GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Up for re-bid: ends 2026-11-30. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
No subawards reported for this award. Primes report subawards of $30,000 or more; many awards have none.
142 actions since 2022-10-26. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-24 | P00497 | Change order | $8.94M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-06-18 | P00495 | Supplemental agreement (work within scope) | $3.40M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-06-15 | P00496 | Supplemental agreement (work within scope) | $300.0K | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-05-14 | P00494 | Funding only | $10.30M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM BLOCK 1 |
| 2026-05-06 | P00493 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2026-04-20 | P00492 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| 2026-04-01 | P00489 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL SUPPORT |
| 2026-03-31 | P00490 | Change order | $9.00M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-03-23 | P00488 | Funding only | $2.12M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-03-18 | P00487 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-02-25 | P00486 | Funding only | $1.39M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-02-25 | P00486 | Funding only | $13.50M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-02-23 | P00484 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2026-01-20 | P00483 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| 2025-12-11 | P00482 | Funding only | $319.3K | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-12-11 | P00482 | Funding only | $11.50M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-12-08 | P00481 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2025-12-02 | P00480 | Funding only | $5.60M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2025-12-02 | P00480 | Funding only | $23.31M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2025-11-25 | P00473 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-11-20 | P00479 | Funding only | $12.00M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-11-05 | P00478 | Funding only | $4.92M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-10-20 | P00476 | Funding only | $3.39M | NEXT GENERATION OPERATIONAL SYSTEM |
| 2025-10-01 | P00475 | Administrative change | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-09-22 | P00472 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-09-22 | P00471 | Supplemental agreement (work within scope) | $375.0K | ADDING SATELLITE SPECIFICATIONS |
| 2025-09-08 | P00470 | Funding only | $3.68M | ADDING SATELLITE SPECIFICATIONS |
| 2025-08-29 | P00469 | Administrative change | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-08-29 | P00468 | Change order | $22.74M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-08-25 | P00467 | Supplemental agreement (work within scope) | $0 | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-08-11 | P00465 | Funding only | $68.2K | ADDING SATELLITE SPECIFICATIONS |
| 2025-08-11 | P00465 | Funding only | -$999 | ADDING SATELLITE SPECIFICATIONS |
| 2025-08-06 | P00466 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2025-07-29 | P00464 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2025-07-17 | P00463 | Funding only | $5.50M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-07-17 | P00463 | Funding only | $9.50M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-07-01 | P00461 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-06-26 | P00462 | Supplemental agreement (work within scope) | $3.87M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-06-26 | P00462 | Supplemental agreement (work within scope) | $2.19M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-06-17 | P00460 | Supplemental agreement (work within scope) | $1.55M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-06-17 | P00460 | Supplemental agreement (work within scope) | -$1.55M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2025-06-12 | P00459 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM INTERIM CONTRACTOR SUPPORT |
| 2025-05-28 | P00458 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-05-23 | P00457 | Funding only | $1.57M | ADDING SATELLITE SPECIFICATIONS |
| 2025-05-23 | P00457 | Funding only | $41.25M | ADDING SATELLITE SPECIFICATIONS |
| 2025-05-22 | P00454 | Supplemental agreement (work within scope) | $0 | INTERIM CONTRACTOR SUPPORT |
| 2025-05-06 | P00456 | Supplemental agreement (work within scope) | $3.65M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| 2025-04-25 | P00455 | Supplemental agreement (work within scope) | $1.60M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| 2025-04-25 | P00455 | Supplemental agreement (work within scope) | -$1.60M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| 2025-04-14 | P00449 | Administrative change | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2025-03-27 | P00452 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2ADMINISTRATIVE CLAUSE UPDATES FOR NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| 2025-03-26 | P00451 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| 2025-03-20 | P00453 | Funding only | $30.32M | ADDING SATELLITE SPECIFICATIONS |
| 2025-03-05 | P00447 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2025-03-03 | P00442 | Supplemental agreement (work within scope) | $573.6K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-02-25 | P00448 | Funding only | $3.10M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-02-14 | P00446 | Funding only | $2.70M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-02-12 | P00445 | Supplemental agreement (work within scope) | -$3.10M | ADDING SATELLITE SPECIFICATIONS |
| 2025-02-05 | P00444 | Supplemental agreement (work within scope) | $10.50M | ADDING SATELLITE SPECIFICATIONS |
| 2025-02-05 | P00444 | Supplemental agreement (work within scope) | $500.0K | ADDING SATELLITE SPECIFICATIONS |
| 2025-01-30 | P00443 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2025-01-15 | P00441 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2024-12-23 | P00440 | Supplemental agreement (work within scope) | $1.45M | ADDING SATELLITE SPECIFICATIONS |
| 2024-12-23 | P00440 | Supplemental agreement (work within scope) | $11.20M | ADDING SATELLITE SPECIFICATIONS |
| 2024-11-27 | P00439 | Change order | $21.00M | INTERIM CONTRACTOR SUPPORT (ICS) UNPRICED CHANGE ORDER (UCO) |
| 2024-11-20 | P00438 | Supplemental agreement (work within scope) | $4.30M | ADDING SATELLITE SPECIFICATIONS |
| 2024-11-18 | P00438 | Supplemental agreement (work within scope) | $16.00M | ADDING SATELLITE SPECIFICATIONS |
| 2024-10-30 | P00437 | Supplemental agreement (work within scope) | $9.10M | ADDING SATELLITE SPECIFICATIONS |
| 2024-10-30 | P00437 | Supplemental agreement (work within scope) | $8.90M | ADDING SATELLITESSPECIFICATIONS |
| 2024-10-21 | P00436 | Administrative change | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-10-01 | P00434 | Supplemental agreement (work within scope) | $19.40M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-10-01 | P00434 | Supplemental agreement (work within scope) | $6.60M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-09-27 | P00435 | Supplemental agreement (work within scope) | -$2.26M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| 2024-09-16 | P00429 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-09-13 | P00433 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-09-06 | P00432 | Supplemental agreement (work within scope) | $8.87M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-09-06 | P00432 | Supplemental agreement (work within scope) | $13.5K | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-08-29 | P00431 | Supplemental agreement (work within scope) | $3.33M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2024-08-26 | P00430 | Supplemental agreement (work within scope) | $248.6K | ADDING SATELLITE SPECIFICATIONS |
| 2024-08-26 | P00430 | Supplemental agreement (work within scope) | -$248.6K | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2024-08-19 | P00428 | Supplemental agreement (work within scope) | $915.0K | ADDING SATELLITE SPECIFICATIONS |
| 2024-08-19 | P00428 | Supplemental agreement (work within scope) | $2.00M | ADDING SATELLITE SPECIFICATIONS |
| 2024-08-07 | P00427 | Supplemental agreement (work within scope) | $1.00M | ADDING SATELLITE SPECIFICATIONS |
| 2024-08-07 | P00427 | Supplemental agreement (work within scope) | $9.06M | ADDING SATELLITE SPECIFICATIONS |
| 2024-07-29 | P00426 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2024-07-03 | P00425 | Supplemental agreement (work within scope) | $13.88M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT. ADDING SATELLITE SPECIFICATIONS. CLIN 0102 PROVISIONAL OVERRUN |
| 2024-06-24 | P00424 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS. |
| 2024-05-29 | P00423 | Supplemental agreement (work within scope) | $23.72M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS |
| 2024-05-29 | P00423 | Supplemental agreement (work within scope) | $2.22M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS |
| 2024-05-16 | P00422 | Supplemental agreement (work within scope) | $13.11M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2024-05-02 | P00421 | Supplemental agreement (work within scope) | $781.9K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-04-29 | P00420 | Supplemental agreement (work within scope) | $11.55M | ADDING SATELLITE SPECIFICATIONS |
| 2024-04-23 | P00419 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-03-28 | P00418 | Supplemental agreement (work within scope) | $11.06M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-02-28 | P00417 | Supplemental agreement (work within scope) | $15.21M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| 2024-02-28 | P00417 | Supplemental agreement (work within scope) | $4.72M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| 2024-02-05 | P00416 | Supplemental agreement (work within scope) | $11.89M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| 2024-01-24 | P00415 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| 2023-12-21 | P00414 | Supplemental agreement (work within scope) | $19.41M | ADDING SATELLITE SPECIFICATIONS |
| 2023-12-21 | P00414 | Supplemental agreement (work within scope) | $2.50M | ADDING SATELLITE SPECIFICATIONS |
| 2023-12-18 | P00413 | Administrative change | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| 2023-11-29 | P00411 | Supplemental agreement (work within scope) | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| 2023-11-21 | P00412 | Supplemental agreement (work within scope) | $4.57M | NEXT GENERATION OPERATIONAL CONTROL |
| 2023-11-06 | P00410 | Supplemental agreement (work within scope) | $2.65M | NEXT GENERATION OPERATIONAL CONTROL |
| 2023-10-11 | P00409 | Administrative change | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| 2023-09-28 | P00408 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2023-09-26 | A00005 | Funding only | -$83.5K | DE-OBLIGATING FY23 CANCELING FUNDS ACRN AY |
| 2023-09-22 | P00407 | Supplemental agreement (work within scope) | $2.97M | ADDING SATELLITE SPECIFICATIONS |
| 2023-09-15 | P00406 | Supplemental agreement (work within scope) | $28.48M | ADDING SATELLITE SPECIFICATIONS |
| 2023-08-28 | A00004 | Funding only | -$4.45M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| 2023-07-26 | P00405 | Supplemental agreement (work within scope) | $28.56M | ADDING SATELLITE SPECIFICATIONS |
| 2023-07-13 | P00404 | Supplemental agreement (work within scope) | $276.7K | ADDING SATELLITE SPECIFICATIONS |
| 2023-06-29 | P00403 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2023-06-21 | P00402 | Supplemental agreement (work within scope) | $2.50M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-06-21 | P00402 | Supplemental agreement (work within scope) | -$2.50M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-06-08 | P00401 | Supplemental agreement (work within scope) | $6.91M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-05-11 | P00400 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-05-05 | P00399 | Supplemental agreement (work within scope) | $917.3K | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2023-04-28 | P00398 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-04-07 | P00396 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONAL SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-04-06 | P00395 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2023-03-30 | P00397 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2023-03-20 | P00394 | Funding only | $40.97M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2023-03-15 | P00393 | Funding only | $17.31M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2023-03-15 | P00393 | Funding only | $1.12M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2023-03-08 | P00392 | Supplemental agreement (work within scope) | $15.05M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| 2023-02-28 | P00391 | Supplemental agreement (work within scope) | $11.00M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| 2023-02-24 | P00390 | Supplemental agreement (work within scope) | $0 | ADDING SATELLITE SPECIFICATIONS |
| 2023-02-01 | A00003 | Administrative change | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| 2023-01-31 | P00389 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| 2023-01-10 | P00388 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-12-21 | P00387 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-12-20 | P00386 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-12-12 | P00385 | Funding only | $15.71M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-12-06 | P00384 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-11-23 | P00383 | Supplemental agreement (work within scope) | $455.4K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| 2022-11-18 | P00382 | Supplemental agreement (work within scope) | $4.61M | ADDING SATELLITE SPECIFICATIONS |
| 2022-11-01 | P00380 | Funding only | $23.67M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX) |
| 2022-11-01 | P00380 | Funding only | $2.99M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX) |
| 2022-10-31 | P00381 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2022-10-26 | P00379 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| 2022-10-26 | P00378 | Supplemental agreement (work within scope) | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-20). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗