Putting the award page together from the records…
Putting the award page together from the records…
SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
41 subawards totaling $9.94M (26.3% of what was obligated), as Southwest Research Institute reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Teledyne Digital Imaging US Inc | $4.20M | 1 | MA | 2025-08-27 | 2025-08-27 |
| Uk Research & Innovation | $1.39M | 1 | 2025-03-11 | 2025-03-11 | |
| Avnet, Inc. | $846.0K | 6 | AZ, CA, FL | 2025-04-16 | 2025-11-25 |
| Sierra Nevada Corporation | $500.0K | 1 | CO | 2026-06-17 | 2026-06-17 |
| Frontgrade Gaisler Ab | $430.5K | 2 | 2025-06-05 | 2025-12-05 | |
| Microchip Technology Inc | $369.1K | 3 | AZ | 2025-03-21 | 2025-05-07 |
| The Aerospace Corporation | $280.9K | 2 | CA | 2025-05-16 | 2026-05-29 |
| 3D Plus U.S.A., Inc. | $261.0K | 4 | CA | 2025-06-06 | 2025-09-12 |
| KBR Wyle Services, LLC | $249.0K | 1 | MD | 2025-12-05 | 2025-12-05 |
| Optimax Systems, Inc. | $226.4K | 2 | NY | 2025-06-10 | 2026-07-16 |
| Nu-Tek Precision Optical Corp. | $176.6K | 2 | MD | 2025-10-01 | 2026-08-07 |
| Spirit America Labs Corp | $159.2K | 3 | AZ | 2025-06-02 | 2025-10-23 |
| Presidio Components, Inc. | $142.8K | 2 | CA | 2025-12-17 | 2025-12-17 |
| Frontgrade Technologies Inc. | $129.4K | 1 | NY | 2025-07-03 | 2025-07-03 |
| Glenair, Inc. | $122.8K | 2 | CA | 2025-11-13 | 2026-01-06 |
| RTX Corp | $90.2K | 1 | MN | 2026-08-28 | 2026-08-28 |
| Vantage Systems, Inc. | $82.8K | 1 | MD | 2025-12-04 | 2025-12-04 |
| Dunmore International Corp | $70.2K | 1 | PA | 2025-12-03 | 2025-12-03 |
| Cast Inc | $63.0K | 1 | MA | 2025-12-22 | 2025-12-22 |
| Arrow Electronics, Inc. | $41.4K | 1 | CO | 2025-09-22 | 2025-09-22 |
| Berkshire Hathaway Inc. | $36.5K | 1 | TX | 2025-06-12 | 2025-06-12 |
| Tayco Engineering, Inc. | $33.2K | 1 | CA | 2025-12-04 | 2025-12-04 |
| G. C. Micro Corporation | $32.2K | 1 | CA | 2025-11-05 | 2025-11-05 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-08-27 | Teledyne Digital Imaging US Inc | $4.20M | 4EM CCD230-85 & 11 FM CCD230-82 |
| 2025-03-11 | Uk Research & Innovation | $1.39M | THE SUBCONTRACT WILL DEVELOP AND DELIVER THE CAMERA SYSTEMS FOR THE SWSCOR INSTRUMENT. |
| 2026-06-17 | Sierra Space Corp | $500.0K | MISC, HOP, ACTUATOR |
| 2025-12-05 | Frontgrade Gaisler Ab | $391.0K | MICROCIRCUITS |
| 2025-11-06 | Avnet, Inc. | $267.4K | TRANSISTORS, RADIATION HARDENED POWER MOSFET |
| 2025-05-07 | Microchip Technology Inc | $258.6K | TO PROCURE FIELD PROGRAMMABLE GATE ARRAY, SCREENED PER MIL-PRF-38535 CLASS Q |
| 2025-04-17 | Avnet Inc | $253.4K | PURCHASED 9 MICROSS D/DC ELEC ASSEMBLY DEVICES FOR THE END USER AND HER DIVISION |
| 2025-12-05 | KBR Wyle Services, LLC | $249.0K | KBR WILL PROVIDE CONTAMINATION CONTROL SUPPORT TO MAXIMIZE THE PROBABILITY OF A SUCCESSFUL MISSION FOR SWSCOR. |
| 2026-07-16 | Optimax Systems, Inc. | $184.9K | LENSES OLA, SWSCOR |
| 2026-05-29 | The Aerospace Corporation | $150.3K | UPDATE AND EXTEND THE FAULT TREE ANALYSIS (FTA) AND FAILURE MODES AND EFFECTS CRITICALITY ANALYSIS/CRITICAL ITEMS LIST (FMECA/CIL) PREVIOUSLY DELIVERED FOR PRELIMINARY DESIGN REVIEW (PDR). |
| 2026-08-07 | Nu-Tek Precision Optical Corp. | $143.0K | FABRICATION FOR A CUSTOM HEAT REJECTION MIRROR PART |
| 2025-05-16 | The Aerospace Corporation | $130.6K | AEROSPACE WILL SUPPORT THE IMPLEMENTATION OF A RELIABILITY PROGRAM FOR THE SWSCOR INSTRUMENT DEVELOPMENT AND DELIVERY PROGRAM. |
| 2025-07-03 | Frontgrade Technologies Inc. | $129.4K | MICROCIRCUIT RADIATION HARDENED MRAM 2MX8-BIT |
| 2025-04-16 | Avnet, Inc. | $113.2K | PURCHASED 6 MICROSS DC/DC CONVERTERS |
| 2025-11-20 | Avnet, Inc. | $105.6K | MICROCIRCUITS RADIATION HARDENED |
| 2025-12-17 | Presidio Components, Inc. | $94.0K | CAPACITORS CERAMIC CHIPS |
| 2025-06-09 | 3D Plus U.S.A., Inc. | $90.6K | PROCUREMENT OF SPECIFIC SPACE GRADE SDRAM MEMORY |
| 2026-08-28 | Rosemount Aerospace Inc | $90.2K | 0118MM1000CBACDB; PLATINUM RESISTANCE THERMOMETER, 1000 OHM; 0118MM2000CBACDB; PLATINUM RESISTANCE THERMOMETER, 2000 OHM |
| 2025-12-04 | Vantage Systems, Inc. | $82.8K | ENGINEERING SERVICES FOR SEVEN (7) MLI BLANKETS FOR SWSCOR-TELESCOPE, C&DH E-BOX AND CAMERA E-BOX. |
| 2026-01-06 | Glenair, Inc. | $81.8K | CONNECTOR |
| 2025-07-31 | 3D Plus U.S.A., Inc. | $76.0K | PROCUREMENT OF SPECIFIC SPACE GRADE DDR2 SDRAM MEMORY |
| 2025-11-25 | Avnet Inc | $73.6K | MICROCIRCUITS |
| 2025-04-03 | Microchip Technology Inc | $71.4K | MICROCIRCUIT FIELD PROGRAMMABLE GATE ARRAY. |
| 2025-12-03 | Dunmore International Corp | $70.2K | PURCHASING FLIGHT APPROVED TAPES |
| 2025-06-02 | Spirit America Corp | $67.1K | TO PROCURE RADIATION HARDENED MICROCIRCUITS MANUFACTURED BY TEXAS INSTRUMENTS. |
12 actions since 2024-12-23. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-08-24 | P00011 | Administrative change | $0 | CORONAGRAPH REQUIREMENT |
| 2026-06-25 | P00010 | Funding only | $7.50M | CORONAGRAPH REQUIREMENT |
| 2026-06-22 | P00009 | Change order | $0 | CORONAGRAPH REQUIREMENT |
| 2026-04-20 | P00008 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION INCORPORATES THE REVISED ATTACHMENT B: CORONAGRAPH REQUIREMENT SPECIFICATION (CSPEC), AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| 2026-01-09 | P00007 | Funding only | $6.50M | THIS MODIFICATION OBLIGATES ADDITIONAL FUNDING FOR THE SPACE WEATHER CORONAGRAPH REQUIREMENT. |
| 2025-09-25 | P00006 | Funding only | $5.50M | THIS MODIFICATION OBLIGATES ADDITIONAL FUNDING FOR THE SPACE WEATHER CORONAGRAPH REQUIREMENT. |
| 2025-05-22 | P00005 | Funding only | $6.00M | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
| 2025-04-29 | P00004 | Funding only | $4.30M | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
| 2025-04-22 | P00003 | Administrative change | $0 | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
| 2025-03-17 | P00002 | Administrative change | $0 | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
| 2025-01-23 | P00001 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035--SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
| 2024-12-23 | 0 | $8.00M | SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗