CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. PERIOD OF PERFORMANCE IS 272 CALENDAR DAYS.
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
2 actions since 2023-03-30. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2023-08-09 | P00001 | Supplemental agreement (work within scope) | $27.7K | CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. |
| 2023-03-30 | 0 | $1.78M | CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. PERIOD OF PERFORMANCE IS 272 CALENDAR DAYS. |