STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
78 subawards totaling $85.92M (55.4% of what was obligated), as Columbus Technologies and Services, Inc reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Halma Public Limited Company | $17.87M | 2 | OK, PA | 2025-04-14 | 2025-10-20 |
| Genesis Engineering Solutions, Inc. | $12.67M | 3 | MD | 2025-04-15 | 2025-10-31 |
| Miller Engineering & Research Corp | $9.70M | 1 | MD | 2025-03-27 | 2025-03-27 |
| Adnet Systems Inc | $7.10M | 1 | MD | 2025-03-26 | 2025-03-26 |
| Ak Aerospace Technology Corporation | $4.76M | 1 | MD | 2025-04-02 | 2025-04-02 |
| Fibertek, Inc. | $3.96M | 1 | VA | 2025-07-29 | 2025-07-29 |
| N2L Inc | $3.61M | 1 | AL | 2025-05-20 | 2025-05-20 |
| Microtel LLC | $1.96M | 1 | VA | 2025-04-02 | 2025-04-02 |
| Relative Dynamics Inc | $1.66M | 1 | MD | 2025-03-26 | 2025-03-26 |
| Newton LLC | $1.66M | 1 | MD | 2025-03-27 | 2025-03-27 |
| Conveyors & Plastics Inc | $1.63M | 3 | MD | 2025-07-29 | 2025-10-31 |
| North Star Imaging, Inc. | $1.55M | 1 | FL | 2026-08-31 | 2026-08-31 |
| Conceptual Analytics LLC | $1.52M | 2 | MD | 2025-04-03 | 2025-04-09 |
| Strategic Services Reston Inc | $1.41M | 1 | VA | 2025-03-28 | 2025-03-28 |
| Design Interface Inc | $1.38M | 1 | MD | 2025-04-03 | 2025-04-03 |
| Alpha Engineering Technical Services Corp | $1.21M | 1 | MD | 2025-04-14 | 2025-04-14 |
| Omitron, Inc. | $997.1K | 1 | MD | 2025-04-01 | 2025-04-01 |
| Carr Astronautics Corp | $995.7K | 1 | MD | 2025-04-02 | 2025-04-02 |
| Ingenion, LLC | $767.7K | 1 | FL | 2025-04-01 | 2025-04-01 |
| Concentric Real Time, LLC | $759.4K | 1 | MD | 2025-04-01 | 2025-04-01 |
| Stellar Solutions Inc | $708.0K | 1 | CA | 2025-03-30 | 2025-03-30 |
| Etavonics, LLC | $635.4K | 1 | MD | 2025-04-01 | 2025-04-01 |
| Lichtig Emc Consulting LLC | $568.6K | 1 | NJ | 2025-04-03 | 2025-04-03 |
| Bertin Alpao | $561.5K | 1 | AUVERGNE-RHÔNE-ALPES | 2026-06-17 | 2026-06-17 |
| Libration Systems Management Inc | $479.2K | 1 | NM | 2025-04-03 | 2025-04-03 |
The 25 largest of 64; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2025-04-14 | Avo Photonics, Inc | $17.48M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-15 | Genesis Engineering Solutions, Inc. | $12.58M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-27 | Miller Engineering & Research Corp | $9.70M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-26 | Adnet Systems Inc | $7.10M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-02 | Ak Aerospace Technology Corporation | $4.76M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-07-29 | Fibertek, Inc. | $3.96M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-05-20 | N2L Inc | $3.61M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-02 | Microtel LLC | $1.96M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-26 | Relative Dynamics Inc | $1.66M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-27 | Newton LLC | $1.66M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2026-08-31 | North Star Imaging, Inc. | $1.55M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-03 | Conceptual Analytics LLC | $1.49M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-28 | Strategic Services Reston Inc | $1.41M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-03 | Design Interface Inc | $1.38M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-14 | Alpha Engineering Technical Services Corp | $1.21M | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-01 | Omitron, Inc. | $997.1K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-02 | Carr Astronautics Corp | $995.7K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-10-31 | Conveyors & Plastics Inc | $892.1K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-01 | Ingenion, LLC | $767.7K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-01 | Concentric Real Time, LLC | $759.4K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-03-30 | Stellar Solutions Inc | $708.0K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-07-29 | Conveyors & Plastics Inc | $654.4K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-01 | Etavonics, LLC | $635.4K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2025-04-03 | Lichtig Emc Consulting LLC | $568.6K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
| 2026-06-17 | Bertin Alpao | $561.5K | PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE,… |
33 actions since 2025-01-08. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-25 | P00032 | Funding only | $10.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-09-23 | P00031 | Funding only | $14.48M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-09-15 | P00030 | Funding only | $8.89M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-08-18 | P00029 | Funding only | -$25.2K | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-08-18 | P00028 | Funding only | $9.38M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-07-16 | P00027 | Funding only | -$5.2K | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-07-15 | P00026 | Funding only | $7.99M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-06-16 | P00025 | Funding only | $7.05M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-06-08 | P00024 | Administrative change | $0 | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-06-02 | P00023 | Administrative change | $0 | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-05-19 | P00022 | Funding only | $8.67M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-04-16 | P00021 | Funding only | $6.48M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-04-16 | P00020 | Administrative change | $0 | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-04-09 | P00019 | Funding only | -$47.7K | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-03-11 | P00018 | Funding only | $5.66M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2026-02-17 | P00017 | Funding only | $5.20M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-12-15 | P00015 | Funding only | $2.95M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-11-20 | P00014 | Funding only | $8.28M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-09-25 | P00013 | Administrative change | $0 | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-09-19 | P00012 | Funding only | $133.3K | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-09-19 | P00011 | Funding only | $5.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-09-18 | P00010 | Funding only | $8.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-08-20 | P00009 | Funding only | $4.81M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-07-23 | P00008 | Funding only | $9.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-06-17 | P00007 | Funding only | $9.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-06-05 | P00006 | Administrative change | $0 | UPDATE CLAUSES IAW PCD 21-01B |
| 2025-05-20 | P00005 | Funding only | $7.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.. |
| 2025-05-06 | P00004 | Funding only | $5.18M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-05-01 | P00003 | Administrative change | $0 | REMOVAL OF CLAUSES IAW PCD 25-01, CLASS DEVIATION FROM FAR REGARDING E.O. 14173 AND E.O. 14168 AND PCD 25-02, CLASS DEVIATION FROM FAR REGARDING E.O. 14148 AND E.O. 14057 |
| 2025-02-07 | P00002 | Administrative change | $0 | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-01-24 | P00001 | Administrative change | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14148-DEVELOPMENT,FABRICATION, INTEGRATION, TESTING, VERIFICATION, OPERATIONS OF SPACE FLIGHT, AIRBORNE, GROUND SYSTEM HARDWARE, AND DEVELOPMENT/VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE /SCIENCE MISSIONS. |
| 2025-01-13 | P00016 | Funding only | $7.13M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |
| 2025-01-08 | 0 | $5.00M | STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. |