FA865625FB002↗

Raytheon Company received this contract from Fa8656 Aflcmc Ebx, Department of the Air Force: $44.85M obligated so far for miscellaneous ammunition. It runs to 2028-10-01.

Key facts · data as of Oct 25, 2026

Recipient
Raytheon Company
Awarding agency
Department of the Air Force (Department of Defense)
Contracting office
Fa8656 Aflcmc Ebx (FA8656)
Obligated to date
$44.85M
Potential value
$132.72M
Ends
2028-10-01

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 25, 2026.

Cite this page: SpendQuery, Award FA865625FB002, data as of Oct 25, 2026, https://spendquery.com/award?id=CONT_AWD_FA865625FB002_9700_FA865621DA004_9700

HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.

Delivery Order · Department of the Air Force · to Raytheon Company (UEI VTEWM5QSE598) · data as of 2026-10-25

Obligated to date$44.85M12 actions
Current value$132.72Mwith options exercised
Period2024-10-01 → 2028-10-01current end date
Passed on$3.55Mto 8 subcontractors

Up for re-bid: ends 2028-10-01. Recompete brief →

What it is

Product or service
Miscellaneous Ammunition (PSC 1395)
Industry
Ammunition (Except Small Arms) Manufacturing (NAICS 332993)
Contracting office
Fa8656 Aflcmc Ebx (FA8656)
Competition
Full and open competition · 1 offer received
Pricing
Cost plus fixed fee
How it was bought
Multiple-award IDIQ · under FA865621DA004
Where the work is
Pima, AZ · district AZ-07

Obligations by fiscal year

FY2025$22.00M
FY2026$22.85M

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

9 subawards totaling $3.55M (7.9% of what was obligated), as Raytheon Company reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Keysight Technologies, Inc.$1.35M1CO2025-06-202025-06-20
Pioneer Circuits, Inc$590.0K1CA2026-06-242026-06-24
Kratos Systems and Solutions, Inc.$491.3K1CO2025-06-302025-06-30
Teradyne Inc$395.2K2MA2025-05-152025-06-12
Teamvantage Molding, LLC$303.1K1MN2026-06-232026-06-23
Hiller Measurements Inc$213.0K1TX2025-03-282025-03-28
Materion Corporation$110.8K1MA2026-07-022026-07-02
Praxis Resources Inc$103.2K1AZ2025-06-092025-06-09
The largest single subawards
DateToAmountFor
2025-06-20Keysight Technologies Inc$1.35MMAJOR ASSEMBLIES,SERVICES: NONPRODUCT.
2026-06-24Pioneer Circuits, Inc$590.0KNRE - TOOLING
2025-06-30Kratos S1, Inc.$491.3KMAJOR ASSEMBLIES.
2025-06-12Teradyne, Inc.$336.9KWIRE, CABLE,MAJOR ASSEMBLIES,COMPUTER HARDWARE.
2026-06-23Teamvantage Molding, LLC$303.1KNRE - TOOLING,NRE - ALL
2025-03-28Hiller Measurements Inc$213.0KMAJOR ASSEMBLIES.
2026-07-02Materion Precision Optics and Thin Film Coatings Inc$110.8KNRE - TOOLING,NRE - ALL
2025-06-09Praxis Resources Inc$103.2KMAJOR ASSEMBLIES.
2025-05-15Teradyne, Inc.$58.2KMAJOR ASSEMBLIES.

Every action

12 actions since 2024-10-02. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-04-07P00011Funding only$19.50MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2026-03-17P00010Funding only$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2026-02-13P00009Funding only$3.00MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2026-01-29P00008Supplemental agreement (work within scope)$350.0KHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2025-08-25P00007Funding only-$10.00MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2025-08-05P00006Supplemental agreement (work within scope)$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2025-07-21P00005Supplemental agreement (work within scope)$2.00MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2025-02-04P00004Administrative change$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2024-12-30P00003Supplemental agreement (work within scope)$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2024-11-22P00002Supplemental agreement (work within scope)$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2024-10-16P00001Funding only$10.00MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
2024-10-020$20.00MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-25). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗