OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1 subaward totaling $1.48M (0.1% of what was obligated), as United Cleanup Oak Ridge LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| VNS Federal Services LLC | $1.48M | 1 | WA | 2026-03-04 | 2026-03-04 |
| Date | To | Amount | For |
|---|---|---|---|
| 2026-03-04 | VNS Federal Services LLC | $1.48M | DOE DIRECTED USE OF EMCBC BOA TO VEOLIA FOR TECHNOLOGY DEVELOPMENT TO COMPLETE SODIUM SHIELD VITRIFICATION USING VNSFS GEOMELT VITRIFICATION TECHNOLOGY. THE TEST WAS SUCCESSFUL AND THIS IS A FOLLOW-ON MODIFICATION TO… |
126 actions since 2023-05-17. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-09-30 | P00127 | Supplemental agreement (work within scope) | $3.92M | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING IN THE AMOUNT OF 3,921,869.97 THEREBY INCREASING TOTAL OBLIGATIONS TO $2,544,767,269.97. |
| 2026-09-30 | P00126 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CONSOLIDATE SUBTASKS INTO THE MASTER TASK ORDER. THERE IS NO CHANGE TO SCOPE, COST, FEE, OR OTHER TERMS AND CONDITIONS AS A RESULT OF THIS CONSOLIDATION. THE CONSOLIDATED TASK ORDER IS ATTACHED IN ITS ENTIRETY. |
| 2026-09-29 | P00124 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND SUBTASK 4-1: CORE FUNCTION AND POST-RETIREMENT BENEFITS/LONG-TERM DISABILITY AND PENSION, FOR FISCAL YEAR 2027 |
| 2026-09-29 | P00122 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE NEGOTIATED AGREEMENTS FOR REAS UCOR-T5-014, UCOR-T5-016, TO AWARD AND EXERCISE OPTIONS 4A, 4B, 4D, AND 4G FROM PROPOSAL UCOR-T6-011, SUBTASK 6-1, AND, TO REMOVE THE PERFORMANCE PERIOD WITH NO CHANGE |
| 2026-08-28 | P00123 | Funding only | $7.12M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $7,122,472.57. TOTAL OBLIGATIONS HEREBY INCREASED FROM $2,533,722,927.43 TO 2,540,845,400.00. |
| 2026-07-31 | P00121 | Funding only | $104.35M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $104,349,019.43. TOTAL OBLIGATIONS HEREBY INCREASED FROM $2,429,373,908 TO $2,533,722,927.43. |
| 2026-06-30 | P00120 | Funding only | $20.13M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $20,125,000.00. |
| 2026-06-18 | P00119 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD STORAGE OF LLNL WASTE WITH NO CHANGE TO COST, SCHEDULE, OR FEE. |
| 2026-06-04 | P00117 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO AWARD THE NEGOTIATED AGREEMENT FOR SUBTASK PROPOSAL UCOR-T6-1A-001, WHITE WING SCRAP YARD REMOVAL ACTION(S), DATED JUNE 25, 2025. |
| 2026-05-22 | P00118 | Funding only | $90.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $90K. |
| 2026-05-22 | P00116 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A UNILATERAL CHANGE ORDER UNDER SUBTASK 6-1, Y-12 OPERATIONS AND CLEANUP END STATES, AUTHORIZING A NOT-TO-EXCEED VALUE OF $18,000,000 WITHIN SUBCLIN 000361. DETAILS IN THE ATTACHED CONTINUATION PAGES. |
| 2026-04-30 | P00115 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN AMENDMENT TO CHANGE ORDER MODIFICATION P00108 UNDER SUBTASK 5-1, ORNL OPERATIONS AND CLEANUP END STATES, WITH NO INCREASE TO THE NOT-TO-EXCEED VALUE OF $867,838 WITHIN SUBCLIN 000351. |
| 2026-04-21 | P00111 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE DEFINITIZATION OF CHANGE ORDER MODIFICATIONS P00087/P00094 AND PROPOSAL UCOR-T4-1-006, REVISION 1; SETTLEMENT OF REQUESTS FOR EQUITABLE ADJUSTMENT UCOR-T5-009, 3517 HOT CELL INVESTIGATION; UCOR-T |
| 2026-04-15 | P00114 | Funding only | $216.45M | THIS MODIFICATION PROVIDES INCREMENTAL FUNDING MID APRIL 2026. |
| 2026-04-10 | P00113 | Supplemental agreement (work within scope) | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE OF THE ENHANCED DISPERSION MODELING SCOPE IN SUBTASK 4-1. |
| 2026-04-02 | P00106 | Supplemental agreement (work within scope) | $0 | THIS MOD INCORPORATES PARTIAL NEGOTIATION OF PROPOSAL UCOR T6-1-011, SUBTASK 6-1: ADDITION OF OUTFALL SITE AND EQUIPMENT MAINTENANCE SERVICES, AND SUBTASK 4-1: ADDITION OF CENTRAL WAREHOUSE LEASES AND UPPER EAST FORK POPULAR CREEK AND WEST END MERCUR |
| 2026-03-26 | P00112 | Funding only | $8.23M | FUNDING MOD FOR MARCH 2026. |
| 2026-03-26 | P00109 | Supplemental agreement (work within scope) | $0 | MOD INCORPORATES SETTLEMENT OF 3 REAS _UCOR T6-1-003, BETA-1_ 9204-1 DEAC HAZARD ABATEMENT; UCOR T6-1-007 BETA-4 SOIL SAMPLING AND PRELIMINARY HAZARD SCREENING; AND, UCOR T8-2-001, GRNDWTR FIELD DEMO ROCK ENCOUNTERED DURING EXCAVATION. |
| 2026-03-26 | P00108 | Supplemental agreement (work within scope) | $0 | INCORPORATE NEGOTIATION OF PROPOSAL UCOR T8-2-003, ENVIRONMENTAL MANAGEMENT DISPOSAL FACILITY (EMDF) EAST SPOILS DESIGN COMPLETION, AND DEFINITIZATION OF UNILATERAL CHANGE ORDER MODIFICATION P100 FOR PROPOSAL UCOR-T8-2-001, ENVIRONMENTAL MANAGEMENT D |
| 2026-02-27 | P00110 | Funding only | $49.74M | FEBRUARY 2026 FUNDING MODIFICATION |
| 2026-01-27 | P00107 | Funding only | $885.0K | JANUARY 2026 FUNDING MODIFICATION |
| 2025-12-30 | P00105 | Funding only | -$3.37M | DECEMBER 2025 FUNDING MODIFICATION |
| 2025-12-30 | P00104 | Change order definitized | $0 | MODIFICATION TO DEFINITIZE CHANGE ORDER ISSUED IN MODIFICATION P00092/P00098 |
| 2025-12-23 | P00103 | Supplemental agreement (work within scope) | $0 | MODIFICATION TO REVISE SUBTASK 17-1 SECTION C. TO CHANGE THE PURPOSE OF THE DARA FACILITY FROM TEST TO MAINTENANCE FACILITY AT NO EXTRA COST TO THE GOVERNMENT. |
| 2025-12-03 | P00087 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-12-02 | P00102 | Change order | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER UNDER SUBTASK 6-1, Y-12 OPERATIONS AND CLEANUP END STATES, TO COMPLETE TREE FELLING ACROSS 39 ACRES WITHIN WHITE WING SCRAP YARD. |
| 2025-11-25 | P00100 | Change order | $0 | FUNDING MODIFICATION |
| 2025-11-24 | P00101 | Funding only | $168.09M | MOD TO ADD INCREMENTAL FUNDING |
| 2025-11-24 | P00099 | Change order definitized | $0 | CHANGE ORDER DEFINITIZATION AND ADMINISTRATIVE CORRECTIONS |
| 2025-11-19 | P00098 | Change order | $0 | SUBTASK 4-1 CHANGE ORDER TO EXTEND THROUGH DEC 28, 2025 |
| 2025-11-19 | P00096 | Option exercised | $0 | CONTRACT MODIFICATION TO EXERCISE PRICED OPTIONAL SCOPE FOR ZONE 2 DUCT BANKS REMEDIAL ACTIONS. |
| 2025-10-31 | P00097 | Funding only | -$6.04M | FUNDING MODIFICATION |
| 2025-09-30 | P00095 | Supplemental agreement (work within scope) | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE ESTIMATED COST AND FIXED FEE WITHIN SUBCLIN 000392A FOR PROJECT MANAGEMENT AND PROJECT SUPPORT SERVICES FOR JULY 2025 AND ADDITIONAL SERVICES FOR THE PERIOD OCTOBER 1, 2025, THROUGH DECEMBER 31, 2025. |
| 2025-09-30 | P00094 | Change order | $0 | CHANGE ORDER MOD TO INCREASE THE NOT-TO-EXCEED VALUE ESTABLISHED VIA MODIFICATION P00087 FROM $200K TO $350K WITHIN SUBCLIN 000341. |
| 2025-09-26 | P00093 | Funding only | $39.38M | ADDING INCREMENTAL FUNDING IN THE AMOUNT OF $39,376,682.67. |
| 2025-09-25 | P00092 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-08-29 | P00091 | Funding only | $9.42M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-08-28 | P00090 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-08-27 | P00089 | Change order definitized | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-07-30 | P00088 | Funding only | $163.74M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-07-28 | P00086 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-06-27 | P00085 | Funding only | $69.51M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-06-26 | P00084 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-06-13 | P00083 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-06-11 | P00080 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-06-05 | P00082 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-05-30 | P00081 | Funding only | $49.42M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-05-21 | P00079 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-05-13 | P00078 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-05-12 | P00077 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-30 | P00076 | Funding only | $31.71M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-17 | P00075 | Administrative change | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-16 | P00074 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-11 | P00058 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-10 | P00073 | Administrative change | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-04-02 | P00072 | Administrative change | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-31 | P00071 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-31 | P00070 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-27 | P00069 | Funding only | $80.0K | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-26 | P00068 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-13 | P00067 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-03-12 | P00066 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-02-28 | P00065 | Funding only | $500.0K | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-02-28 | P00057 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-01-31 | P00064 | Funding only | $134.13M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2025-01-16 | P00060 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-12-31 | P00062 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDER |
| 2024-12-20 | P00063 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDER |
| 2024-12-04 | P00061 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDER |
| 2024-11-26 | P00059 | Funding only | $40.0K | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-11-19 | P00056 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-10-31 | P00054 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-10-30 | P00055 | Funding only | $132.32M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-10-30 | P00050 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-10-15 | P00053 | Option exercised | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-10-15 | P00051 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-09-27 | P00052 | Funding only | $34.12M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-09-24 | P00049 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-09-06 | P00048 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-09-04 | P00046 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-30 | P00047 | Funding only | $16.20M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-23 | P00043 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-22 | P00045 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-13 | P00044 | Administrative change | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-09 | P00042 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-08-02 | P00041 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-07-29 | P00040 | Funding only | $113.57M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-07-26 | P00039 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-07-11 | P00038 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-28 | P00037 | Funding only | $57.33M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-25 | P00036 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-14 | P00035 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-13 | P00033 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-11 | P00034 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-11 | P00031 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-06-10 | P00032 | Administrative change | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-05-31 | P00030 | Funding only | $46.62M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-05-24 | P00028 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-05-21 | P00029 | Change order | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-04-29 | P00027 | Funding only | $56.10M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-04-18 | P00026 | Supplemental agreement (work within scope) | $0 | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
| 2024-04-04 | P00025 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2024-03-29 | P00024 | Funding only | $39.50M | ORRCC TASK ORDERS |
| 2024-03-26 | P00023 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2024-02-29 | P00022 | Funding only | $56.38M | ORRCC TASK ORDERS |
| 2024-02-29 | P00021 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2024-02-29 | P00020 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2024-02-28 | P00019 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2024-01-31 | P00018 | Funding only | $0 | ORRCC TASK ORDERS |
| 2024-01-31 | P00017 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-12-22 | P00016 | Funding only | $83.80M | ORRCC TASK ORDERS |
| 2023-11-24 | P00015 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-11-22 | P00014 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-11-21 | P00008 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-11-16 | P00012 | Funding only | $2.04M | ORRCC TASK ORDERS |
| 2023-10-27 | P00011 | Funding only | $86.62M | ORRCC TASK ORDERS |
| 2023-09-28 | P00010 | Funding only | $17.29M | ORRCC TASK ORDERS |
| 2023-09-20 | P00006 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-08-31 | P00009 | Funding only | -$0 | ORRCC TASK ORDERS |
| 2023-08-24 | P00007 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-07-24 | P00005 | Funding only | $174.18M | ORRCC TASK ORDERS |
| 2023-07-24 | P00003 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-07-21 | P00004 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-07-18 | P00002 | Supplemental agreement (work within scope) | $0 | ORRCC TASK ORDERS |
| 2023-05-25 | P00001 | Funding only | $122.05M | ORRCC TASK ORDERS |
| 2023-05-17 | 0 | $439.11M | OAK RIDGE RESERVATION CLEANUP CONTRACT TASK ORDERS |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗