| 2024-10-10 | Lyme Computer Systems, Inc. | $630.3K | DELL MEDIA AND CABLE |
| 2023-10-23 | Lyme Computer Systems, Inc. | $468.5K | ELECTRICAL COMPONENTS |
| 2022-11-23 | Daktronics, Inc. | $285.4K | DIGITAL SIGN PARTS |
| 2024-10-09 | Lyme Computer Systems, Inc. | $234.8K | HARDWARE ACCESSORIES |
| 2023-07-31 | Elite Technical Services Inc | $147.5K | SUPPORT AND MAINTAIN LICENSE PLATE READERS (LPR) EQUIPMENT AT ALL LEGACY PORTS OF ENTRY (POE) AND BORDER PATROL (BP) LOCATIONS. |
| 2023-10-27 | Lyme Computer Systems, Inc. | $135.3K | IT COMPONENTS |
| 2024-08-23 | Lyme Computer Systems, Inc. | $128.8K | VERSALOGIC HARDWARE |
| 2023-10-04 | S2 Global Inc | $113.5K | "INTEGRATE NII LANE HEATH STATUS AND ALERTS INTO THE CBP LBI DASHBOARD, GENERATE TICKETS IN CBP SERVICENOW, AND UPDATE PROCESS FLOWS TO MORE QUICKLY ADDRESS ISSUES AFFECTING THE AVAILABILITY OR PERFORMANCE OF NII… |
| 2023-03-30 | Hartfiel Automation Sa LLC | $94.5K | BANNER RADAR SENSOR, CABLE AND BRACKET |
| 2022-12-21 | Tomcat Engineering Unlimited LLC | $81.8K | THIS SUBCONTRACT IS IN SUPPORT OF THE CUSTOMS AND BORDER PATROL WORK BEING DONE AT POINTS OF ENTRY INTO THE UNITED STATES. UPGRADES TO EQUIPMENT ARE BEING INSTALLED AT THE LANES ENTERING THE UNITED STATES FOR ADDED… |
| 2023-08-23 | Ac DC Inc | $80.5K | "ELECTRICAL SERVICES TO COMPLETE THE NECESSARY SITE PREPARATION TASKS AND ASSIST WITH THE INSTALLATION OF NEW LPR AND RFID EQUIPMENT FOR LANE 7 AT BORDER PATROLS CHECKPOINT 29. CHECKPOINT 29 IS LOCATED APPROXIMATELY 30… |
| 2023-02-10 | Daktronics, Inc. | $80.0K | PLATINUM SERVICES DAKTRONICS SERVICES |
| 2023-10-17 | Fortress Government Solutions, LLC | $79.2K | FORTRESS TAA COMPLIANCE HW |
| 2025-06-13 | Ac DC Inc | $67.8K | SERVICES TO SUPPORT THE INSTALLATION OF A TOTAL OF 31 LICENSE PLATE READER (LPR) LANES AT THIS NEWLY CONSTRUCTED CROSSING BETWEEN THE UNITED STATES AND CANADA DESIGNATED AS GORDIE HOWE INTERNATIONAL BRIDGE (GHIB). |
| 2022-11-23 | Daktronics, Inc. | $58.4K | DIGITAL SIGN PARTS |
| 2023-10-10 | Uk Electric LLC | $58.3K | ELECTRICAL SERVICES TO COMPLETE SITE PREPARATION TASKS AND ASSIST WITH THE UPGRADE OF THREE OUTBOUND GANTRY LANES AT THE OTAY MESA PORT OF ENTRY LOCATED IN SAN DIEGO, CA.
SEE CORNERSTONE FOR CERT. |
| 2023-10-31 | BC Architects Engineers PLC | $53.0K | FULL A&E DESIGN DRAWINGS FOR VETERANS BRIDGE, BROWNSVILLE, TX AND DERBY LINE, VT FOR THE CUSTOMS AND BORDER PROTECTION |
| 2023-07-07 | Ac DC Inc | $52.1K | "ELECTRICAL SERVICES TO COMPLETE SITE PREPARATION TASKS AND ASSIST WITH THE UPGRADE OF TEN INBOUND LANES AT THE CHAMPLAIN PORT OF ENTRY LOCATED IN CHAMPLAIN, NY
SEE CORNERSTONE FOR CERT." |
| 2022-10-04 | Tomcat Engineering Unlimited LLC | $47.8K | THIS SUBCONTRACT IS IN SUPPORT OF THE CUSTOMS AND BORDER PATROL WORK BEING DONE AT POINTS OF ENTRY INTO THE UNITED STATES. UPGRADES TO EQUIPMENT ARE BEING INSTALLED AT THE LANES ENTERING THE UNITED STATES FOR ADDED… |
| 2023-10-23 | Ac DC Inc | $46.6K | "ELECTRICAL SERVICES TO COMPLETE SITE PREPARATION TASKS AND ASSIST WITH THE UPGRADE OF FOUR OUTBOUND GANTRY LANES AT THE STANTON STREET PORT OF ENTRY LOCATED IN EL PASO, TX.
SEE CORNERSTONE FOR CERT." |
| 2023-11-01 | Lyme Computer Systems, Inc. | $44.9K | COMPUTER HARDWARE ACCESORIES |
| 2024-05-10 | Ac DC Inc | $43.3K | ELECTRICAL SERVICES TO INSTALL OUR (3) THREE FLEX INBOUND DUALUSE LANES AND (1) ONE FLEX OUTBOUND LPR SOLUTION IN 4 (FOUR) NEWLY CONSTRUCTED LANES AT THE MADAWASKA PORT OF ENTRY IN MADAWASKA, ME |
| 2022-11-29 | Tomcat Engineering Unlimited LLC | $42.7K | THIS SUBCONTRACT IS IN SUPPORT OF THE CUSTOMS AND BORDER PATROL WORK BEING DONE AT POINTS OF ENTRY INTO THE UNITED STATES. UPGRADES TO EQUIPMENT ARE BEING INSTALLED AT THE LANES ENTERING THE UNITED STATES FOR ADDED… |
| 2023-02-16 | Insight Public Sector, Inc. | $39.1K | 0 |
| 2023-08-30 | Ac DC Inc | $38.3K | ELECTRICAL SERVICES TO COMPLETE SITE PREPARATION TASKS AND ASSIST WITH THE UPGRADE OF THREE INBOUND LANES AT THE JACKMAN PORT OF ENTRY LOCATED NEAR SANDY PORT TOWNSHIP, ME. |