MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Up for re-bid: ends 2027-06-25. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
197 subawards totaling $23.36M (21.9% of what was obligated), as Ravelin Defense, Inc. reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| P&C Investments, LLC | $4.12M | 52 | AZ | 2022-10-18 | 2025-12-15 |
| The Morgan Crucible Co PLC | $2.34M | 2 | PA | 2023-01-06 | 2023-03-27 |
| Morgan Advanced Materials PLC | $1.99M | 3 | PA | 2024-03-25 | 2025-12-23 |
| Iten Defense LLC | $1.95M | 8 | OH | 2023-02-01 | 2025-03-27 |
| RWC International, LTD. | $1.84M | 3 | AZ | 2023-01-24 | 2024-05-20 |
| Applied Companies | $941.3K | 1 | CA | 2023-07-31 | 2023-07-31 |
| Mcfarland Machining | $736.3K | 11 | MN | 2022-10-10 | 2023-03-21 |
| Nguyen, Anh N | $672.9K | 6 | TX | 2022-10-18 | 2023-07-17 |
| Ellison Machinery Company of the Northwest | $602.0K | 3 | WA | 2023-02-28 | 2023-04-27 |
| H. W. Metal Products, Inc. | $591.3K | 6 | OR | 2023-02-17 | 2025-01-21 |
| Northwire, Inc | $558.9K | 2 | WI | 2022-11-01 | 2024-11-21 |
| LCR Services LLC | $460.9K | 7 | AZ | 2022-10-07 | 2023-04-03 |
| Pacific Bearing Company | $459.0K | 2 | IL | 2022-10-25 | 2023-03-21 |
| Transdigm Group Incorporated | $429.6K | 4 | AZ | 2022-12-29 | 2023-04-28 |
| Rollon Corporation | $373.1K | 6 | NJ | 2023-01-25 | 2025-01-30 |
| Heico Corp | $365.6K | 3 | AZ | 2025-01-17 | 2025-11-03 |
| KPS Capital Partners, LP | $339.1K | 1 | IN | 2023-01-09 | 2023-01-09 |
| Hydraulic Controls, Inc. | $310.7K | 6 | CA | 2022-12-13 | 2025-02-28 |
| Griffiths Holding Corporation | $253.0K | 6 | WI | 2022-10-03 | 2025-01-17 |
| Innovative Machining, LLC | $247.9K | 4 | WI | 2024-02-21 | 2025-02-03 |
| Ducworks Inc | $236.4K | 2 | UT | 2022-12-07 | 2023-03-16 |
| Parker-Hannifin Corporation | $222.8K | 2 | MA | 2023-01-25 | 2023-08-07 |
| Novavax Inc | $211.9K | 3 | MD | 2023-01-13 | 2024-01-11 |
| Samuel, Son & Co. (USA) Inc. | $210.5K | 2 | AZ | 2022-11-22 | 2023-02-17 |
| Ace Industries, Inc. | $197.9K | 2 | GA | 2024-11-06 | 2025-01-24 |
The 25 largest of 66; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-01-24 | RWC International LLC | $1.75M | COTS - PTR. |
| 2023-01-06 | Morgan Advanced Materials and Technology, Inc. | $1.62M | CERAMICS - PTR. |
| 2024-03-25 | Morgan Advanced Materials and Technology, Inc. | $1.44M | CERAMICS - PTR |
| 2023-07-31 | Applied Companies | $941.3K | ENVIRONMENTAL CONTROL UNIT - COTS |
| 2023-03-27 | Morgan Advanced Materials and Technology, Inc. | $722.7K | CERAMICS - SECURITY |
| 2023-06-12 | Iten Defense LLC | $624.8K | TRANSPARENT ARMOR - PTR |
| 2022-11-01 | Northwire, Inc | $374.6K | ELECTRO-MECHANICAL - PTR. |
| 2025-03-27 | Iten Defense LLC | $354.7K | TRANSPARENT ARMOR - PTR |
| 2023-01-09 | Dexter Axle Company | $339.1K | SUBASSEMBLY - PTR. |
| 2023-03-21 | Pacific Bearing Company | $331.9K | MACHINED METAL PARTS - SEATS |
| 2023-04-27 | Ellison Machinery Company of the Northwest | $323.4K | MACHINERY - SHOP SUPPLIES |
| 2025-12-23 | Morgan Advanced Materials and Technology, Inc. | $297.9K | CERAMICS - PTR |
| 2023-07-17 | Nguyen, Anh N | $296.5K | FLAT METAL COMP - PTR MACHINED METAL PARTS - PTR |
| 2024-08-26 | Iten Defense LLC | $271.6K | COMPOSITE - ARMOR |
| 2025-01-23 | Morgan Advanced Materials and Technology, Inc. | $256.3K | CERAMICS - PTR |
| 2025-01-17 | Robertson Fuel Systems, L.L.C. | $238.8K | BALLISTIC FUEL TANKS |
| 2024-10-16 | Iten Defense LLC | $236.5K | TRANSPARENT ARMOR - PTR |
| 2022-10-10 | Mcfarland Machining | $184.6K | MACHINED METAL PART & FABRICATED WELDMENT - SEATS. |
| 2024-11-21 | Northwire, Inc | $184.3K | ELECTRO-MECHANICAL - PTR |
| 2024-01-08 | H. W. Metal Products, Inc. | $181.9K | MACHINED METAL PART - PTR |
| 2023-02-01 | Iten Defense LLC | $173.2K | COMPOSITE - ARMOR & PTR. |
| 2024-01-15 | P&C Investments, LLC | $165.4K | FABRICATED WELDMENT - PTR |
| 2023-02-28 | Ellison Machinery Company of the Northwest | $161.8K | MACHINERY. |
| 2023-02-17 | Samuel, Son & Co. (USA) Inc. | $157.7K | MACHINED METAL PARTS & FLAT METAL COMP - PTR. |
| 2024-10-16 | Iten Defense LLC | $157.7K | TRANSPARENT ARMOR - PTR |
34 actions since 2022-10-07. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-16 | P00055 | Administrative change | $0 | PTR PRODUCTION PROGRAM. . MOD FA820419C0005 P00055 IS TO CHANGE THE DD 254. NO OTHER CHANGE HAS OCCURRED RAVELIN DEFENSE, INC. HAS BEEN UPDATED IN SAM.GOV WITH THE SAME |
| 2026-05-20 | P00054 | Administrative change | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. AMENDMENT TO CORPORATE NAME ONLY CHANGE AND ALL RIGHTS AND OBLIGATIONS OF THE GOVERNMENT AND OF THE CONTRACTOR. ADD SECTION J RAVELIN DEFENSE. |
| 2026-04-13 | P00053 | Administrative change | $4.12M | LGM-30G PTR PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT P00053 TO NCREASE CLINS 9101, 9102, 9103, AND 9104. ADD ONE PTT TRACTOR, ENGINEERING TO ADAPT ARMAMENT FOR A NEW MODEL TRACTOR, TRAVEL AND MATERIAL REQUIRED FOR ONE TRACTOR (PTT). |
| 2026-02-13 | P00052 | Administrative change | $3.59M | PTR THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00052 IS DESCRIBED BELOW AND CHANGED IN SECTION B. ADD CLINS 9030, 9111, 9112, 9112AA, 9112AB, 9113, 9117, 9117AA, 9117AB, 9117AC, 9117AD, 9117AE, 9119, 9120, 9122, 9126, AND 9127 TO… |
| 2025-12-18 | P00051 | Administrative change | $8.19M | (PTR) THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00051 TO ADD CLINS 9101-9110 TO ADD OPTION 10. FOR ONE (1) EACH PTR TRAILER NSN 1450-01-691-7548. POP DEL. DATES FOR OPTION 10 CLINS - 12-18-25 THROUGH 6-25-27. |
| 2025-08-26 | P00050 | Administrative change | $234.9K | LGM-30G PTR) PRODUCTION PROGRAM. CLIN 8006 TO EXTEND POP. ADD SPARES TO BE PURCHASED. EXTEND POP FOR SEVERAL CLINS DUE TO GOV. CAUSED DELAYS. |
| 2025-08-14 | P00049 | Administrative change | $3.06M | MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| 2025-03-19 | P00048 | Administrative change | $0 | MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| 2024-12-09 | P00047 | Administrative change | $1.95M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUND DELAYED FSR FIELDING AND ASSOCIATED COSTS. FUND FSR CDL LICENSES. FUND SLICWAVE & NAVISTAR TRAINING. |
| 2024-09-25 | P00046 | Administrative change | $0 | LGM-30G PTR PRODUCTION PROGRAM. DELETE THE PURPOSE OF THE MODIFICATION FA820419C0005 P00046 IS TO: DELETE CLAUSES DUE TO THE CONTRACT CHANGING THE NAICS CODE FROM 336120 TO 336992. CLAUSES 252.219-7003, 252.219-7003, 52.219-16, 52.219-9, 52.219-9, 52.230-2,… |
| 2024-09-13 | P00045 | Administrative change | $472.0K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. P00045 TO FUND $125,178.64 FOR TRAVEL CLIN 5004 FOR MALMSTROM PTR TRAINING, AND CLIN 5009 TRAINING COST FOR MALMSTOM TO THE AMOUNT OF $346,784.74. |
| 2024-08-14 | P00044 | Administrative change | $260.6K | LGM-30G (PTR) PRODUCTION PROGRAM. MOD P00044 IS TO INCR. FUNDING FOR CLIN 5009. CLIN 5009 INC. DUE TO DESIGN CHANGES REQUIRING ADTL TRAINING FOR SCOPE CHANGE. EXT. THE POP DEL. FOR CLINS 7001 THROUGH 7009. NO COST POP EXTENSION. EXT. REQUESTED BY AWE FOR… |
| 2024-07-31 | P00043 | Administrative change | $1.27M | LGM-30G PTR) PRODUCTION PROGRAM. MOD P00043 TO ADD & FUND CLIN'S 7020, 7021, 9015, 9016 AND 9017. INCR. CLIN 7002 & 8002 DUE TO INFLATION. INCR. CLIN 7015 FOR PTR/ECU/APU EXERCISE & MAINTENANCE. UPDATE PER MOD A00001 FROM DCMA. |
| 2024-07-19 | A00001 | Funding only | -$150.4K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| 2024-06-26 | P00042 | Administrative change | $738.2K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FOR FA820419C0005 P00042 IS TO ADD AND FUND CLIN 9006. CLIN 9006 IS SPARES STORAGE COSTS FOR 12 MONTHS. FUND CLIN 3006 FOR THE LOT PURCHASE OF SPARES PTR. ADD SECTION J OFFICIAL PTR… |
| 2024-06-06 | P00041 | Administrative change | $845.7K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00041 TO ADD AND FUND CLIN'S 9012, 9013, 9014, 9019, 9020, AND 9022 FOR (FSR) REQUIREMENTS FOR F.E. WARREN. CLIN 9022 IS TO ACQUIRE 6 (ECU) BENCH TESTERS. |
| 2024-05-16 | P00040 | Administrative change | $454.8K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD P00040 TO DEOB. CLIN 0001, OBLIGATE FOR INFLATION FOR ECU'S AND TRACTORS. PURCHASE EMD EVALUATION, AND SPARE TRANSPARENT ARMOR. CHG ORIGIN ORIGIN TO ORIGIN DESTINATION. |
| 2024-01-25 | P00039 | Administrative change | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00039 IS BEING PERFORMED TO UPDATE THE PERIOD OF PERFORMANCE (POP) AS FOLLOWS: NO COST PERIOD OF PERFORMANCE EXTENSION… |
| 2023-12-14 | P00038 | Administrative change | $15.07M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. EXERCISE OPTION 9 AND FUND. ADD $1,195,353.36 TO COVER INFLATION INCREASES ($808,622.87) AND SCRAP ALLOWANCE ($386,730.49). REALIGN FUNDS TO COVER OVERRUNS AND UNDERRUNS FOR THE BASIC YEAR. |
| 2023-11-29 | P00037 | Administrative change | $1.16M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FA820419C0005 P00037 TO OBLIGATE FUNDING CLIN'S 5002, 6002 7002 AND 8002 FOR MATRL. OVERRUN SCRAP COSTS. CHANGE ADMIN BY DODAAC S0302A. |
| 2023-11-09 | P00036 | Administrative change | $1.34M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. IS TO FUND CLIN'S 5002 & 6002 TO COVER MATL. SCRAP COSTS & CLIN 3002 FOR MATL, SCRAP COST $375,559.37 AND OPTION 3 MATL. INFLATION COST $670,363.19. |
| 2023-10-30 | P00035 | Administrative change | $13.85M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. POP EXT. 1104, 7012-7017. ADD WARRANTY MEMORANDUM. EXERCISE OPTION 3 FOR 11-1-2023 TO 6-30-2025. |
| 2023-08-31 | P00034 | Administrative change | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. NO COST PERIOD OF PERFORMANCE EXTENSION FOR OPTION 4 PERIOD OF PERFORMANCE FOR CLIN'S 4001, 4002, 4003, 4004, 4005, 4006, 4007, AND 4008 ARE EXTENDED FROM 8-31-23 TO 10-31-23. |
| 2023-07-25 | P00033 | Administrative change | $57.0K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT FA820419C0005 P00033 IS PERFORMED TO ADD THE PURCHASE OF 4 EACH SPARE SILENTDRIVE AXLES (2 SETS). ADD CLIN 7017. |
| 2023-07-12 | P00032 | Administrative change | $1.18M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00032 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS… |
| 2023-06-29 | P00031 | Administrative change | $21.57M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT P00023 IS BEING PERFORMED ADD FUNDING FOR OPTION 8 WITH INFLATIONARY INCREASE FOR MATERIAL. |
| 2023-06-12 | P00030 | Administrative change | $806.9K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP)7001, 7002 & 7003. CLIN 7012 INCREASE QTY TO 14. FUND CLIN 7011AB.ADD CLIN 7015. POP FROM 5-5-23 TO 8-31-23 & 11-18-23 TO 1-31-24. |
| 2023-05-12 | P00029 | Administrative change | $748.4K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00029 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS… |
| 2023-04-18 | P00028 | Administrative change | $2.89M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD TO FUND SCRAP, NST MFG AND DEVELOPMENT, STORAGE COST FOR AXLES AND TRACTORS, FUNDING FOR 7 ADDITIONAL AXLES AND ENG. COSTS. |
| 2023-01-03 | P00027 | Administrative change | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM, MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00027 TO CORRECT AN INDADVERTENT SYSTEM ERROR THAT CHANGED THE CONTRACT RATING FROM THE ORIGINAL DX TO DO. THIS MODIFICATION CORRECTS TO THE… |
| 2022-12-20 | P00026 | Option exercised | $1.72M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00026 IS BEING PERFORMED TO ADD AND FUND CLIN 7009, AND ADD ADDITIONAL FUNDING ON CLIN 0012. POP) FOR OPTION 2 FROM 31 DECEMBER 2022 TO 31 MARCH 2023. CLIN'S 3002, 8002 AND 9002… |
| 2022-11-14 | P00025 | Option exercised | $21.41M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00025 IS BEING PERFORMED TO EXERCISE ALL CLIN'S ASSOCIATED WITH OPTION 7 AND TO FULLY FUND CLIN'S 7001 THROUGH 7005. |
| 2022-11-02 | P00024 | Option exercised | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM POP CHANGE. |
| 2022-10-07 | P00023 | Option exercised | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM THE PURPOSE OF THE MODIFICATION IS TO EXTEND THE POP END DATE FOR CLINS 2001, 2002, AND 2006 FROM 10 OCTOBER 2022 TO 31 DECEMBER 2022. |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗