THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO PERFORM INITIAL WELL INSPECTIONS, WELL `MAKE SAFE' OPERATIONS, WELL DIAGNOSTIC TESTING, WELL DECOMMISSIONING, AND METHANE EMISSION ASSESSMENTS (PRE AND PO
Up for re-bid: ends 2027-03-17. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
6 actions since 2026-03-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-08-24 | P00005 | Supplemental agreement (work within scope) | $6.74M | ADD USE OF CTUS FOR ST27 D-9, ST27 D-10, AND ST67 B43 AND EXERCISE OPTIONS FOR UPPER ABANDONMENT. THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO ACCOMPLISH THE FOLLOWING: I. ALLOW PEC TO UTILIZE A COIL TUBING UNIT (CTU) TO COMPLETE THE DECO |
| 2026-07-08 | P00004 | Supplemental agreement (work within scope) | $328.0K | ADD DECOMMISSIONING OF GI23 #T49 WELL TO SCOPE OF WORK. THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO ADD THE DECOMMISSIONING OF ORPHAN WELL, GI-23 #T49, LOCATED IN THE GRAND ISLE BLOCK 23 AREA INTO THE SCOPE OF WORK. THIS WORK SHALL BE PERFO |
| 2026-06-04 | P00003 | Supplemental agreement (work within scope) | $452.8K | ADD DECOMMISSIONING OF ST21 #81 WELL TO SCOPE OF WORK. THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO ADD THE DECOMMISSIONING OF ORPHAN WELL, #81, LOCATED IN THE SOUTH TIMBALIER BLOCK 21 AREA INTO THE SCOPE OF WORK. THIS WORK SHALL BE PERFORME |
| 2026-05-29 | P00002 | Supplemental agreement (work within scope) | $2.42M | EXERCISE OPTION TO PERFORM UPPER ABANDONMENT OPERATIONS IN THE GRAND ISLE 22 AREA OF THE GULF OF AMERICA. THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO EXERCISE THE CLIN 40.1 0PTION TO PERFORM THE GRAND ISLE 22 WELL UPPER ABANDONMENT IN THE AM |
| 2026-04-24 | P00001 | Supplemental agreement (work within scope) | $740.1K | PERFORM WELL DECOMMISSIONING, ON THREE ADDITIONAL WELLS, IN THE SOUTH TIMBALIER (ST) AND GRAND ISLE (GI) AREAS OF THE GULF OF AMERICA OCS. THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO ADD THE DECOMMISSIONING OF THREE ORPHAN WELLS, D009, D010, |
| 2026-03-18 | 0 | $4.16M | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO PERFORM INITIAL WELL INSPECTIONS, WELL `MAKE SAFE' OPERATIONS, WELL DIAGNOSTIC TESTING, WELL DECOMMISSIONING, AND METHANE EMISSION ASSESSMENTS (PRE AND PO |