Applied Research Associates, Inc. received this contract from Gsa Fas Aas Fedsim, Federal Acquisition Service: $314.19M obligated so far for support- professional: engineering/technical. Its period of performance ended 2026-03-29.
Key facts · data as of Oct 25, 2026
- Recipient
- Applied Research Associates, Inc.
- Awarding agency
- Federal Acquisition Service (General Services Administration)
- Contracting office
- Gsa Fas Aas Fedsim (47QFCA)
- Obligated to date
- $314.19M
- Potential value
- $785.89M
- Ends
- 2026-03-29
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award 47QFCA20F0022, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_47QFCA20F0022_4732_GS00Q14OADU304_4732
Applied Research Associates, Inc.: all federal awards · General Services Administration: spending · Gsa Fas Aas Fedsim: what it buys
TASK ORDER AWARD
What it is
- Product or service
- Support- Professional: Engineering/Technical (PSC R425)
- Industry
- Engineering Services (NAICS 541330)
- Funded by
- Department of Defense
- Contracting office
- Gsa Fas Aas Fedsim (47QFCA)
- Competition
- Full and open competition · 2 offers received
- Pricing
- Cost plus award fee
- How it was bought
- Multiple-award IDIQ · under OASIS (GS00Q14OADU304)
- Solicitation
- 47QFCA20R0022
- Where the work is
- Hillsborough, FL · district FL-14
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
183 subawards totaling $169.62M (54.0% of what was obligated), as Applied Research Associates, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Ampsight, Inc. | $19.25M | 3 | VA | 2024-06-17 | 2026-02-02 |
| Trevity LLC | $10.28M | 6 | VA | 2023-06-23 | 2025-12-08 |
| Royce Geospatial Consultants, LLC | $8.67M | 4 | VA | 2023-01-20 | 2023-10-02 |
| 3Gimbals LLC | $7.91M | 4 | FL | 2024-10-04 | 2025-07-28 |
| RTX BBN Technologies, Inc. | $7.57M | 2 | MA | 2023-09-28 | 2023-09-29 |
| Turbineone Inc | $7.50M | 2 | CA | 2023-03-14 | 2024-09-30 |
| Concurrent Technologies Corp | $7.46M | 7 | PA | 2023-03-01 | 2025-07-14 |
| Wintec Arrowmaker, Inc. | $6.20M | 1 | MD | 2023-11-29 | 2023-11-29 |
| Riverside Research Institute | $5.08M | 7 | VA | 2023-06-06 | 2025-12-19 |
| North Dakota University System | $4.75M | 1 | ND | 2024-03-01 | 2024-03-01 |
| KBR Wyle Services, LLC | $4.52M | 1 | TX | 2023-09-25 | 2023-09-25 |
| Polaris, Inc | $4.49M | 3 | MN | 2023-11-25 | 2024-12-18 |
| Two Six Labs Holdings, Inc. | $3.98M | 2 | VA | 2023-02-17 | 2023-12-13 |
| Creative Microsystems Corporation | $3.79M | 5 | VT | 2022-11-14 | 2025-02-05 |
| Martinfederal Consulting, LLC | $3.72M | 2 | AL | 2023-08-04 | 2023-10-02 |
| Newbridge Partners, Inc. | $3.69M | 2 | VA | 2023-05-01 | 2025-04-25 |
| The Charles Stark Draper Laboratory, Inc. | $3.61M | 3 | MA | 2022-10-16 | 2023-08-22 |
| Foundation Stack Ai Inc | $3.41M | 4 | VA | 2025-08-26 | 2026-02-26 |
| Aforge LLC | $3.09M | 10 | VA | 2023-03-31 | 2025-08-27 |
| Earthdaily Federal, Inc. | $2.82M | 2 | NM | 2023-05-05 | 2024-09-30 |
| Awetomaton LTD | $2.53M | 4 | OH | 2023-10-02 | 2025-10-01 |
| Msi Defense Solutions LLC | $2.53M | 1 | NC | 2023-11-01 | 2023-11-01 |
| Clemson University | $2.51M | 1 | SC | 2024-11-26 | 2024-11-26 |
| Cubic Digital Solutions LLC | $2.34M | 4 | VA | 2023-03-23 | 2023-11-09 |
| Toffler Associates, Inc. | $1.94M | 4 | VA | 2023-05-21 | 2024-07-08 |
The 25 largest of 102; the rest are on USAspending.gov.
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2024-06-17 | Ampsight, Inc. | $18.82M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-08-21 | Trevity LLC | $6.65M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-11-29 | Wintec Arrowmaker, Inc. | $6.20M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-03-01 | Concurrent Technologies Corp | $5.34M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-03-14 | Turbineone Inc | $5.00M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-01-20 | Royce Geospatial Consultants, LLC | $4.76M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-03-01 | University of North Dakota | $4.75M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-09-25 | KBR Wyle Services, LLC | $4.52M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-09-28 | RTX BBN Technologies, Inc. | $4.39M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-10-04 | 3Gimbals LLC | $3.91M | SUBSCRIPTION FOR IT SERVICES AND SOFTWARE REQUIRED FOR THE PROJECT. |
| 2023-10-02 | Royce Geospatial Consultants, LLC | $3.32M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-09-29 | RTX BBN Technologies, Inc. | $3.18M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-12-13 | Two Six Labs, LLC | $3.11M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-08-04 | Martinfederal Consulting, LLC | $2.95M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-12-18 | Polaris Sales Inc | $2.80M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-11-01 | Msi Defense Solutions LLC | $2.53M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-11-26 | Clemson University | $2.51M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-09-30 | Turbineone Inc | $2.50M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-03-23 | Cubic Digital Solutions LLC | $2.16M | LEASES FOR IT EQUIPMENT REQUIRED FOR THE PROJECT. |
| 2023-05-01 | Newbridge Partners, Inc. | $2.15M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-08-01 | Creative Microsystems Corporation | $2.00M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2023-05-30 | Aforge LLC | $1.92M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-03-01 | Riverside Research Institute | $1.89M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2024-12-12 | Iavo Research and Scientific, Incorporated | $1.87M | PROVIDE PERSONNEL, MATERIALS, FACILITIES AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
| 2025-12-08 | Trevity LLC | $1.83M | PROVIDE PERSONNEL, MATERIALS, FACILITIES, AND MANAGEMENT AS REQUIRED TO COMPLETE TASKS IN SUPPORT OF THE CONTRACT SOW. |
Every action
46 actions since 2022-12-02. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-05-26 | P00068 | Funding only | -$2.06M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2026-03-20 | P00067 | Supplemental agreement (work within scope) | -$13.40M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2026-02-03 | P00066 | Supplemental agreement (work within scope) | $2.72M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2026-01-28 | P00065 | Funding only | $10.22M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2026-01-14 | P00064 | Funding only | $9.73M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-12-17 | P00063 | Funding only | $485.4K | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-11-06 | P00062 | Funding only | $1.32M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-10-23 | P00061 | Funding only | -$294.9K | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-09-26 | P00060 | Supplemental agreement (work within scope) | $5.09M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-09-08 | P00059 | Supplemental agreement (work within scope) | $29.90M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-08-08 | P00058 | Supplemental agreement (work within scope) | $4.11M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-07-02 | P00057 | Funding only | $7.21M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-06-12 | P00056 | Supplemental agreement (work within scope) | $1.93M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-05-12 | P00055 | Supplemental agreement (work within scope) | $3.77M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-04-14 | P00054 | Supplemental agreement (work within scope) | $10.19M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-03-10 | P00053 | Funding only | $4.86M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-02-12 | P00052 | Supplemental agreement (work within scope) | $11.64M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2025-01-08 | P00051 | Funding only | $4.10M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-12-04 | P00050 | Funding only | $11.03M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-11-12 | P00049 | Supplemental agreement (work within scope) | $7.64M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-09-27 | P00048 | Funding only | $760.5K | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-09-25 | P00047 | Supplemental agreement (work within scope) | $2.56M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-09-18 | P00046 | Supplemental agreement (work within scope) | $17.72M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-09-04 | P00045 | Option exercised | $31.49M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-07-30 | P00044 | Supplemental agreement (work within scope) | $2.34M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-06-13 | P00043 | Supplemental agreement (work within scope) | $5.90M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-05-09 | P00042 | Funding only | $2.08M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-04-22 | P00041 | Supplemental agreement (work within scope) | $495.9K | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-04-03 | P00040 | Supplemental agreement (work within scope) | $5.44M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-03-12 | P00039 | Supplemental agreement (work within scope) | $6.52M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2024-02-12 | P00038 | Supplemental agreement (work within scope) | $8.42M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-12-18 | P00037 | Change order | $2.01M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-11-17 | P00036 | Supplemental agreement (work within scope) | $2.33M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-09-27 | P00035 | Supplemental agreement (work within scope) | $268.1K | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-09-25 | P00034 | Option exercised | $15.76M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-09-07 | P00033 | Option exercised | $6.26M | MISSION AWARENESS CAPABILITIES RAMPUP AND OPTIMIZATION MACRO |
| 2023-08-02 | P00032 | Option exercised | $40.56M | OPTION EXERCISE FOR TASK ORDER 47QFCA20F0022 |
| 2023-07-10 | P00031 | Supplemental agreement (work within scope) | $19.50M | FUNDING AND ADMINISTRATIVE MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2023-06-05 | P00030 | Funding only | $2.97M | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022. |
| 2023-05-04 | P00029 | Funding only | $9.10M | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2023-03-13 | P00028 | Funding only | $15.18M | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2023-03-01 | P00027 | Funding only | $242.7K | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2023-01-26 | P00026 | Funding only | $4.70M | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2023-01-05 | P00025 | Funding only | $310.7K | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2022-12-16 | P00024 | Administrative change | $0 | ADMINISTRATIVE MODIFICATION FOR TASK ORDER 47QFCA20F0022 |
| 2022-12-02 | P00023 | Funding only | $1.09M | FUNDING MODIFICATION FOR TASK ORDER 47QFCA20F0022 |