (CI-8) MODULE CONTROLLER MODULE CONVERTER RF MODULE SWITCH WIRING HARNESS OPTICAL |
| 2024-09-01 | GE Aviation Systems Limited | $1.79M | EDU NO. 2 - YEAR 1 EDU NO. 2 - YEAR 2 ICD EDU NO.1 - YEAR 1 ICD EDU NO.1 - YEAR 2 |
| 2024-09-01 | Honeywell International Inc. | $1.63M | ASSY MAIN BRAKE CTOL ASSY MAIN BRAKE CV BRAKE ASSY MLG-STOVL BRAKE PRESSURE SENSOR HUB CAP ASSY HUB CAP MAIN WHEEL ASSEMBLY NLG WHEEL/TIRE ASSY CV NOSE WHEEL & TIRE ASSY TRANSDUCER WHEEL SPEED WHEEL/TIRE ASSY LMLG |
| 2024-09-01 | Honeywell International Inc. | $1.48M | TURBO MACHINE ASSY |
| 2024-09-01 | Raytheon Company | $1.46M | GLOBAL POSITION UNIT *MP3* ANTENNA GPS |
| 2024-09-01 | Northrop Grumman Systems Corporation | $1.41M | RACK EW 2A DTIP RACK EW 2B DTIP |
| 2024-09-01 | Hamilton Sundstrand Corporation | $1.39M | SYNCHRONOUS ES/G |
| 2024-09-01 | Parker-Hannifin Corporation | $1.35M | ELECTRONICS UNIT F ELECTRONICS UNIT R ELECTRONICS UNIT R LI30 |
| 2024-10-01 | Northrop Grumman Systems Corporation | $1.26M | AAA - ANTENNA ARRAY ASSEMBLY AASU-AFT APERTURE SWITCH CAIC - AVIONICS INTERFAC |
| 2024-09-01 | Northrop Grumman Systems Corporation | $1.25M | RACK CNI 3A RACK RACK EW 2B DTIP |
| 2023-02-01 | Hamilton Sundstrand Corporation | $1.23M | SYNCHRONOUS ES/G |
| THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE PARTNERS ACRNS FOR CLINS 0005, 0006, 0007, 0009, AND 0101 |
| 2025-06-02 | 34 | Funding only | -$1.52M | DEOBLIGATION OF FUNDS |
| 2025-04-30 | 33 | Administrative change | $0 | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING, AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |
| 2024-12-20 | 32 | Change order | $11.62M | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |
| 2024-12-12 | 31 | Funding only | $185.7K | UPDATE PARAGRAPH 5.2.8 OF THE SOW AND TO PERMIT THE PROCURMENT OF STRAIN GAUGES PARTS AND TO ADD CLIN0012 |
| 2024-08-22 | 30 | Supplemental agreement (work within scope) | $4.86M | DEVELOPMENTAL TEST VIABILITY (DTV). THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE DTV PART B UCA. |
| 2024-03-06 | 29 | Funding only | -$1.63M | F-35 DEVELOPMENTAL TEST VIABILITY (DTV). THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND AND DEOBLIGATE EXCESS FUNDS. |
| 2023-12-12 | 28 | Administrative change | -$5.00M | ENGINEERING AND MODIFICATIONS TO MAINTAIN VIABILITY OF F-35 DEVELOPMENTAL TEST AIRCRAFT. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING FROM CLINS 0004, 0005, 0006, 0007, 0009, 0101, AND 0103 TO CORRECT THE LOA. A RE-OBLIGATION MODIFICATION WILL… |
| 2023-08-29 | 27 | Change order | $0 | ENGINEERING, PARTS PROCUREMENT AND AIRCRAFT MODIFICATION EXECUTION REQUIRED TO CONTINUE TO UTILIZE EXISTING F-35 DEVELOPMENTAL TEST AIRCRAFT FOR FOLLOW-ON-MODERNIZATION. |
| 2023-08-11 | 26 | Funding only | $6.10M | DEVELOPMENTAL TEST VIABILITY. THE PURPOSE IS TO ADD CLIN 0010 UNDER THE DTV B UCA, FUND CLIN 0010, CORRECT SECTION B ERRORS, AND UPDATE THE SOW/OTHER CONTRACTUAL TERMS. |
| 2023-03-22 | 25 | Funding only | $26.63M | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING, AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |
| 2023-03-15 | 24 | Change order | $0 | THIS ORDER PROVIDES THE ENGINEERING, PARTS, AND MODIFICATION LABOR TO ENSURE CONTINUED VIABILITY OF THE F-35 DEVELOPMENTAL TEST (DT) AIRCRAFT. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER TO MODIFY DT AIRCRAFT TO THE TECH REFRESH 3… |
| 2022-11-02 | 23 | Funding only | $9.34M | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING, AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |
| 2022-11-01 | 22 | Funding only | -$361.0K | THIS DELIVERY ORDER REQUIRES THE NON-RECURRING ENGINEERING, PLANNING, AND KITTING NECESSARY TO MODIFY THE F-35 DEVELOPMENTAL TEST AIRCRAFT TO ENSURE THEIR CONTINUED VIABILITY. |