Putting the award page together from the records…
Putting the award page together from the records…
REBUILD BASE DETACHMENT & AIR STATION BORINQUEN, AGUADILLA, PUERTO RICO, PHASE 2
Up for re-bid: ends 2028-02-26. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
21 subawards totaling $50.84M (384.6% of what was obligated), as Rq-Aecom 2 JV reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Lord Construction Group Inc | $40.02M | 1 | PR | 2022-10-14 | 2022-10-14 |
| Glasstra Group LLC | $3.79M | 1 | PR | 2023-03-22 | 2023-03-22 |
| JGR Eco-Logical Group, LLC | $1.77M | 2 | PR | 2023-08-15 | 2025-02-19 |
| Steel and Pipes Inc | $855.0K | 1 | PR | 2024-10-02 | 2024-10-02 |
| Alarm & Control System Co Inc | $725.9K | 1 | PR | 2025-03-04 | 2025-03-04 |
| Shadpour Consulting Engineers | $609.0K | 1 | CA | 2022-10-07 | 2022-10-07 |
| Alonso & Carus Iron Works Inc | $535.0K | 1 | PR | 2023-07-18 | 2023-07-18 |
| Styro Products, Inc. | $523.5K | 1 | GA | 2023-09-12 | 2023-09-12 |
| Macro Mix, LLC | $447.1K | 1 | PR | 2023-10-09 | 2023-10-09 |
| White Diamond Communications Inc | $423.5K | 1 | PR | 2026-02-17 | 2026-02-17 |
| Vivot Equipment PR, LLC | $250.0K | 1 | PR | 2024-12-03 | 2024-12-03 |
| Mckim, Ullrich & Young, L.L.P. | $196.9K | 1 | TX | 2024-06-18 | 2024-06-18 |
| Aguayo'S Sheet Metal MFG Inc | $180.8K | 1 | PR | 2025-04-25 | 2025-04-25 |
| Earth Engineers, Inc | $150.0K | 1 | PR | 2024-02-23 | 2024-02-23 |
| The Macomb Group, Inc | $112.6K | 2 | MI | 2024-01-18 | 2024-01-31 |
| Agl Construction Inc | $75.0K | 1 | PR | 2024-05-23 | 2024-05-23 |
| Mertz Enterprises, Inc | $74.9K | 1 | CA | 2023-11-02 | 2023-11-02 |
| Homeca Recycling Center Co. Inc. | $62.0K | 1 | PR | 2024-08-23 | 2024-08-23 |
| Schnabel, Inc. | $41.0K | 1 | SC | 2022-10-13 | 2022-10-13 |
| Date | To | Amount | For |
|---|---|---|---|
| 2022-10-14 | Lord Construction Group Inc | $40.02M | ELECTRICAL |
| 2023-03-22 | Glasstra Group LLC | $3.79M | ALUMINUM DOORS & FRAMES, ALUMINUM FRAMED STOREFRONTS, ALUMINUM WINDOWS, SERVIES & TELLER WINDOW UNITS, GLASS & GLAZING, LOUVERS |
| 2025-02-19 | JGR Eco-Logical Group, LLC | $1.65M | THERMOPLASTIC MEMBRANE ROOFING |
| 2024-10-02 | Steel and Pipes Inc | $855.0K | ALUMINUM CANOPIES |
| 2025-03-04 | Alarm & Control System Co., Inc. | $725.9K | DIRECT DIGITAL CONTROL SYSTEM FOR HVAC |
| 2022-10-07 | Shadpour Consulting Engineers | $609.0K | MECHANICAL & PLUMBING ENGINEER |
| 2023-07-18 | Alonso & Carus Iron Works Inc | $535.0K | STRUCTURAL STEEL (ACCESS/STAIRS/PV SUPPORT) |
| 2023-09-12 | Styro Products, Inc. | $523.5K | INSULDECK MATERIAL |
| 2023-10-09 | Macro Mix, LLC | $447.1K | PO DELIVERY - CAST-IN-PLACE CONCRETE & TILT-UP CONCRETE |
| 2026-02-17 | White Diamond Communications Inc | $423.5K | TEMPORARY POWER F CIRCLE - LUMA PLANS U/G DUCT BANK |
| 2024-12-03 | Vivot Equipment PR, LLC | $250.0K | RIGGING & LIFTING OF TILT-UP WALLS |
| 2024-06-18 | Mckim, Ullrich & Young, L.L.P. | $196.9K | ELECTRICAL EQUIPMENT |
| 2025-04-25 | Aguayo'S Sheet Metal MFG Inc | $180.8K | DUCTWORK FABRICATION, INSTALLATION & INSULATION |
| 2024-02-23 | Earth Engineers, Inc | $150.0K | CONCRETE TEST & SOIL TECHNICIAN |
| 2023-08-15 | JGR Eco-Logical Group, LLC | $119.2K | SUPPLY & INSTALL ROOF FLASHING |
| 2024-05-23 | Agl Construction Inc | $75.0K | EXCAVATOR & OPERATOR |
| 2023-11-02 | Mertz Enterprises, Inc | $74.9K | UPH BUILDING - SOLAR WATER HEATER PACKAGE |
| 2024-08-23 | Homeca Recycling Center Co. Inc. | $62.0K | PROVIDE EQUIPMENT & OPERATORS FOR CRUSHING & RECYCLING OF ON-SITE CONCRETE AND ROCK |
| 2024-01-31 | The Macomb Group, Inc | $58.5K | PURHCASE ORDER - UPH BUILDING PLUMBING FIXTURE & EQUIPMENT |
| 2024-01-18 | The Macomb Group, Inc | $54.1K | MEDICAL BUILDING PLUMBING FIXTURES & EQUIPMENT |
| 2022-10-13 | Schnabel Engineering, LLC | $41.0K | GEOTECH PRELIMINARY REPORT |
14 actions since 2023-01-18. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-20 | P00015 | Supplemental agreement (work within scope) | $8.64M | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR016: GENERAL CONDITIONS AND ADDITIONAL COSTS FROM LUMA DELAYS. |
| 2025-11-21 | P00014 | Supplemental agreement (work within scope) | $2.84M | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 015: CONSTRUCT TEMPORARY ELECTRICAL DISTRIBUTION CG HOUSING. |
| 2025-07-11 | P00013 | Supplemental agreement (work within scope) | -$89.0K | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR012: DESCOPE WIDENING OF WING ROAD. |
| 2025-05-13 | P00012 | Supplemental agreement (work within scope) | $98.9K | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 014: DESIGN TEMPORARY ELECTRICAL DISTRIBUTION: CG HOUSING |
| 2025-03-19 | P00011 | Supplemental agreement (work within scope) | -$122.6K | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 011: DESCOPE SALVAGE AND REINSTALLATION OF PV PANELS. |
| 2025-03-11 | P00010 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION IS ISSUED TO EXTEND THE CONTRACT COMPLETION DATE AT NO COST TO THE GOVERNMENT. |
| 2024-10-15 | P00009 | Supplemental agreement (work within scope) | -$35.3K | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR010 HOUSING EXTERIOR WORK DESCOPE |
| 2024-04-09 | P00008 | Supplemental agreement (work within scope) | $2.74M | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR009 SANITARY SEWER LINE REPLACEMENT |
| 2024-03-20 | P00007 | Supplemental agreement (work within scope) | $68.6K | THIS MODIFICATION IS ISSUED TO INCORPORATE CMR 007 COLUMN OBSTRUCTIONS |
| 2023-11-15 | P00006 | Supplemental agreement (work within scope) | -$158.5K | CMR 005 FFE CHANGES |
| 2023-09-29 | P00005 | Supplemental agreement (work within scope) | $116.8K | CMR 004 FFE CHANGES |
| 2023-07-03 | P00004 | Supplemental agreement (work within scope) | $720.8K | THIS ADMINISTRATIVE MODIFICATION IS ISSUED TO CHANGE THE COR. |
| 2023-02-14 | A00003 | Administrative change | $0 | THIS ADMINISTRATIVE MODIFICATION IS ISSUED TO CHANGE THE COR. |
| 2023-01-18 | P00003 | Additional work (new agreement) | -$1.60M | INCORPORATING CMR 002, DEVIATIONS 1 & 3 INTO THE CONTRACT |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗