FA811021F0002↗
Northrop Grumman Systems Corp received this contract from Fa8110 Aflcmc WBK-2 B-2, Department of the Air Force: $83.07M obligated so far for pressure, temperature, and humidity measuring and controlling instruments. It runs to 2026-12-18.
Key facts · data as of Oct 25, 2026
- Recipient
- Northrop Grumman Systems Corp
- Awarding agency
- Department of the Air Force (Department of Defense)
- Contracting office
- Fa8110 Aflcmc WBK-2 B-2 (FA8110)
- Obligated to date
- $83.07M
- Potential value
- $173.39M
- Ends
- 2026-12-18
Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.
Cite this page: SpendQuery, Award FA811021F0002, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_FA811021F0002_9700_FA861614D6060_9700
Northrop Grumman Systems Corp: all federal awards · Department of Defense: spending · Fa8110 Aflcmc WBK-2 B-2: what it buys · The follow-on: recompete brief
CY21 B-2 SUSTAINING ENGINEERING
Up for re-bid: ends 2026-12-18. Recompete brief →
What it is
- Product or service
- Pressure, Temperature, and Humidity Measuring and Controlling Instruments (PSC 6685)
- Industry
- Aircraft Manufacturing (NAICS 336411)
- Contracting office
- Fa8110 Aflcmc WBK-2 B-2 (FA8110)
- Competition
- Not competed
- Pricing
- Firm fixed price
- How it was bought
- Single-award IDIQ · under FA861614D6060
- Where the work is
- Los Angeles, CA · district CA-27
Obligations by fiscal year
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
Subcontractors: where the money went next
14 subawards totaling $1.36M (1.6% of what was obligated), as Northrop Grumman Systems Corp reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Westwind Engineering, Inc. | $353.0K | 1 | CA | 2023-02-07 | 2023-02-07 |
| Transdigm Group Incorporated | $220.3K | 1 | CA | 2026-06-29 | 2026-06-29 |
| Lockheed Martin Corp | $202.1K | 1 | CA | 2024-01-10 | 2024-01-10 |
| Hexcel Corp | $143.3K | 3 | AZ | 2026-04-21 | 2026-06-29 |
| Solvay | $139.8K | 2 | MD | 2024-04-29 | 2024-04-29 |
| Aerofit, LLC | $107.4K | 1 | CA | 2025-01-10 | 2025-01-10 |
| Bae Systems Information and Electronic Systems Integration Inc. | $42.9K | 1 | IN | 2024-05-21 | 2024-05-21 |
| PRC - Desoto International Inc. | $42.0K | 1 | CA | 2024-04-22 | 2024-04-22 |
| Enterprise Resource Services, Inc. | $41.7K | 1 | CA | 2022-11-02 | 2022-11-02 |
| The Boeing Company | $33.3K | 1 | OK | 2024-07-22 | 2024-07-22 |
| Integral Products, Inc. | $32.4K | 1 | CA | 2024-06-28 | 2024-06-28 |
The largest single subawards
| Date | To | Amount | For |
|---|---|---|---|
| 2023-02-07 | Westwind Engineering, Inc. | $353.0K | HUMAN RESOURCES SERV |
| 2026-06-29 | Pneudraulics, Inc. | $220.3K | OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING (SEE FOOTNOTE 7) |
| 2024-01-10 | Lockheed Martin Corporation | $202.1K | TECHNICAL SERVICES |
| 2026-04-21 | Hexcel Corp | $158.6K | PREFABRICATED METAL BUILDING AND COMPONENT MANUFACTURING |
| 2025-01-10 | Aerofit, LLC | $107.4K | OTHER METAL VALVE AND PIPE FITTING MANUFACTURING |
| 2024-04-29 | Cytec Engineered Materials Inc | $92.8K | CONTROLLED MATERIAL |
| 2024-04-29 | Cytec Engineered Materials Inc | $47.0K | CONTROLLED MATERIAL |
| 2024-05-21 | Bae Systems Information and Electronic Systems Integration Inc. | $42.9K | NONMETDETAIL/ASSY |
| 2024-04-22 | PRC - Desoto International, Inc. | $42.0K | NONMETDETAIL/ASSY |
| 2022-11-02 | Enterprise Resource Services, Inc. | $41.7K | HUMAN RESOURCES SERV |
| 2024-07-22 | The Boeing Company | $33.3K | ENGINEER. SERVICES |
| 2024-06-28 | Integral Products, Inc. | $32.4K | ADHESIVES AND SEALAN |
| 2026-04-23 | Hexcel Corp | $350 | PREFABRICATED METAL BUILDING AND COMPONENT MANUFACTURING |
| 2026-06-29 | Hexcel Corp | -$15.6K | PREFABRICATED METAL BUILDING AND COMPONENT MANUFACTURING |
Every action
81 actions since 2022-10-13. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-02-11 | P00129 | Administrative change | $0 | HWSE CY 21-24 |
| 2025-12-17 | P00128 | Administrative change | $0 | HARWARE SUSTAINMENT ENGINEERING (HWSE) - 21F0002 |
| 2025-12-17 | P00127 | Administrative change | $0 | HARDWARE SUSTAINMENT ENGINEERING (HWSE) CY21 SUSTAINING ENGINEERING |
| 2025-09-30 | P00126 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-09-25 | P00125 | Administrative change | $0 | HARDWARE SUSTAINMENT ENGINEERING (HWSE) |
| 2025-09-25 | P00124 | Administrative change | $1.51M | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-09-04 | P00123 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-08-27 | P00122 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-08-18 | P00121 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-07-29 | P00120 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-07-25 | P00118 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-07-16 | P00117 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-06-25 | P00116 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-05-27 | P00115 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-05-01 | P00114 | Administrative change | $0 | B-2 CY 21 SUSTAINING ENGINEERING |
| 2025-05-01 | P00113 | Administrative change | $0 | B-2 CY 21 SUSTAINING ENGEINEERING |
| 2025-04-29 | P00112 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-04-28 | P00111 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-04-23 | P00110 | Administrative change | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-04-17 | P00109 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2025-04-07 | P00108 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2025-04-01 | P00107 | Administrative change | $0 | CY21 -24 HARDWARE SUSTAINMENT ENGINEERING (HWSE) |
| 2025-03-26 | P00106 | Administrative change | $0 | B-2 SUSTAINING ENGINEERING |
| 2025-03-21 | P00105 | Administrative change | $0 | B-2 SUSTAINING ENGINEERING |
| 2025-02-28 | P00104 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2024-12-17 | P00102 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2024-12-04 | P00101 | Supplemental agreement (work within scope) | $0 | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-12-02 | P00100 | Supplemental agreement (work within scope) | -$3.50M | B-2 SUSTAINING ENGINEERING CY24 |
| 2024-11-19 | P00099 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2024-11-18 | A00001 | Supplemental agreement (work within scope) | $0 | SUPPLY CONTRACTS AND PRICED ORDERS |
| 2024-10-15 | P00098 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2024-09-26 | P00097 | Supplemental agreement (work within scope) | $2.31M | B-2 SUSTAINING ENGINEERING CY24 |
| 2024-09-20 | P00096 | Supplemental agreement (work within scope) | $0 | B-2 SUSTAINING ENGINEERING |
| 2024-09-20 | P00095 | Supplemental agreement (work within scope) | $2.43M | B-2 SUSTAINING ENGINEERING FY24 |
| 2024-09-05 | P00094 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2024-08-14 | P00093 | Supplemental agreement (work within scope) | $1.18M | B-2 SUSTAINING ENGINEERING |
| 2024-08-09 | P00092 | Supplemental agreement (work within scope) | $546.2K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-07-30 | P00091 | Supplemental agreement (work within scope) | $773.4K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-07-26 | P00090 | Funding only | $101.0K | B-2 SUSTAINING ENGINEERING CY22 |
| 2024-07-22 | P00089 | Supplemental agreement (work within scope) | $0 | B-2 CY21 SUSTAINING ENGINEERING |
| 2024-07-08 | P00088 | Supplemental agreement (work within scope) | $881.7K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-05-20 | P00087 | Supplemental agreement (work within scope) | -$192.0K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-04-17 | P00086 | Funding only | $13.72M | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-04-10 | P00085 | Funding only | $2.46M | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-03-18 | P00084 | Supplemental agreement (work within scope) | $289.8K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-03-15 | P00083 | Supplemental agreement (work within scope) | $123.2K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-03-15 | P00082 | Supplemental agreement (work within scope) | $8.09M | B-2 SUSTAINING ENGINEERING |
| 2024-02-29 | P00081 | Supplemental agreement (work within scope) | $409.3K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-02-08 | P00080 | Supplemental agreement (work within scope) | $187.1K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2024-01-29 | P00079 | Supplemental agreement (work within scope) | $100.0K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2023-12-19 | P00078 | Supplemental agreement (work within scope) | $0 | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2023-12-18 | P00077 | Option exercised | $7.70M | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2023-11-08 | P00076 | Supplemental agreement (work within scope) | -$100.0K | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2023-11-07 | P00075 | Supplemental agreement (work within scope) | $0 | B-2 CY21-24 SUSTAINING ENGINEERING |
| 2023-11-06 | P00074 | Supplemental agreement (work within scope) | $0 | CY21-24 B-2 SUSTAINING ENGINEERING |
| 2023-09-28 | P00073 | Supplemental agreement (work within scope) | $1.34M | CY22 B-2 SUSTAINING ENGINEERING |
| 2023-09-27 | P00072 | Supplemental agreement (work within scope) | $1.41M | CY21 HWSE DO // ETA E23022 ART FCCA |
| 2023-09-21 | P00071 | Supplemental agreement (work within scope) | $0 | CY21-24 B-2 HWSE DELIVERY ORDER // ETA E21045 - AFT DECK 2GAD POP EXTENSION |
| 2023-09-19 | P00070 | Supplemental agreement (work within scope) | $92.5K | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-09-13 | P00069 | Supplemental agreement (work within scope) | -$212.7K | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-08-30 | P00068 | Supplemental agreement (work within scope) | $804.1K | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-08-23 | P00067 | Supplemental agreement (work within scope) | $1.56M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-08-10 | P00066 | Supplemental agreement (work within scope) | $1.92M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-07-28 | P00065 | Supplemental agreement (work within scope) | $3.14M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-07-27 | P00064 | Supplemental agreement (work within scope) | $0 | CY21-24 SUSTAINING ENGINEERING PERIOD OF PERFORMANCE (POP) EXTENSION |
| 2023-06-30 | P00063 | Supplemental agreement (work within scope) | $1.90M | CY21-24 SUSTAINING ENGINEERING DO // ETA E23021 ALTERNATIVE LANDING GEAR LOCK |
| 2023-06-01 | P00062 | Supplemental agreement (work within scope) | $0 | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-05-03 | P00061 | Supplemental agreement (work within scope) | $3.43M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-04-24 | P00060 | Supplemental agreement (work within scope) | $15.48M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-04-12 | P00059 | Supplemental agreement (work within scope) | $0 | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-03-28 | P00058 | Funding only | -$230.3K | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-03-15 | P00057 | Supplemental agreement (work within scope) | $3.21M | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-02-21 | P00056 | Administrative change | $0 | CY21-24 B-2 SUSTAINING ENGINEERING // GFP REVISION TO ETA RFSU |
| 2023-02-01 | P00055 | Supplemental agreement (work within scope) | $0 | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-01-26 | P00054 | Supplemental agreement (work within scope) | $608.7K | CY21 B-2 SUSTAINING ENGINEERING |
| 2023-01-12 | P00053 | Administrative change | $0 | CY21-24 SUSTAINING ENGINEERING DO // ETA E23011 AWBS (ADMIN MOD) |
| 2022-12-20 | P00052 | Supplemental agreement (work within scope) | $248.1K | CY21-24 SUSTAINING ENGINEERING DO // ETA E23011 AWBS |
| 2022-12-12 | P00051 | Option exercised | $9.35M | CY21-24 B-2 HWSE DO (FA8110-21-F-0002) -- EXERCISE OPTION II |
| 2022-11-08 | P00050 | Supplemental agreement (work within scope) | $0 | CY21-24 SUSTAINING ENGINEERING DO / ETA E21056 PTU POP EXTENSION |
| 2022-10-13 | P00049 | Supplemental agreement (work within scope) | $0 | CY21-24 B-2 SUSTAINING ENGINEERING DO / ETA E21038 RADAR BACK-END POP EXTENSION |
| 2022-10-13 | P00048 | Supplemental agreement (work within scope) | $0 | CY21-24 B-2 SUSTAINING ENGINEERING DO // ETA E21014 DPU POP EXTENSION |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗