FA489723F0088↗

Burton Construction, Inc. received this contract from Fa4897 366 Cons PKP, Department of the Air Force: $15.22M obligated so far for maintenance of miscellaneous buildings. It runs to 2027-11-11.

Key facts · data as of Oct 23, 2026

Recipient
Burton Construction, Inc.
Awarding agency
Department of the Air Force (Department of Defense)
Contracting office
Fa4897 366 Cons PKP (FA4897)
Obligated to date
$15.22M
Potential value
$15.22M
Ends
2027-11-11

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 23, 2026.

Cite this page: SpendQuery, Award FA489723F0088, data as of Oct 23, 2026, https://spendquery.com/award?id=CONT_AWD_FA489723F0088_9700_FA489719DA005_9700

REPAIR HANGAR 201

Delivery Order · Department of the Air Force · to Burton Construction, Inc. (UEI NH7JETMN3L59) · data as of 2026-10-23

Obligated to date$15.22M12 actions
Current value$15.22Mwith options exercised
Period2023-09-29 → 2027-11-11current end date
Passed on$5.28Mto 8 subcontractors

Up for re-bid: ends 2027-11-11. Recompete brief →

What it is

Product or service
Maintenance of Miscellaneous Buildings (PSC Z1JZ)
Industry
Commercial and Institutional Building Construction (NAICS 236220)
Contracting office
Fa4897 366 Cons PKP (FA4897)
Competition
Full and open after exclusion of sources · 2 offers received
Pricing
Firm fixed price
How it was bought
Multiple-award IDIQ · under FA489719DA005
Where the work is
Elmore, ID · district ID-02

Obligations by fiscal year

FY2023$10.31M
FY2024$645.3K
FY2025$784.2K
FY2026$3.48M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

9 subawards totaling $5.28M (34.7% of what was obligated), as Burton Construction, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Quality Electric, Inc$2.53M1ID2024-02-122024-02-12
Red Bear Construction LLC$697.8K1ID2024-01-302024-01-30
Api Group Life Safety USA LLC$689.9K1UT2024-01-232024-01-23
Paige Mechanical Group Inc$626.9K2ID2024-01-032024-01-23
Uniq Steel Inc$538.1K1CA2024-01-302024-01-30
Adam Roe Painting Inc.$76.4K1ID2024-02-192024-02-19
Black Eagle Construction LLC$70.6K1ID2024-06-262024-06-26
Belfor Holdings Inc.$52.2K1MI2024-03-142024-03-14
The largest single subawards
DateToAmountFor
2024-02-12Quality Electric, Inc$2.53MELECTRICAL AND FIRE ALARM
2024-01-30Red Bear Construction LLC$697.8KSELECTIVE DEMOLITION, NON-STRUCTURAL METAL FRAMING, CARPENTRY AND ACOUSTICAL TILE.
2024-01-23Api Group Life Safety USA LLC$689.9KFIRE SUPPRESSION SYSTEM
2024-01-30Uniq Steel Inc$538.1KSPECIALTY STEEL FABRICATIONS, STRUCTURAL STEEL, AND WELDING
2024-01-03Paige Mechanical Group Inc$378.2KHVAC
2024-01-23Paige Mechanical Group Inc$248.8KPLUMBING
2024-02-19Adam Roe Painting Inc.$76.4KPAINTING AND COATINGS
2024-06-26Black Eagle Construction LLC$70.6KCONCRETE
2024-03-14Belfor USA Group Inc$52.2KABATEMENT AND SELECTIVE DEMOLITION

Every action

12 actions since 2023-09-29. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-07-21P00011Administrative change$0THIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO.
2026-07-15P00010Supplemental agreement (work within scope)$878.7KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO.
2026-01-27P00009Supplemental agreement (work within scope)$2.60MTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO.
2025-06-02P00008Supplemental agreement (work within scope)$28.8KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO.
2025-03-21P00007Additional work (new agreement)$253.2KTHIS MODIFICATION IS TO BRING SPRINKLER SYSTEM UP TO CODE, ADD BARREL ROOF RAKE BLOCKING, INSTALL CHIMNEY CAP, AND TO REMOVE AND DISPOSE OF CONCRETE CAPS AND ABANDONED STEAM PIPES.
2025-02-06P00006Change order$124.6KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO. THIS MODIFICATION ADDS FUNDS TO PROCURE FREE ZONE BARRIERS.
2025-01-31P00005Change order$205.1KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO. THIS MODIFICATION ADDS WORK TO REPLACE PURLINS, ASBESTOS ABATEMENT, UTILITY EXCAVATION, AND MOLD REMOVAL.
2024-12-03P00004Change order$67.4KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO. P00004-EQUITABLE ADJUSTMENT FOR GOVERNMENT DELAY OF WORK
2024-12-03P00003Change order$105.1KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO. P00003-ADDS A WEATHER CONTINGENCY PLAN TO CONTINUE WORK DURING WINTER.
2024-08-20P00002Additional work (new agreement)$645.3KTHIS REQUIREMENT IS FOR THE REPAIR OF AIRCRAFT HANGAR STRUCTURAL AND FIRE SUPPRESSION FOR BUILDING 201 LOCATED ON MOUNTAIN HOME AFB, IDAHO. THIS MODIFICATION ADDS WORK TO REPLACE PURLINS, ASBESTOS ABATEMENT, UTILITY EXCAVATION, AND MOLD REMOVAL.
2023-11-07P00001Change order$0REPAIR AND CONSTRUCT OF BUILDING 201 AT MOUNTAIN HOME AFB, IDAHO. P00001-THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP DUE TO DELAY IN NTP ISSUANCE.
2023-09-290$10.31MREPAIR HANGAR 201

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-23). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗