FA868223FB007↗

Lockheed Martin Corporation received this contract from Fa8682 Aflcmc Ebjk, Department of the Air Force: $19.53M obligated so far for guided missile systems, complete. Its period of performance ended 2026-09-30.

Key facts · data as of Oct 26, 2026

Recipient
Lockheed Martin Corporation
Awarding agency
Department of the Air Force (Department of Defense)
Contracting office
Fa8682 Aflcmc Ebjk (FA8682)
Obligated to date
$19.53M
Potential value
$19.55M
Ends
2026-09-30

Source: USAspending.gov prime award records (obligations: money committed, not outlays), data as of Oct 26, 2026.

Cite this page: SpendQuery, Award FA868223FB007, data as of Oct 26, 2026, https://spendquery.com/award?id=CONT_AWD_FA868223FB007_9700_FA868222DB001_9700

JOINT AIR-TO-SURFACE STANDOFF MISSILE

Delivery Order · Department of the Air Force · to Lockheed Martin Corporation (UEI H7PNSVNN5827) · data as of 2026-10-26

Obligated to date$19.53M23 actions
Current value$19.55Mwith options exercised
Period2023-01-27 → 2026-09-30current end date
Passed on$1.17Mto 4 subcontractors

Up for re-bid: ends 2026-09-30. Recompete brief →

What it is

Product or service
Guided Missile Systems, Complete (PSC 1425)
Industry
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing (NAICS 336419)
Contracting office
Fa8682 Aflcmc Ebjk (FA8682)
Competition
Not competed
Pricing
Cost plus fixed fee
How it was bought
Single-award IDIQ · under FA868222DB001
Where the work is
Orange, FL · district FL-10

Obligations by fiscal year

FY2023$14.04M
FY2024$5.49M
FY2025$0
FY2026$0

SpendQuery holds FY2023 on; earlier years are on USAspending.gov.

Subcontractors: where the money went next

4 subawards totaling $1.17M (6.0% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.

SubcontractorAmountSubawardsWhereFirstLast
Enersys$981.1K1PA2024-09-112024-09-11
JRM Technologies Inc$100.0K1FL2023-12-062023-12-06
Strictly Technology, LLC$48.6K1FL2023-04-132023-04-13
Parker-Hannifin Corporation$36.7K1GA2023-10-312023-10-31
The largest single subawards
DateToAmountFor
2024-09-11Enersys Advanced Systems Inc$981.1KACCEPTANCE TEST REPORTS AND ATDR (SDRL6) BUILD AND REDESIGN AND ATP TESTING DVT TESTING & SDRL 1 THRU 8 (LESS SDRL6)
2023-12-06JRM Technologies Inc$100.0KCHIMAERA SOFTWARE JRM SIL MACHINE
2023-04-13Strictly Technology, LLC$48.6KBUSINESS SOFTWARE LICENSES.
2023-10-31Parker-Hannifin Corporation$36.7KJASSM PAL ALTERNATIVE EVAL VALIDITY EXTE JASSM PAL SRI ALT EVAL VALIDITY EXTNSION

Every action

23 actions since 2023-01-26. Each is a modification or amendment with the money it added or took back.

DateModificationKindAmountWhat the agency wrote
2026-04-22P00022Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2025-10-20P00021Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2025-01-23P00020Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-12-06P00019Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-11-27P00018Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-10-17P00017Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-07-17P00016Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-04-25P00015Supplemental agreement (work within scope)$0TO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-03-07P00014Supplemental agreement (work within scope)$0JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) PRODUCTION ENGINEERING SUPPORT
2024-02-27P00013Supplemental agreement (work within scope)$0JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) PRODUCTION ENGINEERING SUPPORT 6.0
2024-02-14P00012Supplemental agreement (work within scope)$683.0KJOINT AIR TO SURFACE STANDOFF MISSILE PRODUCTION 6.0 TECHNICAL DIRECTION LETTER
2024-01-22P00011Supplemental agreement (work within scope)$2.18MTO AWARD PRODUCTION ENGINEERING SUPPORT 6.0 AND FUND SYSTEM ENGINEERING SUPPORT 6.0 TDL
2024-01-17P00010Supplemental agreement (work within scope)$1.40MJOINT-AIR-TO-SURFACE STANDOFF MISSILE (JASSM) NEW LITHIUM ION(LI-ION) CELL AND NEW BATTERY MANAGEMENT SYSTEM (BMS) DESIGN VERIFICATION TEST (DVT) TECHNICAL DIRECTION LETTER (TDL)
2024-01-16P00009Supplemental agreement (work within scope)$375.7KJOINT-AIR-TO-SURFACE STANDOFF MISSILE (JASSM) FLIGHT TERMINATION SYSTEM REPORT TECHNICAL DIRECTION LETTER
2023-10-19P00008Supplemental agreement (work within scope)$853.9KJOINT AIR-TO-SURFACE STANDOFF MISSILE
2023-10-05P00007Administrative change$0JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) PROD ENG SUP 6.0
2023-09-29P00006Supplemental agreement (work within scope)$577.4KJOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) PROD ENG SUPPORT 6.0
2023-09-29P00005Supplemental agreement (work within scope)$299.0KJOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM) PAL VALIDATION TESTING AND EMULATION OPTIONS
2023-09-27P00004Supplemental agreement (work within scope)$0JOINT AIR TO SURFACE STANDOFF MISSILE (JASSM)
2023-08-17P00003Supplemental agreement (work within scope)$0JOINT AIR TO SURFACE STANDOFF MISSILE
2023-06-23P00002Supplemental agreement (work within scope)$109.6KJOINT AIR-TO-SURFACE STANDOFF MISSILE PROGRAM'S SUPPORT OF LMMFC AND RMS ATTENDANCE AT THE RAAF MISSION PLANNING TECHNICAL INTERCHANGE MEETING (TIM) AT EGLIN AFB
2023-05-02P00001Supplemental agreement (work within scope)$338.4KJOINT AIR TO SURFACE STANDOFF MISSILE
2023-01-260$12.72MJOINT AIR-TO-SURFACE STANDOFF MISSILE

Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-26). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗