Putting the award page together from the records…
Putting the award page together from the records…
CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III)
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
118 subawards totaling $16.94M (5.6% of what was obligated), as Jpats Logistics Services, LLC reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Mantech International Corporation | $7.82M | 7 | 2025-01-22 | 2025-04-22 | |
| Textron Inc | $2.09M | 33 | KS | 2025-01-20 | 2025-04-30 |
| Rockwell Collins Australia Pty Limited | $2.00M | 1 | WV | 2025-04-23 | 2025-04-23 |
| Greenwood Group Inc | $1.59M | 24 | OK | 2025-01-13 | 2025-04-30 |
| Vse Aviation, Inc. | $1.19M | 18 | FL | 2025-01-07 | 2025-04-03 |
| Symetrics Industries, LLC | $971.0K | 25 | FL | 2025-02-06 | 2025-04-09 |
| Killinchy Aerospace Holdings Limited | $957.9K | 3 | 2025-03-12 | 2025-03-26 | |
| Air Comm Corporation LLC | $123.6K | 1 | CO | 2025-04-01 | 2025-04-01 |
| Zenith Aviation, Inc. | $65.7K | 2 | VA | 2025-04-24 | 2025-04-28 |
| Ametek Inc | $62.1K | 2 | KS | 2025-02-06 | 2025-04-07 |
| Piedmont Propulsion Systems, LLC | $39.4K | 1 | NC | 2025-03-04 | 2025-03-04 |
| Martin-Baker Aircraft Company Limited | $32.4K | 1 | PA | 2025-02-19 | 2025-02-19 |
| Date | To | Amount | For |
|---|---|---|---|
| 2025-04-23 | Pratt & Whitney Engine Services, Inc | $2.00M | ENGINE |
| 2025-01-22 | Standard Aero Limited | $1.17M | ENGINE |
| 2025-03-27 | Standard Aero Limited | $1.17M | ENGINE |
| 2025-01-22 | Standard Aero Limited | $1.17M | ENGINE |
| 2025-04-22 | Standard Aero Limited | $1.17M | ENGINE |
| 2025-04-22 | Standard Aero Limited | $1.17M | ENGINE |
| 2025-02-24 | Standard Aero Limited | $985.9K | ENGINE |
| 2025-03-28 | Standard Aero Limited | $985.9K | ENGINE |
| 2025-03-26 | Martin-Baker Aircraft Company Limited | $675.5K | BODY ASSEMBLY,FIRING UNIT, PIN ASSY FIRING CONTAINER ASSEMBLY, DROGUE CHUTE COVER, ASSY, SHEEP SKIN CUSHION ASSY,BACK PAD CUSHION, SEAT, EJECTION SEAT CUSHION FOR T6 AIRCRAFT HANDLE ASSY FIRING PARACHUTE KIT PIPE ASSY… |
| 2025-01-29 | Textron Aviation Inc | $287.8K | BOLT BRAKE KEY EXTRUSION,RUBBER, SYNTHETIC, CHLOROPRENE NUT PATCH PLATE PIN,COTTER SCREW SCREW,MACHINE STANDOFF STRAP,TIE THERMAL RELIEF PLUG |
| 2025-04-18 | Textron Aviation Inc | $285.5K | PARTS/MATERIALS |
| 2025-02-14 | Greenwood Group Inc | $218.5K | BUSHING BELLCRANK, OD 0.3152IN X LENGHT .250IN EVAPORATIVE FILTER KIT FILTER,FUEL PUMP OUTLET RIVET TAPE,ADHESIVE,RUBBER, VACCUM BAG SEALANT,OFF WHITE,400-204 DEG OP TEMP,1/8 X 1/2 X 25FT ROLL TUBING |
| 2025-03-12 | Martin-Baker Aircraft Company Limited | $218.4K | BACK PAD ASSY CONTAINER ASSEMBLY, DROGUE CHUTE HEADPAD PARACHUTE KIT |
| 2025-01-10 | Vse Aviation, Inc. | $124.3K | BATTERY (24 VOLT) |
| 2025-04-01 | Air Comm Corporation LLC | $123.6K | PARTS/MATERIALS |
| 2025-04-08 | Textron Aviation Inc | $123.0K | PARTS/MATERIALS |
| 2025-04-28 | Greenwood Group Inc | $105.8K | PARTS/MATERIALS |
| 2025-03-04 | Greenwood Group Inc | $94.0K | CABLE,STEERING (NLG) COOLER ASSY,OIL |
| 2025-02-21 | Greenwood Group Inc | $93.5K | CIRCUIT CARD ASSEMBLY COLLAR COOLER ASSY,OIL DUCT ASSY /AFT/ FACE PLATE ASSY /AFT/ HOSE ASSEMBLY,METALLIC NUT, PLAIN, HEXAGON, ELASTIC JAM NUT RELAY,ELECTROMAGNETIC SIDEWALL ASSY,UPPER AFT /R/ SIDEWALL ASSY,UPPER FWD /R/ |
| 2025-04-28 | Textron Aviation Inc | $92.0K | PARTS/MATERIALS |
| 2025-02-21 | Greenwood Group Inc | $90.2K | DUCT ASSY /FWD/ PULLEY ASSY,IDLER TRANSPARENCY,CANOPY, AFT ASSEMBLY |
| 2025-04-30 | Greenwood Group Inc | $90.2K | PARTS |
| 2025-02-25 | Vse Aviation, Inc. | $80.4K | BATTERY (24 VOLT) TIRE,MAIN LANDING GEAR TIRE,TUBELESS |
| 2025-04-10 | Greenwood Group Inc | $79.5K | PARTS/MATERIALS |
| 2025-03-13 | Vse Aviation, Inc. | $75.9K | BATTERY (24 VOLT) COVER ASSY, EXHAUST AND PROPELLER (PREFERRED) PLUG ASSY,STARTER GENERATOR |
28 actions since 2024-12-11. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-05-11 | P00028 | Supplemental agreement (work within scope) | $1.41M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-05-07 | P00027 | Supplemental agreement (work within scope) | -$9.00M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2026-04-16 | P00026 | Administrative change | $8.4K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-03-30 | P00025 | Supplemental agreement (work within scope) | $0 | CONTRACTOR OPERATED AND MAINTAINTED BASE SUPPLY SERVICES |
| 2026-03-02 | P00023 | Administrative change | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-02-23 | P00022 | Supplemental agreement (work within scope) | -$8.77M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-02-09 | P00021 | Administrative change | $344.0K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-01-29 | P00020 | Administrative change | $2.29M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2026-01-26 | P00019 | Supplemental agreement (work within scope) | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2026-01-22 | P00018 | Supplemental agreement (work within scope) | $15.27M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-12-18 | P00017 | Supplemental agreement (work within scope) | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-12-09 | P00016 | Administrative change | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2025-12-03 | P00015 | Administrative change | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY SERVICES |
| 2025-12-02 | P00014 | Administrative change | $46.39M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY |
| 2025-12-02 | P00013 | Supplemental agreement (work within scope) | -$3.5K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-11-13 | P00012 | Administrative change | $0 | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-09-30 | P00011 | Administrative change | $80.05M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-09-15 | P00010 | Supplemental agreement (work within scope) | $36.23M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-09-09 | P00009 | Administrative change | $6.00M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-07-30 | P00008 | Administrative change | -$767.6K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-07-16 | P00007 | Administrative change | $4.36M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS) III SERVICES |
| 2025-06-26 | P00006 | Administrative change | $15.64M | CONRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-06-10 | P00005 | Supplemental agreement (work within scope) | $27.05M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-05-13 | P00004 | Supplemental agreement (work within scope) | $20.0K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) |
| 2025-05-13 | P00003 | Supplemental agreement (work within scope) | -$610.5K | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) |
| 2025-04-02 | P00002 | Supplemental agreement (work within scope) | $2.10M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) SERVICES |
| 2025-01-14 | P00001 | Supplemental agreement (work within scope) | $52.62M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) |
| 2024-12-11 | 0 | $33.62M | CONTRACTOR OPERATED AND MAINTAINED BASE SUPPLY (COMBS III) |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗