DESIGN, DEVELOPMENT, AND DEVELOPMENTAL TESTING OF THE NEXT GENERATION INTERCEPTOR (NGI) ALL-UP-ROUND (AUR)
SpendQuery holds FY2023 on; earlier years are on USAspending.gov.
1573 subawards totaling $1.33B (29.0% of what was obligated), as Lockheed Martin Corporation reported them. Primes report subawards of $30,000 or more; smaller ones and unreported ones aren't here.
| Subcontractor | Amount | Subawards | Where | First | Last |
|---|---|---|---|---|---|
| L3Harris Technologies, Inc | $328.83M | 31 | AL, CA, MA, PA | 2022-10-09 | 2025-02-06 |
| The Charles Stark Draper Laboratory, Inc. | $164.95M | 8 | MA | 2023-10-04 | 2024-11-14 |
| Honeywell International Inc | $79.07M | 11 | AZ, FL | 2022-10-26 | 2023-10-04 |
| Marotta Controls Inc | $58.31M | 8 | NJ | 2022-10-13 | 2025-02-13 |
| Hunter Defense Technologies, Inc. | $51.57M | 3 | OH | 2022-11-21 | 2023-04-06 |
| Redwire Space Components, LLC | $51.08M | 1 | MA | 2024-02-13 | 2024-02-13 |
| Optical Physics Company in Nevada | $38.92M | 5 | CA | 2024-04-29 | 2025-02-26 |
| Seakr Engineering, LLC | $37.24M | 21 | CO | 2022-10-31 | 2025-02-11 |
| Ensign-Bickford Industries, Inc. | $31.61M | 27 | CT | 2022-10-03 | 2025-02-20 |
| M2 Integration LLC | $28.31M | 7 | OR | 2022-10-14 | 2024-12-11 |
| Avnet Inc | $25.88M | 137 | AZ, FL, IL | 2022-10-03 | 2025-02-28 |
| Northrop Grumman Systems Corporation | $21.99M | 2 | UT | 2024-12-24 | 2025-01-10 |
| Pip Manufacturing, Inc. | $21.58M | 4 | FL | 2024-10-07 | 2025-01-23 |
| Rockwell Collins Australia Pty Limited | $18.31M | 2 | CA | 2023-08-17 | 2024-01-11 |
| Fifth Gait Technologies, Inc. | $17.16M | 10 | CA | 2022-10-21 | 2024-10-31 |
| Space Information Laboratories, LLC | $15.45M | 7 | CA | 2023-01-19 | 2025-02-10 |
| Systima Technologies Inc | $13.10M | 10 | WA | 2023-06-22 | 2025-01-21 |
| Spirit America Labs Corp | $13.00M | 57 | AZ | 2022-10-04 | 2025-01-28 |
| Valley Tech Systems, Inc. | $12.89M | 3 | CA | 2024-03-26 | 2024-11-27 |
| Resideo Technologies, Inc. | $11.84M | 2 | FL | 2023-12-06 | 2023-12-08 |
| Ierus Technologies Inc | $11.44M | 14 | AL | 2023-02-20 | 2025-02-28 |
| General Dynamics Corporation | $11.02M | 4 | AZ | 2023-10-31 | 2025-01-29 |
| Corvid Technologies LLC | $10.62M | 4 | NC | 2023-04-24 | 2024-06-06 |
| RTX Corp | $10.34M | 7 | CA | 2022-11-16 | 2023-07-20 |
| Northrop Grumman Corporation | $9.67M | 1 | AZ | 2025-01-17 | 2025-01-17 |
The 25 largest of 283; the rest are on USAspending.gov.
| Date | To | Amount | For |
|---|---|---|---|
| 2022-10-22 | L3 Technologies, Inc. | $67.42M | MBT & VIS-T CLIN 200 AUR DEVELOPMENT NGI MBT SUBCONTRACT START-UP (CLIN 0200) |
| 2024-02-13 | Redwire Space Components, LLC | $51.08M | STAR TRACKER CLIN 200 STAR TRACKER CLIN STAR TRACKER CLIN 400 STAR TRACKER CLIN |
| 2024-11-14 | The Charles Stark Draper Laboratory, Inc. | $50.13M | KV SENSORS & NAVIGATION DEVELOPMENT - CL KV SENSORS & NAVIGATION DEVELOPMENT |
| 2024-10-24 | Aerojet Rocketdyne Inc | $44.35M | CLIN 601 |
| 2023-05-01 | Honeywell International Inc. | $33.22M | CLIN 400 MSV IMU CLIN 601 MSV-IMU ##NGI MSV INERTIAL MEASUREMENT UNIT## |
| 2024-05-21 | Aerojet Rocketdyne Inc | $30.42M | KV DACS (CLIN 0601) |
| 2023-12-15 | The Charles Stark Draper Laboratory, Inc. | $29.25M | KV SENSORS & NAVIGATION DEVELOPMENT - CL |
| 2023-03-22 | Marotta Controls Inc | $27.04M | MSV PDU CLIN 0200 MSV PDU CLIN 0601 |
| 2024-08-09 | Aerojet Rocketdyne Inc | $26.89M | CLIN 0200 - SRM AUR DEVELOPMENT |
| 2022-11-21 | HDT Expeditionary Systems Inc | $26.69M | HDT - MT ET AND PROOFLOAD SOW |
| 2023-01-19 | HDT Expeditionary Systems Inc | $26.69M | HDT - MT ET AND PROOFLOAD SOW |
| 2023-10-04 | The Charles Stark Draper Laboratory, Inc. | $25.76M | ##CLIN 400##AUR DEVELOPMENT TEST SUPPORT KV SENSORS & NAVIGATION DEVELOPMENT - CL KV SENSORS & NAVIGATION DEVELOPMENT REQUEST 4 NTE & PROPOSAL THE CHARLES S |
| 2024-03-27 | Aerojet Rocketdyne Inc | $23.40M | CLIN 0200 - SRM AUR DEVELOPMENT |
| 2024-08-20 | Optical Physics Company in Nevada | $21.73M | ##AUR TEST ARTICLE MATERIAL##CLIN 601 |
| 2024-12-24 | Northrop Grumman Systems Corporation | $21.51M | ##NG FS SRM CLIN 200## ##NG FS SRM CLIN 601## |
| 2023-07-10 | Honeywell International Inc. | $21.41M | 2021-LL-FEU - BUY LONG LEAD PARTS FEUS OPERATE THROUGH PROCESSOR SERVICES |
| 2024-08-22 | The Charles Stark Draper Laboratory, Inc. | $20.44M | KV SENSORS & NAVIGATION DEVELOPMENT |
| 2024-12-09 | Aerojet Rocketdyne Inc | $19.66M | CLIN 0200 - SRM AUR DEVELOPMENT |
| 2023-05-22 | M2 Integration LLC | $18.53M | M2 FEU LSG AND LDT EFFORT |
| 2024-05-20 | Aerojet Rocketdyne Inc | $18.44M | CLIN 601 |
| 2024-01-11 | Raytheon Company | $18.25M | CLIN 0200 - LWIR AND VIS START-UP |
| 2024-08-14 | Aerojet Rocketdyne Inc | $14.21M | NGI KV DACS DEVELOPMENT (CLIN 0200) |
| 2023-12-20 | L3 Technologies, Inc. | $14.05M | MBT & VIS-T CLIN 601 MATERIAL |
| 2024-04-18 | The Charles Stark Draper Laboratory, Inc. | $13.38M | KV SENSORS & NAVIGATION DEVELOPMENT |
| 2024-02-01 | The Charles Stark Draper Laboratory, Inc. | $13.20M | KV SENSORS & NAVIGATION DEVELOPMENT |
72 actions since 2022-10-21. Each is a modification or amendment with the money it added or took back.
| Date | Modification | Kind | Amount | What the agency wrote |
|---|---|---|---|---|
| 2026-06-24 | P00093 | Supplemental agreement (work within scope) | -$130.00M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-06-11 | P00092 | Funding only | $34.50M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-06-10 | P00091 | Funding only | $176.64M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-05-21 | P00090 | Supplemental agreement (work within scope) | $176.50M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-04-14 | PZ0089 | Change order definitized | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-03-18 | P00088 | Funding only | $484.27M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-03-13 | P00087 | Supplemental agreement (work within scope) | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-02-27 | P00086 | Administrative change | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-01-22 | P00085 | Funding only | $19.98M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2026-01-05 | P00084 | Administrative change | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-12-18 | P00083 | Funding only | $10.00M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-11-24 | P00082 | Funding only | $400.00M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-11-21 | PZ0081 | Change order definitized | $24.00M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-11-14 | P00080 | Change order definitized | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-10-28 | P00079 | Administrative change | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-10-22 | P00078 | Administrative change | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-09-29 | P00077 | Funding only | $71 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-09-05 | P00076 | Option exercised | $10.0K | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-08-28 | PZ0075 | Change order definitized | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-07-29 | P00073 | Funding only | $172.75M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-06-24 | PZ0072 | Change order definitized | $105.21M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-06-24 | P00074 | Funding only | $73.60M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. |
| 2025-05-14 | PZ0071 | Change order definitized | $197.89M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR IN ACCORDANCE WITH THE STATEMENT OF WORK, SECTION J, ATTACHMENT 01, AND OTHER SECTION J ATTACHMENTS AND EXHIBITS. |
| 2025-04-17 | P00070 | Funding only | $125.00M | DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR IN ACCORDANCE WITH THE STATEMENT OF WORK, SECTION J, ATTACHMENT 01, AND OTHER SECTION J ATTACHMENTS AND EXHIBITS. |
| 2025-04-15 | P00069 | Administrative change | $0 | DESIGN, DEVELOPMENT, INTEGRATION, TEST AND DELIVERY OF THE NEXT GENERATION INTERCEPTOR |
| 2025-03-26 | P00068 | Administrative change | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2025-03-24 | P00067 | Funding only | $12.30M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2025-03-07 | P00066 | Change order definitized | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2025-02-20 | P00065 | Change order definitized | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2025-01-31 | P00064 | Funding only | $275.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2025-01-31 | P00063 | Change order definitized | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-12-20 | P00062 | Supplemental agreement (work within scope) | $101.12M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-11-08 | P00061 | Funding only | $311.9K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-11-07 | P00060 | Administrative change | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-10-25 | P00059 | Funding only | $328.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-10-25 | P00058 | Funding only | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-10-02 | P00057 | Supplemental agreement (work within scope) | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-09-12 | P00056 | Funding only | $14.5K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-09-05 | P00055 | Funding only | $4.33M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-07-30 | P00054 | Option exercised | $250.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-07-01 | P00053 | Change order definitized | $24.28M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-06-26 | P00052 | Change order | $25.5K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-06-18 | ARZ998 | Administrative change | $0 | DESIGN, DEVELOPMENT, AND DEVELOPMENTAL TESTING OF THE NEXT GENERATION INTERCEPTOR (NGI) ALL-UP-ROUND (AUR) |
| 2024-05-30 | P00051 | Change order definitized | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-05-17 | P00050 | Funding only | $6.50M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-05-03 | P00049 | Funding only | $181.40M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-04-24 | P00048 | Funding only | $27.41M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-04-04 | P00047 | Funding only | $40.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-02-29 | P00046 | Administrative change | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-02-14 | P00045 | Funding only | $80.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-01-30 | P00044 | Funding only | $10.69M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2024-01-25 | P00043 | Funding only | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-12-08 | P00042 | Funding only | $355.19M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-11-17 | P00041 | Change order definitized | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-11-08 | P00040 | Funding only | $2.27M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-11-02 | P00039 | Option exercised | $30.33M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-10-25 | P00038 | Funding only | $128.50M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-09-29 | P00037 | Funding only | $4.0K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-09-22 | P00036 | Funding only | $34 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-08-29 | P00035 | Funding only | $40.6K | NEXT GENERATION INTERCEPTOR |
| 2023-08-16 | P00034 | Administrative change | $0 | MOD TO MOVE FUNDS BETWEEN SUBCLINS |
| 2023-08-11 | P00033 | Funding only | $22.39M | INCREMENTAL FUNDING |
| 2023-08-08 | P00032 | Funding only | -$22.25M | DE-OBLIGATION OF FY22 AND FY23 FUNDS |
| 2023-06-23 | P00031 | Funding only | $35.78M | INCREMENTAL FUNDING FOR CLIN 0601 |
| 2023-04-20 | P00030 | Funding only | $39.80M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-03-29 | P00029 | Funding only | $379.8K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-03-06 | P00028 | Funding only | $450.25M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2023-01-31 | P00027 | Funding only | $64.00M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2022-12-14 | P00026 | Funding only | $850.0K | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2022-12-01 | P00025 | Administrative change | $115.97M | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2022-11-30 | P00024 | Supplemental agreement (work within scope) | $0 | NGI AUR DEVELOPMENT PRE-KP#3 |
| 2022-10-21 | P00023 | Funding only | $166.36M | NGI AUR DEVELOPMENT PRE-KP#3 |
Source: USAspending.gov prime award transactions and FSRS subaward reports, as loaded by SpendQuery (data as of 2026-10-21). Amounts are obligations (money committed), not outlays. The official record on USAspending.gov ↗