2032H823F00211↗

H2 Construction Inc received this contract from Operation Services, Internal Revenue Service: $2.53M obligated so far for repair or alteration of miscellaneous buildings. Its period of performance ended 2025-03-31.

Key facts · data as of Oct 25, 2026

Recipient
H2 Construction Inc
Awarding agency
Internal Revenue Service (Department of the Treasury)
Contracting office
Operation Services (2032H8)
Obligated to date
$2.53M
Potential value
$2.59M
Ends
2025-03-31

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award 2032H823F00211, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_2032H823F00211_2050_2032H823A00010_2050

THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL

Bpa Call · Internal Revenue Service · to H2 Construction Inc (UEI P1CQKGN9SFC5) · data as of 2026-10-25

Obligated to date$2.53M6 actions
Current value$2.59Mwith options exercised
Period2023-09-29 → 2025-03-31current end date

What it is

Product or service
Repair or Alteration of Miscellaneous Buildings (PSC Z2JZ)
Industry
Commercial and Institutional Building Construction (NAICS 236220)
Contracting office
Operation Services (2032H8)
Competition
Competed under simplified acquisition · 1 offer received
Set-aside
Small business
Pricing
Firm fixed price
How it was bought
Blanket purchase agreement (BPA) · under 2032H823A00010
Where the work is
Berkeley, WV · district WV-02

Obligations by fiscal year

FY2023$2.59M
FY2024$0
FY2025$0
FY2026-$56.6K

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.

Every action

6 actions since 2023-09-28. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2025-10-23P00005Administrative change-$56.6KREPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS (PDUS) AND INSTALL NEW PDUS AND REMOTE POWER PANELS; AND UPDATE THE EXISTING SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM AT IRS ECC MARTINSBURG WV. P00004 IS TO UPDATE THE FPDS DESCRIPTION FIELD.
2025-04-23P00004Administrative change$0REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS (PDUS) AND INSTALL NEW PDUS AND REMOTE POWER PANELS; AND UPDATE THE EXISTING SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM AT IRS ECC MARTINSBURG WV. P00004 IS TO UPDATE THE FPDS DESCRIPTION FIELD.
2025-03-04P00003Administrative change$0THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
2025-01-31P00002Administrative change$0THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
2024-09-27P00001Administrative change$0THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
2023-09-280$2.59MTHIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗