SXHT 22-1032 DESIGN 423 SCIF
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
7 actions since 2023-09-29. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2025-07-15 | P00006 | Supplemental agreement (work within scope) | -$25.1K | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO: RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2024-09-17 | P00005 | Administrative change | $0 | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO:RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2024-08-14 | P00004 | Supplemental agreement (work within scope) | $24.8K | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO:RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2024-06-14 | P00003 | Administrative change | $0 | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO:RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2024-06-05 | P00002 | Administrative change | $0 | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO:RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2024-05-01 | P00001 | Administrative change | $0 | SXHT 22-1032: REPAIR CONTROLLED AREA B423 (DESIGN) CTR TO PROVIDE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND GOVERNMENT COST ESTIMATES TO:RENOVATE THE EXISTING COMMAND POST AREA C1 IN BUILDING 423 AND TO REMOVE EXISTING RAISED FLOORING AREA INCLUDI |
| 2023-09-29 | 0 | $251.3K |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| SXHT 22-1032 DESIGN 423 SCIF |