DESIGN AND CONSTRUCT FRC HOMEPORT ASTORIA IN ASTORIA, OR
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
11 subawards totaling $24.15M (813.2% of what was obligated), as GWWH a Joint Venture reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Bergerson Construction Inc | $10.98M | 1 | OR | 2022-12-08 | 2022-12-08 |
| Big River Construction Inc | $3.75M | 1 | OR | 2023-06-02 | 2023-06-02 |
| J. E. Mcamis, Inc | $2.41M | 1 | CA | 2023-03-01 | 2023-03-01 |
| Inland Electric, Inc. | $2.30M | 1 | OR | 2023-07-28 | 2023-07-28 |
| Bering Industrial Contractors, Inc. | $1.85M | 1 | WA | 2023-09-25 | 2023-09-25 |
| Keller North America, Inc. | $1.13M | 1 | MD | 2023-09-11 | 2023-09-11 |
| Roger Langeliers Construction Co. | $1.12M | 1 | OR | 2024-07-24 | 2024-07-24 |
| Mcdermott Fence & Construction, Inc. | $276.5K | 1 | OR | 2024-07-29 | 2024-07-29 |
| Haley & Aldrich, Inc | $208.7K | 1 | MA | 2022-12-12 | 2022-12-12 |
| Elements Environmental Services, LLC | $94.4K | 1 | OR | 2024-03-25 | 2024-03-25 |
| K.D.A. Inc | $34.5K | 1 | OR | 2024-06-17 | 2024-06-17 |
| Date | To | Amount | For |
|---|---|---|---|
| 2022-12-08 | Bergerson Construction Inc | $10.98M | PROVIDE ALL MATERIAL, LABOR AND EQUIPMENT IN SUPPORT OF TASK ORDER NO. 70Z05022F43000011, ISSUED UNDER THE PRIME CONTRACT (ITEM 1), FOR DESIGN AND INSTALLATION OF FIXED PIER, FLOATING DOCKS, GANGWAYS AND PLATFORMS… |
| 2023-06-02 | Big River Construction Inc | $3.75M | PROVIDE ALL MATERIAL, LABOR AND EQUIPMENT IN SUPPORT OF TASK ORDER NO. 70Z05022F43000011, ISSUED UNDER THE PRIME CONTRACT (ITEM 1), TO TV INSPECT EXISTING STORM DRAIN AND SEWER; POTHOLE TO EXPOSE EXISTING UTILITIES;… |
| 2023-03-01 | J. E. Mcamis, Inc | $2.41M | PROVIDE ALL MATERIAL, LABOR AND EQUIPMENT IN SUPPORT OF TASK ORDER NO. 70Z05022F43000011, ISSUED UNDER THE PRIME CONTRACT (ITEM 1), TO DREDGE AND SUPPLY CLEAN SAND FILL. |
| 2023-07-28 | Inland Electric, Inc. | $2.30M | PROVIDE DESIGN OF SOIL MIXING SYSTEM; MOBILIZE, INSTALL, & VERIFY SOIL MIXING; SURVEY; TRANSPORT SPOILS MATERIAL TO ON-SITE STOCKPILE; AND ADD EXTRA PANELS. |
| 2023-09-25 | Bering Industrial Contractors, Inc. | $1.85M | PROVIDE ALL MATERIAL, LABOR AND EQUIPMENT IN SUPPORT OF TASK ORDER NO. 70Z05022F43000011, ISSUED UNDER THE PRIME CONTRACT (ITEM 1), TO INSTALL PIER AND FLOAT FIRE, WATER, AND SEWER UTILITIES. |
| 2023-09-11 | Keller North America, Inc. | $1.13M | DESIGN OF SOIL MIXING SYSTEM; MOBILIZE, INSTALL, & VERIFY SOIL MIXING; SURVEYING; TRANSPORT SPOILS MATL |
| 2024-07-24 | Roger Langeliers Construction Co. | $1.12M | PATCHING UTILITY TRENCHES & EXCAVATIONS, 24" REINFORCED VERTICAL CURB, PCC PAVEMENT, 8" REINFORCED ELECTRICAL PADS, 12" REINFORCED ELECTRICAL YARD, LABOR FOR DUCT BANK POURS, MOBILIZATION AND DEMOBILIZATION |
| 2024-07-29 | Mcdermott Fence & Construction, Inc. | $276.5K | PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT IN SUPPORT TO PROCURE AND INSTALL SECURITY FENCING AND GATES. |
| 2022-12-12 | Haley & Aldrich, Inc | $208.7K | DESIGN SUBMITTALS; QC DESIGN SUBMITTALS |
| 2024-03-25 | Elements Environmental Services, LLC | $94.4K | PROVIDE FUEL LINE CONTAINMENT; SLUDGE AND FUEL DISPOSAL |
| 2024-06-17 | K.D.A. Inc | $34.5K | PROVIDE 213 CY 3000 PSI READY MIX CONCRETE |
16 actions since 2024-01-29. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-09-18 | P00017 | Supplemental agreement (work within scope) | $16.0K | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995) INCORPORATE ADDITIONAL WORK AND FUNDS INTO THE CONTRACT. |
| 2025-07-24 | P00016 | Administrative change | $0 | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995) INCORPORATE FAR CLAUSE CHANGES INTO THE CONTRACT. |
| 2025-07-23 | P00015 | Supplemental agreement (work within scope) | $25.4K | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD WORK AND FUNDS FOR CONTRACT REQUEST FOR MODIFICATION (CMR15) VEHICULAR GATE CHANGES. |
| 2025-05-29 | P00014 | Supplemental agreement (work within scope) | $10.4K | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADDITIONAL ASBESTOS REMOVAL IN ACCORDANCE WITH CONTRACT REQUEST FOR MODIFICATION (CMR13). |
| 2025-03-20 | P00013 | Administrative change | $0 | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). COR CHANGE |
| 2025-01-17 | P00012 | Supplemental agreement (work within scope) | $1.82M | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD GROUND IMPROVEMENT WORK AND FUNDS. |
| 2024-12-20 | P00011 | Supplemental agreement (work within scope) | $38.9K | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). EXTEND HYAK MARITIME ACCESS TO CONSTRUCTION SITE. |
| 2024-10-17 | P00010 | Supplemental agreement (work within scope) | $49.4K | DESIGN AND CONSTRUCTION SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD ELECTRICAL UTILITY INFRASTRUCTURE IMPROVEMENTS. |
| 2024-08-21 | P00009 | Supplemental agreement (work within scope) | $140.7K | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD WORK RELATED TO CMRS 9, 10 AND SYSTEM DEVELOPMENT FEES FOR UTILITY INFRASTRUCTURE IMPROVEMENTS PLUS FUNDING. |
| 2024-07-25 | P00008 | Administrative change | $0 | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADMINISTRATIVE MOD TO FIX INVOICING ERROR |
| 2024-07-03 | P00007 | Administrative change | $0 | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD REQUIREMENT FOR A TELECOM SHELTER. |
| 2024-05-22 | P00006 | Supplemental agreement (work within scope) | $188.9K | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD REQUIREMENT FOR A TELECOM SHELTER. |
| 2024-05-20 | P00005 | Supplemental agreement (work within scope) | -$112.4K | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). REDUCE REQUIREMENTS AND ASSOCIATED FUNDS FOR ENVIRONMENTAL PERMIT, GREEN BUILDING INITIATIVES (GBI) AND PERISTALTIC PUMP. |
| 2024-05-06 | P00004 | Supplemental agreement (work within scope) | $103.2K | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD FUNDS AND REQUIREMENTS TO REMOVE UPLAND ASBESTOS. |
| 2024-04-30 | P00003 | Supplemental agreement (work within scope) | $692.7K | DESIGN AND CONSTRUCT SERVICES, USCG FRC HOMEPORT ASTORIA, OR (PN 6135995). ADD FUNDS FOR PEDESTRIAN GATE, PERMIT FEE AND REVETMENT REPAIR REQUIREMENTS. |
| 2024-01-29 | P00002 | Supplemental agreement (work within scope) | $0 | DESIGN AND CONSTRUCT FRC HOMEPORT ASTORIA IN ASTORIA, OR (PN 6135995). THIS MOD REFLECTS PERFORMANCE PERIOD CHANGE AFTER POST-AWARD PROTEST. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-05). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗