FA861625FB003↗

Northrop Grumman Systems Corp received this contract from Fa8616 Aflcmc WBZK B2, Department of the Air Force: $12.78M obligated so far for airframe structural components. Its period of performance ended 2025-11-30.

Key facts · data as of Oct 25, 2026

Recipient
Northrop Grumman Systems Corp
Awarding agency
Department of the Air Force (Department of Defense)
Contracting office
Fa8616 Aflcmc WBZK B2 (FA8616)
Obligated to date
$12.78M
Potential value
$16.84M
Ends
2025-11-30

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award FA861625FB003, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_FA861625FB003_9700_FA861624DB001_9700

ACS 4.0 PRODUCTION INSTALL

Delivery Order · Department of the Air Force · to Northrop Grumman Systems Corp (UEI JRVLDEXMYDK8) · data as of 2026-10-25

Obligated to date$12.78M13 actions
Current value$12.78Mwith options exercised
Potential value$16.84Mif every option is used
Period2024-11-01 → 2025-11-30current end date
Passed on$1.39Mto 5 subcontractors

What it is

Product or service
Airframe Structural Components (PSC 1560)
Industry
Aircraft Manufacturing (NAICS 336411)
Contracting office
Fa8616 Aflcmc WBZK B2 (FA8616)
Competition
Not competed
Pricing
Firm fixed price
How it was bought
Single-award IDIQ · under FA861624DB001
Where the work is
Los Angeles, CA · district CA-27

Obligations by fiscal year

FY2025$8.74M
FY2026$4.04M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

12 subawards totaling $1.39M (10.9% of what was obligated), as Northrop Grumman Systems Corp reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Roc-Aire Corp.$926.0K2CA2024-12-092025-04-04
Times Microwave Systems Inc$484.7K3AZ2024-12-182024-12-18
Wiremasters, Inc.$46.4K1TN2025-02-052025-02-05
Jackson Aerospace, Inc.$16.7K3CA2025-03-062025-03-06
Majestic12 Electronics, Inc.-$83.9K3CA2025-02-252025-02-25
The largest single subawards
DateToAmountFor
2025-04-04Roc-Aire Corp.$653.7KPRECISION TURNED PRODUCT MANUFACTURING
2024-12-09Roc-Aire Corp.$272.4KPRECISION TURNED PRODUCT MANUFACTURING
2024-12-18Times Microwave Systems Inc$195.2KELECTRONIC CONNECTOR MANUFACTURING
2024-12-18Times Microwave Systems Inc$144.7KELECTRONIC CONNECTOR MANUFACTURING
2024-12-18Times Microwave Systems Inc$144.7KELECTRONIC CONNECTOR MANUFACTURING
2025-02-25Majestic12 Electronics, Inc.$142.6KOTHER ELECTRONIC COMPONENT MANUFACTURING
2025-03-06Jackson Aerospace, Inc.$56.0KOTHER ELECTRONIC COMPONENT MANUFACTURING
2025-02-05Wiremasters, Inc.$46.4KFIBER OPTIC CABLE MANUFACTURING
2025-03-06Jackson Aerospace, Inc.-$19.7KOTHER ELECTRONIC COMPONENT MANUFACTURING
2025-03-06Jackson Aerospace, Inc.-$19.7KOTHER ELECTRONIC COMPONENT MANUFACTURING
2025-02-25Majestic12 Electronics, Inc.-$113.3KOTHER ELECTRONIC COMPONENT MANUFACTURING
2025-02-25Majestic12 Electronics, Inc.-$113.3KOTHER ELECTRONIC COMPONENT MANUFACTURING

Every action

13 actions since 2024-11-01. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-07-01P00012Supplemental agreement (work within scope)$0ACS 4.0 PRODUCTION INSTALL TO EXTEND PERIOD OF PERFORMANCE (POP) ON CLINS 1610AC - 1610AF AND 1620.
2026-04-20P00011Administrative change$40.6KACS 4.0 PRODUCTION INSTALL TO EXTEND PERIOD OF PERFORMANCE (POP) ON CLINS 1610AC - 1610AF AND 1620.
2026-03-31P00010Administrative change$0ACS 4.0 PRODUCTION INSTALL
2026-02-17P00009Administrative change$0ACS 4.0 PRODUCTION INSTALL
2026-01-20P00008Supplemental agreement (work within scope)$0ACS 4.0 PRODUCTION INSTALL
2025-12-19P00007Administrative change$0ACS 4.0 PRODUCTION INSTALL
2025-12-03P00006Administrative change$0ACS 4.0 PRODUCTION INSTALL
2025-11-24P00005Option exercised$4.00MACS 4.0 PRODUCTION INSTALL
2025-10-30P00004Supplemental agreement (work within scope)$0ACS 4.0 PRODUCTION INSTALL
2025-08-06P00003Administrative change$0ACS 4.0 PRODUCTION INSTALL
2025-02-10PZ0002Change order definitized$5.37MACS 4.0 PRODUCTION INSTALL
2024-11-18P00001Administrative change$0ACS 4.0 PRODUCTION INSTALL
2024-11-010$3.37MACS 4.0 PRODUCTION INSTALL

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗