FA248616C0002↗
Reliance Test & Technology, LLC received this contract from Fa2488 Aftc Pzza Eglin, Department of the Air Force: $502.58M obligated so far for equipment and materials testing- weapons. Its period of performance ended 2026-09-30.
Key facts · data as of Oct 25, 2026
- Recipient
- Reliance Test & Technology, LLC
- Awarding agency
- Department of the Air Force (Department of Defense)
- Contracting office
- Fa2488 Aftc Pzza Eglin (FA2488)
- Obligated to date
- $502.58M
- Potential value
- $863.08M
- Ends
- 2026-09-30
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award FA248616C0002, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_FA248616C0002_9700_-NONE-_-NONE-
Reliance Test & Technology, LLC: all federal awards · Department of Defense: spending · Fa2488 Aftc Pzza Eglin: what it buys · The follow-on: recompete brief
IGF::OT::IGF EGLIN - OPERATION&MAINTENANCE SERVICES (E-OMS)
Up for re-bid: ends 2026-09-30. Recompete brief →
What it is
- Product or service
- Equipment and Materials Testing- Weapons (PSC H210)
- Industry
- Engineering Services (NAICS 541330)
- Contracting office
- Fa2488 Aftc Pzza Eglin (FA2488)
- Competition
- Full and open competition · 3 offers received
- Pricing
- Cost plus award fee
- How it was bought
- Standalone contract
- Solicitation
- FA248616R0002
- Where the work is
- Okaloosa, FL · district FL-01
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
Every action
181 actions since 2022-10-06. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-07-15 | P00268 | Administrative change | $0 | EGLIN OPERATION AND MAINTENANCE SERVICES (E-OMS) |
| 2026-05-05 | P00266 | Supplemental agreement (work within scope) | $21.73M | EGLIN OPERATION AND MAINTENANCE SERVICES (E-OMS) |
| 2026-04-14 | P00265 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION AND MAINTENANCE SERVICES (E-OMS) |
| 2026-04-01 | P00264 | Funding only | $4.91M | EGLIN OPERATION AND MAINTENANCE SERVICES (E-OMS) |
| 2026-03-12 | P00263 | Option exercised | $9.77M | EGLIN OPERATION AND MAINTENANCE SERVICES (E-OMS) |
| 2026-02-18 | P00262 | Funding only | $10.05M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2026-01-20 | P00261 | Funding only | $4.06M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-12-29 | P00260 | Funding only | $2.10M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-12-17 | P00259 | Funding only | $914.2K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-12-04 | P00258 | Funding only | $24.31M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-11-14 | P00257 | Funding only | $12.30M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-10-17 | P00256 | Funding only | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-10-09 | P00255 | Funding only | $1.70M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-10-01 | P00254 | Funding only | $766.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-09-30 | P00253 | Funding only | $1.40M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-09-23 | P00252 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-09-22 | P00251 | Funding only | $7.91M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-09-09 | P00250 | Administrative change | $271.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-08-20 | P00249 | Funding only | $2.17M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-08-15 | P00248 | Funding only | $955.9K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-08-12 | P00247 | Funding only | $6.99M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-08-01 | P00246 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-07-24 | P00245 | Funding only | -$32.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-07-10 | P00244 | Funding only | $1.14M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-06-24 | P00243 | Supplemental agreement (work within scope) | $3.80M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-06-06 | P00242 | Funding only | $509.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-05-23 | P00241 | Funding only | $13.70M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-05-08 | P00240 | Supplemental agreement (work within scope) | $2.90M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-04-28 | P00239 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-04-21 | P00238 | Funding only | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-04-12 | P00237 | Funding only | $25.79M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-03-26 | P00236 | Supplemental agreement (work within scope) | $2.9K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-03-11 | P00235 | Supplemental agreement (work within scope) | $15.84M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-01-28 | P00233 | Supplemental agreement (work within scope) | $3.63M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-01-28 | P00233 | Supplemental agreement (work within scope) | $12.62M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-01-28 | P00233 | Supplemental agreement (work within scope) | $4.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2025-01-13 | P00232 | Funding only | $940.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-12-17 | P00231 | Supplemental agreement (work within scope) | $1.51M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-12-17 | P00231 | Supplemental agreement (work within scope) | $1.04M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-12-05 | P00230 | Funding only | $5.41M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-12-05 | P00230 | Funding only | $8.54M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-12-05 | P00230 | Funding only | $3.30M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-11-26 | P00229 | Administrative change | $7.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-11-01 | P00228 | Funding only | $1.16M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-11-01 | P00228 | Funding only | $1.09M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-23 | P00227 | Funding only | $2.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-03 | P00226 | Funding only | $5.21M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-03 | P00226 | Funding only | $11.90M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-03 | P00226 | Funding only | $4.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-01 | P00225 | Supplemental agreement (work within scope) | $350.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-01 | P00225 | Supplemental agreement (work within scope) | -$250.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-10-01 | P00225 | Supplemental agreement (work within scope) | -$100.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-24 | P00224 | Funding only | $2.98M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-24 | P00224 | Funding only | $670.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-24 | P00224 | Funding only | $250.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-13 | P00223 | Supplemental agreement (work within scope) | -$553.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-13 | P00223 | Supplemental agreement (work within scope) | $370.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-09-13 | P00223 | Supplemental agreement (work within scope) | $150.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-08-14 | P00222 | Funding only | $5.37M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-08-14 | P00222 | Funding only | $584.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-08-05 | P00221 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-06-26 | P00220 | Funding only | $20.0K | EGLIN OPERATION & MAINTENANCE SERVICES (E-OMS) |
| 2024-06-26 | P00220 | Funding only | $2.00M | EGLIN OPERATION & MAINTENANCE SERVICES (E-OMS) |
| 2024-06-18 | P00219 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-05-29 | P00218 | Funding only | $2.58M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-05-29 | P00218 | Funding only | $15.24M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-05-29 | P00218 | Funding only | $6.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-05-09 | P00217 | Funding only | $520.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-05-09 | P00217 | Funding only | $2.00M | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-04-23 | P00216 | Funding only | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-04-17 | P00215 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-04-17 | P00214 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-04-11 | P00213 | Funding only | $26.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-04-11 | P00213 | Funding only | $225.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-03-29 | P00212 | Option exercised | $6.92M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-03-29 | P00212 | Option exercised | $15.65M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-03-29 | P00212 | Option exercised | $6.15M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-03-21 | P00211 | Funding only | $970.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-03-21 | P00211 | Funding only | $380.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-03-18 | P00210 | Administrative change | -$137.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-03-18 | P00210 | Administrative change | $82.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-03-14 | P00210 | Administrative change | $590.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-02-29 | P00209 | Administrative change | $0 | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-02-29 | P00208 | Supplemental agreement (work within scope) | $64.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES (EOMS) |
| 2024-02-29 | P00208 | Supplemental agreement (work within scope) | $3.93M | EGLIN OPERATIONS & MAINTENANCE SERVICES (EOMS) |
| 2024-02-29 | P00208 | Supplemental agreement (work within scope) | $850.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES (EOMS) |
| 2024-02-06 | P00207 | Funding only | $100.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-02-06 | P00207 | Funding only | $350.0K | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-01-26 | P00206 | Funding only | $767.3K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2024-01-22 | P00205 | Funding only | $1.07M | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-01-22 | P00205 | Funding only | $6.42M | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-01-22 | P00205 | Funding only | $1.80M | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2024-01-03 | P00204 | Supplemental agreement (work within scope) | $452.2K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-01-03 | P00204 | Supplemental agreement (work within scope) | -$332.2K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2024-01-03 | P00204 | Supplemental agreement (work within scope) | -$120.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-12-18 | P00203 | Administrative change | $3.49M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-12-18 | P00203 | Administrative change | $7.79M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-12-18 | P00203 | Administrative change | $2.70M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-12-07 | P00202 | Funding only | $320.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-12-07 | P00202 | Funding only | $1.10M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-29 | P00201 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-22 | P00200 | Supplemental agreement (work within scope) | $275.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-16 | P00199 | Supplemental agreement (work within scope) | $7.87M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-16 | P00199 | Supplemental agreement (work within scope) | $5.49M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-16 | P00199 | Supplemental agreement (work within scope) | $1.57M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-02 | P00198 | Supplemental agreement (work within scope) | $85.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-11-02 | P00198 | Supplemental agreement (work within scope) | $152.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2023-10-17 | P00197 | Funding only | $15.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-17 | P00197 | Funding only | $210.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-12 | P00196 | Funding only | $1.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-12 | P00196 | Funding only | $40.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-01 | P00195 | Funding only | $4.15M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-01 | P00195 | Funding only | $10.35M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-10-01 | P00195 | Funding only | $4.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-29 | P00194 | Funding only | $3.50M | EGLIN OPERATIONS AND MAINTENANCE SERVICES CONTRACT |
| 2023-09-28 | P00193 | Funding only | $20.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-28 | P00193 | Funding only | $1.13M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-25 | P00192 | Funding only | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-14 | P00191 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-07 | P00190 | Funding only | $125.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-07 | P00190 | Funding only | $513.9K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-05 | P00189 | Funding only | -$583.7K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-05 | P00189 | Funding only | $1.34M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-09-05 | P00189 | Funding only | $150.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-08-16 | P00188 | Administrative change | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-08-04 | P00187 | Administrative change | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-07-20 | P00186 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-07-14 | P00185 | Funding only | $4.99M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-07-14 | P00185 | Funding only | $4.86M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-07-14 | P00185 | Supplemental agreement (work within scope) | $4.50M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-06-28 | P00184 | Funding only | $1.43M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-06-27 | P00183 | Funding only | $2.04M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-06-27 | P00183 | Funding only | -$3.92M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-06-09 | P00182 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-31 | P00181 | Funding only | $80.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-31 | P00181 | Funding only | $1.38M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-22 | P00180 | Funding only | $4.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-22 | P00180 | Funding only | $2.05M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-22 | P00180 | Funding only | $2.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-05 | P00179 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-02 | P00178 | Funding only | $10.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-05-02 | P00178 | Funding only | $290.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-25 | P00177 | Supplemental agreement (work within scope) | $700.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-25 | P00177 | Supplemental agreement (work within scope) | $1.30M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-13 | P00176 | Funding only | $1.20M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-07 | P00175 | Funding only | -$56.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-07 | P00175 | Funding only | -$53.5K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-04-07 | P00175 | Funding only | $110.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-03-23 | P00174 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-03-16 | P00173 | Funding only | $550.0K | EGLIN OPERATION AND MAINTENANCE |
| 2023-03-16 | P00173 | Funding only | $2.45M | EGLIN OPERATION AND MAINTENANCE SERVICES |
| 2023-03-02 | P00172 | Funding only | $7.80M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-03-02 | P00172 | Funding only | $18.40M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-03-02 | P00172 | Funding only | $6.80M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-03-02 | P00171 | Funding only | $142.3K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-02-14 | P00170 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-02-01 | P00169 | Funding only | $111.7K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-02-01 | P00169 | Funding only | $1.32M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-02-01 | P00169 | Funding only | -$40.2K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-01-13 | P00168 | Funding only | $958.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-01-13 | P00168 | Funding only | $11.72M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-01-13 | P00168 | Funding only | $4.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-01-11 | P00167 | Funding only | $75.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2023-01-11 | P00167 | Funding only | $225.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2022-12-20 | P00166 | Funding only | $1.00M | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2022-12-08 | P00165 | Supplemental agreement (work within scope) | $75.6K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2022-12-08 | P00165 | Supplemental agreement (work within scope) | $34.0K | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2022-12-02 | P00164 | Funding only | $936.5K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-11-21 | P00163 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATIONS & MAINTEANCE SERVICES |
| 2022-11-15 | P00162 | Administrative change | $2.00M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-11-15 | P00162 | Administrative change | $7.90M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-11-15 | P00162 | Administrative change | $3.00M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-11-04 | P00161 | Funding only | $70.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-11-04 | P00161 | Funding only | $530.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-31 | P00160 | Funding only | $875.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-31 | P00160 | Funding only | -$130.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-27 | P00160 | Funding only | -$245.0K | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-18 | P00159 | Supplemental agreement (work within scope) | $0 | EGLIN OPERATION & MAINTENANCE SERVICES |
| 2022-10-07 | P00158 | Funding only | $9.31M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-07 | P00158 | Funding only | $3.20M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
| 2022-10-06 | P00158 | Funding only | $13.06M | EGLIN OPERATIONS & MAINTENANCE SERVICES |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗