REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN
Up for re-bid: ends 2026-12-18. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
10 actions since 2026-01-30. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-16 | P00009 | Supplemental agreement (work within scope) | -$66.1K | THE PURPOSE OF THIS MODIFICATION IS TO ADD LINE ITEM 00190 TO CHANGE THE FOUNTAIN TILE SELECTION TO DISCOVERY. |
| 2026-07-15 | P00008 | Supplemental agreement (work within scope) | $5.3K | THE PURPOSE OF THIS MODIFICATION IS TO ADD LINE ITEM 00190 TO CHANGE THE FOUNTAIN TILE SELECTION TO DISCOVERY. |
| 2026-06-18 | P00007 | Supplemental agreement (work within scope) | $6.7K | THE PURPOSE OF THIS MODIFICATION IS ADD LINE ITEM 00180 TO INSTALL SKATEBOARD DETERRENTS. |
| 2026-05-27 | P00006 | Supplemental agreement (work within scope) | -$9.4K | THE PURPOSE OF THIS MODIFICATION IS TO CANCEL LINE ITEM 00150 FOR THE SEA CONTAINER RELOCATION. |
| 2026-04-27 | P00005 | Supplemental agreement (work within scope) | -$163.5K | MODIFICATION P00005 IS BEING ISSUED TO DE-OBLIGATE FUNDING FOR THE DEMOLITION OF CONCRETE BEDDING, AS IT WAS DISCOVERED AFTER THE ORIGINAL CONTRACT AWARD THAT CERTAIN CONCRETE BEDS AT THE SITE DID NOT REQUIRE DEMOLITION PREVIOUSLY ANTICIPATED. THE |
| 2026-04-07 | P00004 | Supplemental agreement (work within scope) | $40.4K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND INCIDENTALS NECESSARY TO FURNISH AND INSTALL REPLACEMENT PRECAST CONCRETE BENCH SEAT COMPONENTS, INCLUDING THE REMOVAL AND DISPOSAL OF DETERIORATED BENCH SEATS (AS REQUIRE |
| 2026-04-01 | P00003 | Supplemental agreement (work within scope) | $9.4K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND INCIDENTALS NECESSARY TO RELOCATE THE EXISTING C-CONTAINER AS REQUIRED TO MAINTAIN A CLEAR DDOT CRITICAL ROOT ZONE PATH AND SUPPORT ONGOING CONSTRUCTION SEQUENCING. THIS |
| 2026-03-26 | P00002 | Supplemental agreement (work within scope) | $58.3K | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |
| 2026-02-27 | P00001 | Administrative change | $0 | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |
| 2026-01-30 | 0 | $5.38M | REMOVAL AND REPLACEMENT OF MARBLE PAVING AND CONCRETE BASE AT THE NORTH AND SOUTH STREET-LEVEL APPROACHES WITHIN SIMON BOLIVAR PARK; REMOVAL AND REPLACEMENT OF MARBLE PAVING AT RAISED PLAZA; CLEANING, REPAIR, AND REPAINTING OF EXISTING POST-AND-CHAIN |