Putting the award page together from the records…
Putting the award page together from the records…
MH47G BLK II POST PROD LOT 5 (P11)
Up for re-bid: ends 2027-04-19. Recompete brief →
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
68 subawards totaling $30.34M (41.8% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| Lockheed Martin Corp | $10.12M | 2 | WA | 2024-06-11 | 2024-10-15 |
| Lifeport LLC | $6.38M | 2 | WA | 2023-03-21 | 2023-03-21 |
| Donaldson Company, Inc. | $3.76M | 3 | MN | 2023-04-11 | 2024-06-28 |
| Integral Aerospace, LLC | $2.53M | 3 | CA | 2023-03-21 | 2024-06-26 |
| Fulcrum Concepts LLC | $1.62M | 3 | VA | 2023-03-30 | 2024-06-04 |
| Summit Aviation Inc | $886.3K | 6 | DE | 2023-04-11 | 2024-08-21 |
| Honeywell International Inc | $595.5K | 2 | OH | 2023-09-24 | 2023-09-24 |
| Sandy Valley Fasteners, LLC | $589.9K | 5 | KY | 2023-04-11 | 2024-07-12 |
| Powell Electronics, Inc. | $544.3K | 6 | NJ | 2023-06-12 | 2024-07-10 |
| Resideo Technologies, Inc. | $463.7K | 1 | OH | 2024-06-04 | 2024-06-04 |
| Atlantic Diving Supply, Inc. |
17 actions since 2023-02-28. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-09 | P00016 | Supplemental agreement (work within scope) | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2026-05-06 | P00015 | Supplemental agreement (work within scope) | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2026-04-27 | P00014 | Change order | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2026-03-18 | P00013 | Supplemental agreement (work within scope) | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2025-12-16 | P00012 | Administrative change | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2025-12-04 | P00011 | Supplemental agreement (work within scope) | $3.44M | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2025-08-07 | P00010 | Administrative change | $0 | PROVIDE THE ENGINEERING, FABRICATION, PROCUREMENT, SUSTAINABILITY REQUIREMENTS, AND INSTALLATION SUPPORT FOR BLOCK II POST-PRODUCTION AIRCRAFT MODIFICATIONS |
| 2025-04-21 | P00009 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 AND 6 (P11) - MDR-PDR-PTR MOD |
| 2024-11-20 |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-09-30). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗
| $440.0K |
| 1 |
| VA |
| 2023-12-15 |
| 2023-12-15 |
| Electro Enterprises Inc | $399.0K | 5 | OK | 2023-04-11 | 2024-07-11 |
| Arrow Electronics, Inc. | $388.8K | 4 | TX | 2023-04-24 | 2023-10-13 |
| Alan Aircraft Services Inc. | $329.6K | 2 | IN | 2023-10-05 | 2024-06-25 |
| All-System Aerospace International, Inc. | $202.9K | 3 | NY | 2023-04-12 | 2024-07-09 |
| Ametek Inc | $160.7K | 2 | NY | 2023-04-05 | 2024-06-10 |
| L3Harris Technologies, Inc. | $136.7K | 1 | UT | 2023-08-08 | 2023-08-08 |
| Component Sourcing Solutions, Inc. | $126.7K | 3 | CA | 2023-07-11 | 2024-06-03 |
| Marathonnorco Aerospace, Inc. | $123.2K | 2 | TX | 2023-08-08 | 2023-08-08 |
| Intercomp USA Inc | $102.7K | 4 | FL | 2023-10-25 | 2024-06-05 |
| Transdigm Group Incorporated | $92.4K | 1 | TX | 2024-07-19 | 2024-07-19 |
| L&C Protec, Inc. | $77.3K | 2 | NH | 2023-04-25 | 2024-06-07 |
| Brandywine Communications | $72.4K | 1 | CA | 2023-05-04 | 2023-05-04 |
| Aircraft & Commercial Enterprises, Inc | $69.0K | 1 | KS | 2023-06-09 | 2023-06-09 |
| Wiremasters, Inc. | $49.5K | 1 | TN | 2024-10-11 | 2024-10-11 |
The 25 largest of 27; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2023-03-21 | Lifeport LLC | $6.36M | ARMOR-6472-NEST-01 |
| 2024-10-15 | Lifeport LLC | $5.29M | NON-BALLISTIC DELTA KIT; |
| 2024-06-11 | Lifeport LLC | $4.83M | VENDOR P/N: 80100-01, KIT, DOOR PLUG, |
| 2024-06-28 | Donaldson Company, Inc. | $1.90M | B-KIT - EBF SYSTEM, H-47 RH |
| 2023-04-11 | Donaldson Company, Inc. | $1.86M | B-KIT - EBF SYSTEM, H-47 RH |
| 2023-03-21 | Integral Aerospace, LLC | $1.26M | ASSEMBLY, ASE POD HOUSING, CIRCM - RHS, |
| 2024-06-26 | Integral Aerospace, LLC | $1.24M | ASSEMBLY, ASE POD HOUSING, CIRCM - LHS, |
| 2023-03-30 | Fulcrum Concepts LLC | $860.5K | AFT CENTER DRIP PAN INSTALLATION |
| 2024-06-04 | Fulcrum Concepts LLC | $756.1K | AFT XMSN DOOR INSTALLATION |
| 2023-09-24 | Grimes Aerospace Company | $595.5K | DUAL-MODE SEARCH LIGHT, SOS: HONEYWELL, |
| 2024-06-04 | Grimes Aerospace Company | $463.7K | DUAL-MODE SEARCH LIGHT, SOS: HONEYWELL |
| 2023-12-15 | Atlantic Diving Supply, Inc. | $440.0K | POWER AMPLIFIER |
| 2023-04-11 | Summit Aviation Inc | $334.5K | CH-47 CABIN DOOR ASSY, CAGE CODE: 5SWK2 |
| 2024-08-21 | Summit Aviation Inc | $327.1K | CH-47 CABIN DOOR ASSY, CAGE CODE: 5SWK2 |
| 2024-07-12 | Sandy Valley Fasteners, LLC | $276.9K | ASSEMBLY, FAN TRAY, FOR KOR-24A STT, |
| 2023-04-11 | Summit Aviation Inc | $195.0K | CH-47 CABIN DOOR ASSY, CAGE CODE: 5SWK2 |
| 2023-10-05 | Alan Aircraft Services Inc. | $175.9K | ARC-231 LOS ANTENNA, BLACK MFG: TRIV |
| 2023-06-30 | A. E. Petsche Company, Inc. | $170.4K | SHIELDING, BRAID, STAINLESS STEEL, |
| 2024-06-25 | Alan Aircraft Services Inc. | $153.7K | ANTENNA, L16 |
| 2024-06-07 | Electro Enterprises Inc | $137.9K | STAINLESS STEEL BRAID SHIELDING, 1.50 |
| 2023-08-08 | L3 Technologies, Inc. | $136.7K | ASSEMBLY, FAN TRAY, FOR KOR-24A STT, VE |
| 2024-06-26 | Powell Electronics, Inc. | $132.5K | CONNECTOR, JACK, 209J500, D38999/24 |
| 2024-07-01 | Electro Enterprises Inc | $123.5K | DUMMY RECEPTACLE |
| 2023-08-08 | Marathonnorco Aerospace, Inc. | $117.5K | STRUT, NOSE - DVEPS, MFR PER DWG, |
| 2024-06-24 | Sandy Valley Fasteners, LLC | $117.4K | POWER CONDITIONER UNIT, PCU, |
| P00008 |
| Supplemental agreement (work within scope) |
| $0 |
| MH47G BLK II POST PROD LOT 5 AND 6 (P11) - TO 2661 TO TO 2519 MTR MODIFICATION PER LM LETTER 622B7-25L-0700 DTD 19 NOVEMBER 2024. |
| 2024-10-28 | P00007 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 AND 6 (P11) - 2661 TO 2523 MATERIAL TRANSFER MODIFICATION. |
| 2024-10-08 | P00006 | Supplemental agreement (work within scope) | $7.12M | MH47G BLK II POST PROD LOT 5 AND 6 (P11) - MODIFICATION TO AWARD CHANGE PROPOSAL 2 (CP2) |
| 2024-05-22 | P00005 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 AND 6 (P11) - MODIFICATION TO TRANSFER MATERIALS TO TASK ORDERS 2519 AND 2523. |
| 2024-05-20 | P00004 | Supplemental agreement (work within scope) | $26.24M | MH47G BLK II POST PROD LOT 5 AND 6 (P11) - MODIFICATION AWARDS CHANGE PROPOSAL 1 (CP1) |
| 2023-09-19 | P00003 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 (P11) - MODIFICATION TO RECEIVE MATERIALS FROM TO 2324. |
| 2023-07-17 | P00002 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 (P11) - MDR |
| 2023-07-07 | P00001 | Supplemental agreement (work within scope) | $0 | MH47G BLK II POST PROD LOT 5 (P11) - ADMIN MOD TO UPDATE THE PWS AT NO ADDITIONAL COST. |
| 2023-02-28 | 0 | $35.83M | MH47G BLK II POST PROD LOT 5 (P11) |